1 01/2004(M) Suo motu

Chhattisgarh State Electricity Board Respondent
Unauthorized tapping and temporary connections more than 35 meters length of service lines. Plans for regularizing them and disconnection if not regularized. 29/12/2004
Proceeding
Disposed
2 02/2004 Suo motu

CSEB - Respondent
Power purchase agreements executed by CSEB without getting approval of the Commission. 29/12/2004
Proceeding
Revised on
03/03/2005


Revised on
15/02/2005


Order passed on
02/01/2005


3 01/05 Suo motu CSEB-Respondent

Unscheduled load shedding by CSEB 19/01/2005
Proceeding
Order Passed on
28/03/2005


4 02/05 Suo motu CSEB-Respondent

Cent percent metering by CSEB 25/01/2005
Proceeding
Orders passed on
20/04/2007


Orders passed on
25/04/2005


Orders passed on
15/04/2005


5 03/05 Jindal Steel and Power Ltd., Raigarh

Application for Distribution license 31/01/2005
Proceeding
Licence issued on
29/11/2005


Order Passed on
29/09/2005


Appeal before Tribunal. Order passed on 11.05.2006. Website link
6 04/05 Steel Authority of India Ltd. (Bhilai Steel Plant ), Bhilai

Application for Distribution license 18/02/2005
Proceeding
Licence issued on
20/12/2005


Order Passed on
09/11/2005


7 05/05 Chhattisgarh State Electricity Board, Raipur
V/s
Application for determination of ARR & Tariff for the year 2005-06 11/03/2005
Proceeding
Order Passed on
15/06/2005


Appeal before Tribunal. order passed on 14.11.2006. Website link
8 06/05 Shri Santosh Agrawal President, Chhattisgarh Mini Steel Plant Association, Raipur
V/s
CSEB
Petition for power supply with time management and other related reliefs 23/04/2005
Proceeding
Case closed on 12.08.2005
9 07/05 Chhattisgarh Bio-mass Energy Developer Association (CBEDA), Raipur
V/s
1. Govt. of C.G. 2. CREDA 3. CSEB
Petition for review and revision of tariff structure and for deciding other issues, relating to Bio-mass Energy Generators. 06/05/2005
Proceeding
Order Passed on
15/01/2008


Order Passed on
11/11/2005


Appeal before Tribunal. order passed on 06.11.2009 Website link
10 08/05 Suo motu CSEB-Respondent

Show cause notice under section 146 for non-compliance of Commission's order, 30/05/2005
Proceeding
Closed on 29.10.2005
11 09/2005(M) De-registered as per order dated 29.10.05

De-registered 13/06/2005
Proceeding
12 10/05 M/s Vandana Global Ltd., Raipur

For grant of permission to supply power to four sister concerns, by wheeling power through the grid and transmission lines of the CSEB 07/06/2005
Proceeding
Order Passed on
24/09/2005


Appeal before Tribunal. order passed on 06.12.07 Website link
13 11/05(M) Shri Bajrang Power & Ispat Ltd. (SBPIL), Raipur
V/s
1. Govt. of C.G. 2. CSEB
Petition for deciding power purchase and other related matter in respect of Captive Power Plant U/s 9, 42(2) and 30 of Electricity Act 2003 05/07/2005
Proceeding
Order Passed on
06/02/2006


Attached with Petition No. 17/05
14 12/05(M) M/s Ispat Godawari Limited, Raipur
V/s
1. Govt. of C.G. 2. CSEB 3. CREDA
Petition under section 9 read with 42(2) of Electricity Act 2003. 02/07/2005
Proceeding
Petition withdrawn on 27.08.2005
15 13/05(M) Chhattisgarh Bijali Karmachari Mahasangh, Raipur
V/s
1. M/s Jindal Steel and Power Ltd., Raigarh 2- Govt. of C.G.
Petition Under section 12,13,14,19 and 5. 142 read with Section. 149 of the Electricity act 203 and regulations 11.1 to 11.4 of the CSERC (License) Regulations 2004 04/07/2005
Proceeding
Rejected at the stage of admission on
22/07/2005


16 14/05(M) Chhattisgarh Steel Rerollers Association, Raipur
V/s
CSEB
Application for review of tariff order passed in petition no 5/2005 22/07/2005
Proceeding
Order Passed on
12/08/2005


17 15/05(M) Mahesh Kakkar, Chairman, Chhattisgarh Udyog Mahasangh, Raipur
V/s
CSEB
Application for review of tariff order passed in petition no 5/2005 2005-06 22/07/2005
Proceeding
Order Passed on
12/08/2005


18 16/05(M) Bharat Alluminium Company Ltd., Korba
V/s
CSEB
Petition for recalling/reviewing of the order date June 15, 2005 passed in case no. 5/2005 14/07/2005
Proceeding
Order Passed on
17/10/2005


Appeal before Tribunal. Order passed on 17.11.2006. Website link
19 17/05(M) J.P. Saboo, President, Urla Industries Association, Raipur (M/s Jayaswals Nico Ltd. (Petition No. 29 of 2005), M/s Bajrang Power & Ispat Ltd (petition No. 11 of 2005) and M/s BALCO, (Petition No.

Petition for deciding power purchase and related matters in respect of Captive power plant U/s 4, 42, 86(1) of and Electricity Act 2003. 12/07/2005
Proceeding
Reviewed vide order Passed on 29.09.2006 in petition No. 16 of 2006
29/09/2016


Order Passed on
06/02/2006


Appeal before Tribunal, Order passed on 12.09.2006 & 16.11.2006. Appeal before Tribunal, Order passed on 21.02.2011 in appeal No. 270/2006.
20 18/05(M) Ultra Tech Cement Limited, Distt. Raipur
V/s
CSEB
Petition for review the order dated 15.06.2005 in petition no. 5/05, 19/07/2005
Proceeding
Rejected at the stage of admission on
25/08/2005


21 19/05(M) Jayaswals Neco Ltd.
V/s
CSEB
Review of tariff order in petition no 5/2005, 23/07/2005
Proceeding
Order passed on
26/09/2017


Order Passed on
05/10/2005


Appeal before Tribunal. Order passed on 05.04.2006 Website link
22 20/05(M) Suo motu (1) CSEB (2) M/s Vandana Vidyut Ltd., Raipur (3) M/s Indo Lahari Bio-Power Ltd., Raipur

Wheeling of power to third party 29/07/2005
Proceeding
Order Passed on
02/08/2005


Appeal before Tribunal. Order passed on 16.10.2006 Website link
23 21/05(CC) M/s Dhote Printers(P) Ltd., Raipur
V/s
CSEB
Application for declaring the applicant as Industrial Consumer in place of Commercial Consumer. 30/07/2005
Proceeding
Rejected on
17/08/2005


24 22/05(M) M/s Real Ispat and Power Ltd., Raipur
V/s
CSEB
Petition for deciding power purchase, wheeling of power, banking of power and other dispention in respect of Captive Power plant 01/08/2005
Proceeding
Order Passed on
29/10/2005


25 23/05(M) Er. Shyam Kabra, Chairman, LT Consumer Sub Committee of Urla Industries Association, Raipur

Petition for review of tariff order dated 15.06.05 16/08/2005
Proceeding
Review petition was not admitted.
13/09/2005


26 24/05(M) 1. Chhattisgarh Krishi Vaniki Samaj, Durg 2. Mool Chand jain, General Secretary, Chhattisgarh Krishi vanki Samaj, Durg
V/s
CSEB
Review petition against tariff order dated 15.06.2005, with respect to plantation 16/08/2005
Proceeding
Order Passed on
22/03/2006


Appeal before Tribunal. Order passed on 16.10.2006 Website link
27 25/05(M) Shri Bajrang Power Ispat Ltd. (SBPIL), Raipur
V/s
CSEB
Petition for providing open access and wheeling of power by captive user for self consumption through CSEB grid 18/08/2005
Proceeding
Order Passed on
14/10/2005


Appeal before Tribunal. order passed on 06.12.07 Website link
28 26/05(M) M/s Jayswal NECO Ltd., Raipur
V/s
CSEB
Deciding power purchase wheeling of power Banking of power Tariff structure by the distribution licensee and other dispensation in respect of industries equipped with captive power plant. 27/08/2005
Proceeding
Withdrawn by the petitioner on 09.09.2005
29 27/05(M) M/s Shri Bajarang Power & Ispat ltd., Raipur
V/s
CSEB
Petition for reduction in contract demands 18/07/2005
Proceeding
Order Passed on
02/09/2005


30 28/05 M/s Indo Lahri Bio Power Ltd., Raipur
V/s
CSEB
Petition for deciding power sale to third party in respect of non-conventional existing bio-mass plant 31/08/2005
Proceeding
Petition withdrawn by the petitioner on 23.11.2005
31 29/05(M) M/s Jayaswal NECO Ltd., Raipur
V/s
CSEB
Petition for deciding power purchase rate and banding of power by the distribution licensee with respect to co-generation based captive power plant 06/09/2005
Proceeding
Order Passed on
06/02/2006


Attached with Petition No. 17/05
32 30/05(M) M/s. Monnet Ispat Ltd, Raipur
V/s
CSEB
Petition for deciding Power Tariff in respect to start up power. 12/09/2005
Proceeding
Order Passed on
17/02/2005


Appeal before Tribunal. Order passed on 23.11.2006. & 17.05.2007 Website link
33 31/05(M) M/s. Real Ispat and Power Ltd., Raipur
V/s
CSEB
Petition for reduction in contract demands 20/09/2005
Proceeding
The Commission has approved petitioner to avail 1500KVA contract demand at 132 KV.
34 32/05(M) KVK Bio-Energy Pvt. Ltd. Distt: Janjgir Champa
V/s
CSEB
Petition for reduction in contract demands 23/09/2005
Proceeding
The Commission has approved petitioner having 15MW installed capacity to avail 1600 KVA contract demand at 132 KV.
35 33/05 (M) M/s Ajanta Paper and Board Mills, Raipur
V/s
CSEB
Petition for refund of Rs. 5,99,063/- which was illegally recovered by the respondent, damages, interest and other reliefs. 17/08/2005
Proceeding
Order Passed on
27/10/2005


36 34/05(M) M/s Hy-Grade Pellets Ltd., Kirndul
V/s
CSEB
Petition for putting the petitioner in category of HV-5, instead of HV-6, in tariff order for 2005-06. 18/10/2005
Proceeding
Order Passed on
31/12/2005


37 35/05(M) M/s Jain Carbides & Chemicals Ltd., Raipur
V/s
CSEB
Petition for surrender of power and sanction of stand by demand in respect of captive power plants based on Industrial waste fuel. 21/10/2005
Proceeding
Rejected at the stage of admission on
25/11/2005


38 36/05(M) M/s Hira Ferro Alloys Ltd., Raipur
V/s
CSEB
Petition for surrender of power sanction of stand by demand and provision of open access in respect of captive power plants based on Industrial waste fuel. 21/10/2005
Proceeding
Order Passed on
05/04/2006


Appeal before Tribunal. Order passed on 12.09.2006 Website link
39 37/05(M) M/s Alok Ferro Alloys Ltd., Raipur
V/s
CSEB
Petition for surrender of power and sanction of stand by demand in respect of captive power plants based on Industrial waste fuel. 21/10/2005
Proceeding
Rejected at the stage of admission on
25/11/2005


40 38/05(M) M/s Godawari Power & Ispat Ltd., Raipur
V/s
CSEB
Sanction of additional load, payment of power injected in grid and providing deferent category in electricity tariff for cogen based C.P.P. 21/10/2005
Proceeding
Rejected at the stage of admission on
24/11/2005


41 39/05(M) M/s Jayaswal's NECO Ltd., Raipur
V/s
CSEB
Petition for correction of wrong categorization of tariff for their connection for intakewel pump house. 29/10/2005
Proceeding
Order Passed on
24/12/2005


42 40/05(M) SuoMotu CSEB-Respondent

Purchase of power from out side sources without obtaining permission and violation of the directives of the Commission 07/10/2005
Proceeding
Order Passed on
11/11/2005


43 41/05(M) CSEB

Application for review of the Commission's Order dated 11.11.2005 (Passed in P.No. 40/2005) 21/11/2005
Proceeding
Order Passed on
23/01/2006


44 42/05(M) M/s Salasar Sponge & Power Ltd., Raipur
V/s
CSEB
Petition for reduction in sanctioned contract demand 26/11/2005
Proceeding
Order Passed on
20/12/2005


45 43/05(M) M/s. Vimal Constructions, Raipur
V/s
CSEB
Appeal against order dated 25.10.05 passed by Electricity Consumers Grievances Redressal Forum, Raipur in case No. 01/2005. 30/11/2005
Proceeding
Order Passed on
04/02/2006


46 44/05(M) Agrawal Poha mill, Raipur
V/s
CSEB
Representation against order dated 29.10.2005 passed by Consumers Grievances Redressal Forum, Raipur in case No. 02/2005. 29/11/2005
Proceeding
Order Passed on
31/12/2005


47 01/06(M) SuoMotu CSEB-Respondent

Purchase of power by CSEB without obtaining permission of the Commission 05/01/2006
Proceeding
Order Passed on
28/01/2006


48 02/06(M) Raghuvir Ferro Alloys Ltd., Raipur
V/s
CSEB
Petition for restoration of contract demand from 60 KVA to 7000 KVA without charging supply arranging charges. 16/01/2006
Proceeding
Petition Dismissed on
02/02/2006


49 03/06(M) Suo Motu CSEB-Respondent

Determination of transmission charges, wheeling charge, cross-subsidy surcharge and other charges under open access. 15/02/2006
Proceeding
Order Passed on
15/02/2006


50 04/06(M) CSEB
V/s
M/s Vandana Global Ltd., Raipur
Review petition in the matter of grant of open access in Petition No. 10/2005 06/02/2006
Proceeding
Rejected at the stage of admission on
28/04/2006


Appeal before Tribunal. order passed on 06.12.07 Website link
51 05/06(T) M/s Indo Lahri Bio Power ltd. Raipur
V/s
CSEB
Representation of determination of tariff for non-conventional energy generation based on agricultural residues. 01/03/2006
Proceeding
Withdrawn by the petitioner
52 06/06(M) M/s Bharat Alluminium Company Ltd. Korba Balco
V/s
CSEB
Petition for reviewing order dated 06.02.2006 passed in petition no. 17 of 2005(M) 09/03/2006
Proceeding
Order Passed on
27/12/2006


53 07/06(M) M/s KVK Bio Energy pvt. Ltd. Hydrabad
V/s
CSEB
Petition for seeking direction to CSEB not to insist on installation of ABT meter. 09/03/2006
Proceeding
Order Passed on
10/05/2006


54 08/06(M) M/s Real Ispat and Power Ltd. Raipur
V/s
CSEB
Petition for obtaining clarification regarding reduction in contract demand, determination of transmission charges, wheeling charges, cross subsidy surcharges etc. permission for Open Access and seeking time to install ABT meters. 09/03/2006
Proceeding
Order Passed on
10/10/2006


55 09/06(M) M/s Raghuvir Ferro Alloys Ltd., Raipur
V/s
CSEB
Petition for restoration of contract demand from 60 kVA to 7000 kVA charging supply arranging charges of actual cost basis. 20/03/2006
Proceeding
Order Passed on
23/05/2006


Appeal before Tribunal. Order passed on 28.11.2006. Website link
56 10/06(M) CSEB
V/s
M/s Bajrang Power & Ispat Ltd. Raipur
Review petition under sec 43(1) & 49(1) & (2) of Conduct of Business Regulation 2004 in the matter of grant of open access under petition no. 25/2005 23/03/2006
Proceeding
Rejected at the stage of admission on
28/04/2006


Appeal before Tribunal. order passed on 06.12.07 Website link
57 11/06(M) M/s Jayaswals NECO Ltd. Raipur
V/s
CSEB
Review petition for determination of tariff and captive co-generation plants. 30/03/2006
Proceeding
Petition is rejected since there is no ground for admission on
22/04/2006


58 12/06(M) M/s Shrinivas Ferro Alloys Ltd. Raipur
V/s
CSEB
Petition for restoration of contract demand from 4000 KVA to 8000 KVA changing supply arranging charges on actual cost basis. 03/04/2006
Proceeding
(this order is set aside by the Tribunal) Order Passed on
23/05/2006


Appeal before Tribunal. Order passed on 28.11.2006 Website link
59 13/06(M) J.P.Saboo, President, Urla Industries Association, Urla Raipur
V/s
CSEB
Review of Commission's order dated 06.02.06 passed in petition no 17 of 2005(M) 04/04/2006
Proceeding
Rejected at the stage of admission on
04/05/0200


Appeal before Tribunal. Order passed on 16.11.2006. Website link
60 14/06(M) M/s Vandana Vidyut Ltd. Raipur
V/s
CSEB
Change of allocation of third party for rate of power from the non-conventional biomass based power plant. 31/03/2006
Proceeding
Order Passed on
26/10/2006


Order Passed on
05/06/2006


Appeal before Tribunal. Order passed on 16.10.2006 Website link
61 15/06(M) M/s Bajrang Power & Ispat Ltd. Raipur
V/s
CSEB
Review against order dated 06.02.06 passed in the matter of power purchase and related dispresentation in respect of Captive Generation Plant. 07/04/2006
Proceeding
Rejected at the stage of admission on
04/05/2006


62 16/06(M) CSEB

1. Shri J.P. Saboo, President Urla Industries Association, Raipur 2. Jayaswals NECO Ltd., Raipur 3. Shri Bajarang Power & Ispat ltd. Raipur. 4. Bhart aluminium Company Ltd. Korba
Review of the order passed on 06.02.2006 in petition No. 17 of 2005(M) on issues relating to captive power plants. 21/04/2006
Proceeding
Order Passed on
29/09/2006


Appeal before Tribunal, Order passed on 21.02.2011 in appeal No. 270/2006. Website link
63 17/06(M) Chhattisgarh Mini Steel Plant Association, Raipur
V/s
CSEB
Directions to distribution licensee U/s 23 of the Electricity Act 2003 for maintaining efficient supply of power 27/04/2006
Proceeding
Order Passed on
18/07/2006


64 18/06(M) Sai Chemicals Private Ltd., Bhilai
V/s
CSEB
Restoration of contract demand from 60 KVA to 3500 KVA, charging supply arranging charges on actual cost basis. 02/05/2006
Proceeding
(this order is set aside by the Tribunal) Order Passed on
23/05/2006


Appeal before Tribunal. Order passed on 28.11.2006 Website link
65 19/06(L) Indian Railways

Grant of licence for transmission of electricity U/s 14 of the Electricity Act 2003. 06/03/2006
Proceeding
Case Closed on 25.11.2006 Appeal before Tribunal. Order passed on 10.07.2006 Website link
66 20/06(T) Chhattisgarh Hydro Power (P) Ltd.
V/s
CSEB
Fixation of tariff for 9.9 M.W. small hydro power project u/s 62 and 86(1)(e) of the Electricity Act 2003 01/05/2006
Proceeding
Order Passed on
26/10/2006


Order Passed on
28/02/2007


an appeal No. 48/07 against the order of Commission is pending before the Appellate Tribunal
67 21/06(M) Monnet Ispat and Energy Ltd.
V/s
CSEB
Wrong categorisation of intakewell pump house connection for tariff 05/05/2006
Proceeding
Order Passed on
28/06/2006


68 22/06(L) Jindal Steel and Power Ltd., Raigargh
V/s
CSEB
Petition for renewal of licence for transmission of power generated by C.P.P. of JSPL 26/04/2006
Proceeding
Order Passed on
20/04/2007


69 23/06(M) Salasar Sponge and Power Ltd., Raipur
V/s
CSEB
Petition for exception from the requirement of on independent connectivity to a dedicated bay at the 132 KV substation of CSEB for grant of open access/evacuation of power 22/05/2006
Proceeding
Petition has been withdrawn by the petitioner on 05.12.2006
70 24/06(T) CSEB

Application for determination of ARR and tariff for the year 2006-07 30/05/2006
Proceeding
Order Passed on
13/09/2006


Appeal before Tribunal. Order passed on 27.08.2007 Website link
71 25/06 Suo Motu 1. Jayaswals NECO Ltd., Raipur 2. CSEB- .....Respondents

Power factor incentive/penalty 07/06/2006
Proceeding
Order Passed on
10/10/2006


Appeal before Tribunal. Order passed on 24.04.2007 Website link
72 26/06(M) Prakash Industries Ltd., Champa
V/s
1. Cheif Engineer (Commercial), CSEB, Raipur 2. Cheif Enginner (B.R.), CSEB, Bilaspur
Wrong categorisation of tariff for electrical connection of intake well pump house (Industrial and non-industrial) 23/06/2006
Proceeding
Order Passed on
21/09/2006


73 27/06(D) Arasmeta Captive Power Company Pvt. Ltd., Mumbai
V/s
CSEB
Petition for dispute resolution regarding agreement of short term open access between the parties. 05/07/2006
Proceeding
Order Passed on
25/11/2006


74 28/06(M) Jindal Steel and Power Ltd., Raigarh

Proposal for approval of tariff in the licence area 30/06/2006
Proceeding
Order Passed on
17/07/2006


75 29/06(M) Grasim Industries Ltd., Nagada
V/s
CSEB
Petition for increase in contract demand charging supply arranging charge on actual cost basis. 27/07/2006
Proceeding
Order Passed on
02/12/2006


76 30/06(M) Ultratech Cement Ltd., Hirmi
V/s
CSEB
Petition for increasing contract demand charging supply arranging charges on actual cost basis 27/07/2006
Proceeding
Order Passed on
02/12/2006


77 31/06(M) Uniworth Ltd., Urla, Raipur
V/s
CSEB
Petition for refund of the amount of Rs. 37,37,500/- levied as line affording charges by the respondent. 07/08/2006
Proceeding
Order Passed on
05/12/2006


78 32/06(M) Monnet Ispat and Energy Ltd., Mandir Hasaud
V/s
CSEB
Review of the order dated 28.06.06 passed in petition No. 21/06(M) to retain two connection. 18/08/2006
Proceeding
Order Passed on
02/12/2006


79 33/06(M) Jindal Steel and Power Ltd.

Review of the order dated 17.07.06 passed in petition No. 28/06(M) to fix only the maximum ceiling of tariff for the applicant. 18/08/2006
Proceeding
Order Passed on
29/01/2007


Appeal before Tribunal. Order passed on 04.10.2007 Website link
80 34/06(M) Deepak Ferro Alloys Ltd., Raipur
V/s
CSEB
Petition for restoration of contract demand for 125 KVA to 4000 KVA charging supply arranging charges on actual cost basis. 24/08/2006
Proceeding
Order Passed on
28/12/2006


81 35/06(T) Aryan Coal Benefications Pvt. Ltd., New Delhi
V/s
CSEB
Determination of generation tariff for sale of power (Project is based on coal rejects, a non-conventional energy source) 08/09/2006
Proceeding
Order Passed on
15/02/2007


82 36/06(M) Bharat Aluminium Company Ltd., Korba
V/s
CSEB
For review the order dated 13.09.2006 passed in petition No. 24 of 2006(T) i.e. the tariff petition of the CSEB 11/10/2006
Proceeding
Order Passed on
02/12/2006


83 37/06(M) Ultra Tech Cement Company Ltd., Hirmi
V/s
1. CSEB 2. State Load Despatch Centre, Bhilai
Providing short term open access for wheeling for captive use U/s 9(2) & 42(2)of the Electricity Act 2003 and U/R 23(2) &24 of the CSERC (Intra State Open Access in Chhattisgarh) Regulation 2006 12/10/2006
Proceeding
Order Passed on
13/11/2007


84 38/06(M) 1. Chhattisgarh Krishi Vaniki Samaj, Durg 2. Moolchand Jain, Durg
V/s
CSEB
Review petition u/s 94(E) of the Electricity Act 2003, in the matter of tariff with respect to tree plantation by order dated 13.09.06 13/11/2006
Proceeding
Order Passed on
23/02/2007


85 39/06(M) SuoMotu CSEB-Respondent

In view of para No. 15 & 18 of order dated 12.09.2006 passed by Electricity Appellate Tribunal in appeal No. 99/2006 non submission of proposal for review of parallel operation charges as directed by Commission vide letter No. 1304 dated 26.09.2006 05/12/2006
Proceeding
Order Passed on
25/06/2009


Along with Glossary
31/12/2008


Order Passed on
31/12/2008


86 40/06(M) SuoMotu CSEB-Respondent

Determination of miscellaneous and general charges. 08/12/2006
Proceeding
Order Passed on
10/08/2007


87 41/06(M) Real Ispat and Power Ltd., Raipur
V/s
Chhattisgarh State Electricity Board, Raipur
To review order dated 10.10.2006 passed in Petition No. 8 of 2006(M) under Regulation 48 of the CSERC (Conduct of Business) Regulation 2004 18/12/2006
Proceeding
Rejected at the stage of admission on
18/01/2007


88 01/07(M) Monnet Ispat and Energy Ltd.
V/s
CSEB, Raipur
Application for intervention in petition No. 16 of 2006(M). 04/01/2007
Proceeding
Order Passed on
07/01/2007


89 02/07(M) Monnet Ispat and Energy Ltd. Raipur
V/s
CSEB, Raipur
Petition to review order dated 02.12.06, passed in P.No.32 of 2006(M) 01/01/2007
Proceeding
Order Passed on
20/04/2007


90 03/07(M) Arasmeta Captive Power Company Pvt. Ltd., Mumbai
V/s
CSEB, Raipur
Petition for a limited modification/clarification of the judgment and order dated 25.11.06, on the extent it relates to the observation in paragraph 8(ii) of the judgment & order. 04/01/2007
Proceeding
Order Passed on
03/02/2007


91 04/07(M) G.R. Sponge and Power Ltd., Raipur

For providing status of captive power producer and permission for transsport of energy to captive power user through dedicated transmission line 17/01/2007
Proceeding
Order Passed on
20/08/2007


Appeal before Tribunal. Order passed on 05.02.2008 Website link
92 05/07(M) M/s Kankai Steel Pvt.Ltd.Bhilai
V/s
The Superintending Engineer CSEB Durg.
Punisment for non Compliance of Direction issued U/s 142 &146 of Electricity 01/02/2007
Proceeding
Order Passed on
03/04/2007


93 06/07(M) Monnet Ispat & Energy Ltd.
V/s
CSEB, Raipur
To grant status of captive consumer to M/s. Monnet Ispat Industries Ltd. 12/03/2007
Proceeding
Order Passed on
28/11/2007


94 07/07(M) Suo Motu CSEB....Respondent

Additional measures to be taken during summer season of 07 for regulating supply of electricity. 13/03/2007
Proceeding
Order Passed on
28/03/2007


95 08/07(M) Suo Motu

CSEB Respondent
Violation of the provision of the Act & directives of the Commission in respect of Call Centres & Zonal office punishable under Sec. 142 of the Electricity Act. 21/03/2007
Proceeding
Order Passed on
19/07/2007


Appeal before Tribunal. Order passed on 20.02.2008 Website link
96 09/07(M) Suo Motu CSEB Respondent

Open Access Regulations compliance by CSEB action under section 142 of the Act. 20/04/2007
Proceeding
Order Passed on
07/07/2007


97 10/07(M) Chhattisgarh Hydro Power (P) Ltd., Raipur
V/s
Secretary, CSEB, Raipur
Relaxation in provisions of Grid code under clause 13.5 of Chhattisgarh State Electricity Grid Code. 28/05/2007
Proceeding
Order Passed on
06/07/2007


98 11/07(M) M/s. Kankai Steel Pvt. Ltd., Raipur
V/s
Superintending Engineer, CSEB, Durg
Incomplete or noncompliance in full of order dated 03/04/07 petition to set aside the Assessment made by respondent. 07/06/2007
Proceeding
Order Passed on
22/06/2007


99 12/07(M) M/s. Monnet Ispat and Energy Ltd., Raipur
V/s
CSEB, Raipur
Determination power tariff in respect of startup power for Captive Plants. 11/06/2007
Proceeding
Order Passed on
16/11/2007


100 13/07(L) M/s Jindal Steel & Power Ltd., Raigarh
V/s
CSEB, Raipur
Review petition against order dated 20.04.07 passed in petition no. 22 of 2006(L) 26/06/2007
Proceeding
Order Passed on
14/08/2007


101 14/07(L) M/s Nalwa Steel & Power Ltd., New Delhi
V/s
CSEB, Raipur
Review petition against order dated 20.04.07 passed in petition no. 22 of 2006(L) 27/06/2007
Proceeding
Order Passed on
14/08/2007


102 15/07(M) M/s. Jindal Steel & Power Ltd., Raigarh
V/s
CSEB, Raipur
Petition to set aside the circular No. 4170 dated 19/03/07, to direct the Board for withdrawal of the supplementary bill of Rs. 86,72,441/- and direct the Board to calculate the capacity of the DG/PG sets for billing of parallel operation charges at 0.9 PF. 09/07/2007
Proceeding
Order Passed on
20/07/2007


103 16/07(M) Shri Dharmdas Meghani, Raipur
V/s
CSEB, Raipur
Complaint under Section 142 of the Electricity Act. 2003 for violation of regulation mad by the Commission. 19/07/2007
Proceeding
Order Passed on
11/09/2007


104 17/07(M) M/s. R.K.M. Powergen Pvt. Ltd., Chennai
V/s
CSEB, Raipur
Petition for approval of power purchase agreement. 31/07/2007
Proceeding
Order Passed on
10/09/2007


105 18/07(M) Suo Motu CSEB Respondent

U/s. 142 of the Electricity Act. 2003 for non-compliance for directives given regarding sent percent meterization vide order dated 20/04/07 in Suo Motu petition No. 02 of 2005 02/08/2007
Proceeding
Order Passed on
31/01/2008


106 19/07(T) CSEB, Raipur

Tariff Petition for financial year 2007-08 31/07/2007
Proceeding
Order Passed on
22/10/2007


107 20/07(M) Suo Motu CSEB Respondent

Purchase of power in violation of provision of the Electricity Act, Regulations and directives of the Commission 03/08/2007
Proceeding
Order Passed on
16/08/2007


108 21/07(M) CSEB, Raipur

Approval of standard bidding document for long term procurement of thermal power. 08/08/2007
Proceeding
Annexure4
03/10/2007


Annexure3
03/10/2007


Annexure2
03/10/2007


Annexure1
30/11/-0001


Order Passed on
03/10/2007


109 22/07(L) M/s. Jindal Steel & Power Ltd., Raigarh
V/s
CSEB, Raipur
Revival of the transmission licence & certain amendments in the licence. 25/08/2007
Proceeding
Order Passed on
22/05/2008


Order Passed on
27/02/2008


Transmission Licence
09/06/2008


110 23/07(M) Suo Motu CSEB Respondent

Non-compliance of the directives given in tariff order for year 2006-07 proceeding U/s. 142 of the Electricity Act. 13/09/2007
Proceeding
Order Passed on
14/12/2007


111 24/07(M) Abhijeet Infrastructure Ltd., Raipur
V/s
CSEB, Raipur
Petition U/s. 62(3) of the Electricity Act. 2003 for wrong categorization of tariff for temporary connection. 25/09/2007
Proceeding
Order Passed on
17/10/2007


112 25/07(M) Abhijeet Infrastructure Ltd., Raipur
V/s
CSEB, Raipur
Petition U/s. 142 of the Electricity Act. for non-compliance of the order of the Electricity Consumer Grievances Redressal Forum, Raipur 29/09/2007
Proceeding
Order Passed on
28/01/2008


113 26/07(M) CSEB, Raipur

Review petition against order dated 03.10.07 passed in petition No. 21 of 2007(M) 09/10/2007
Proceeding
Order Passed on
30/10/2007


Please see also order in petition No. 09 0f 2008
114 27/07(M) Suo Motu M/s Hira Ferro Alloys Ltd. Urla, Raipur

Action U/s 142 of the Electricity Act 2003 Violation of the Provision of the Electricity Act & CSERC (Licence) Regulation 2004 11/10/2007
Proceeding
Order Passed on
15/02/2008


115 28/07(M) M/s Monnet Ispat & Energy Ltd.Mandir Harsod

Permission to avail Power Supply from the respondent through the 132/11 KV substation of Jindal Power & Steel Ltd. at Dangamkla. 11/10/2007
Proceeding
Order Passed on
30/11/2007


116 29/07(M) M/s. Birmiwal Steels Pvt. Ltd., Raipur
V/s
CSEB, Raipur
Petition U/s. 142 of the Electricity Act 2003 for noncompliance of order of the Electricity Ombudsman. 16/10/2007
Proceeding
Order Passed on
22/12/2007


117 30/07(M) CSEB
V/s
R.K.M. Powergen Pvt. Ltd., Chennai
Approval of Power purchase agreement for a quantum of 450 MW power from 4X350 MW coal based power project. 08/10/2007
Proceeding
Order Passed on
22/12/2007


118 31/07(M) M/s.Arasmeta
V/s
CSEB, Raipur
For grant of open access and renewal of short term open access. 02/11/2007
Proceeding
Order Passed on
20/03/2008


119 32/07(M) M/s.Ultratech Cement Pvt. Ltd
V/s
CSEB, Raipur
Seeking approval of captive status to M/s. Grasim Industries Ltd. 05/11/2007
Proceeding
Order Passed on
21/02/2007


120 33/07(L) M/s. Global Energy Ltd. Mumbai

Grant of intra state trading license 08/11/2007
Proceeding
Licence issued on
25/04/2008


Order Passed on
13/03/2008


121 34/07(M) Suo Motu CSEB....Respondent

Review of order passed in petition no. 37 of 2006(M) on 13.11.07 28/11/2007
Proceeding
Order Passed on
16/01/2008


122 01/08(M) Abhijeet Infrastructure Ltd., Raipur
V/s
CSEB, Raipur
Review petition filed against Tariff Order dated 22/10/2007, passed in P.No. 19 of 2007(T) 01/01/2008
Proceeding
Order Passed on
05/05/2008


123 02/08(M) Chhattisgarh State Electricity Board, Raipur

Review petition filed against Tariff Order dated 22/10/2007, passed in P.No. 19 of 2007(T) 01/01/2008
Proceeding
Order Passed on
04/08/2008


124 03/08(M) M/s Jindal Steel & Power Ltd., Raigarh

Application under section 63 of the Electricity Act, 2003. For approval in request for qualification (RFQ) & request for proposal (RFP) documents along with deviation in the power purchase agreement (PPA). 10/01/2008
Proceeding
Order Passed on
09/07/2008


Order Passed on
21/02/2008


125 04/08(M) M/s. Monnet Ispat & Energy Ltd.
V/s
CSEB, Raipur
Application for review clarification of tariff order dated 22.10.2007 19/02/2008
Proceeding
Order Passed on
07/03/2008


126 05/08(M) M/s. Hira ferro Alloys Ltd.
V/s
CSEB, Raipur
For deciding captive users in respect of captive power plant. 27/02/2008
Proceeding
Order Passed on
27/08/2008


127 06/08(M) Suo Motu CSEB.. Respondent

Start up tariff for captive power plants 07/03/2008
Proceeding
Order Passed on
06/05/2008


128 07/2008(M) Shrishrimal Plantation Ltd.
V/s
CSEB
To review order dated 15/06/2005. 14/05/2008
Proceeding
Order Passed on
28/06/2008


129 08/2008(M) Suo Motu CSEB.. Respondent

No compliance of the order dated 15.01.08 in petition No. 07/05 by CSEB. Under section 142 of the Electricity Act. 26/05/2008
Proceeding
Order Passed on
10/07/2008


130 09/2008 CSEB ... Petitioner

Petition submitted for adoption of tariff for long term procurement of thermal power on international competitive bid basis from Bhaiyathan thermal power plant 15/07/2008
Proceeding
Order Passed on
29/07/2008


Please see also previous order in petition No. 21 & 26 of 2007
131 10/2008(M) Suo Motu M/s.Aryan Coal Benefications P. Ltd.... Respondent

Proceeding under section 142 of the Electricity Act, 2003 11/08/2008
Proceeding
Order Passed on
23/01/2009


132 11/2008(M) M/s. Aryan Coal Benefications P. Ltd.

Permission to supply power to own destination through own dedicated transmission line 14/08/2008
Proceeding
Order Passed on
23/01/2009


133 12/2008(M) Suo Motu CSEB.... Respondent

Under section 142 of the Act for not performing its statutory duties including the provisions specifically made in National Electricity Policy 25/08/2008
Proceeding
Order Passed on
05/03/2009


134 13/2008(M) M/s. RR Energy Pvt. Ltd., Raigarh
V/s
CSEB
Petitioner seeking grant of connectivity temporarily at 33 KV (with provision of open access for sale of power outside the state) instead of 132 KV (as required under clause 4.1.2 of the Chhattisgarh State Electricity Grid Code, 2007 01/08/2008
Proceeding
Dismissed in default
135 14/2008(M) Suo Motu Respondents 1. M/s. Abhijeet Infrastructure Ltd. Raipur 2. M/s. Salasar Steel & Power Ltd., Raigarh

Under section 142 of the Act for violation of section 12 of the Act 28/08/2008
Proceeding
Order Passed on
27/11/2008


136 15/2008(M) Suo Motu Respondents M/s. Salasar Steel & Power Ltd., Raigarh

Under section 142 of the Act for violation of section 12 of the Act 28/08/2008
Proceeding
Order Passed on
27/11/2008


137 16/2008(T) Suo Motu CSEB.... Respondent

Determination & declaration of tariff for solar power generation plants covered under Govt. of India's incentive policy and to promote solar power generation in the State of Chhattisgrah. 09/07/2008
Proceeding
Amended order Passed on
09/07/2010


Order Passed on
08/09/2008


138 17/2008(M) Suo Motu Respondents 1. M/s. Jayaswal Neco Ltd.. Raipur 2. M/s. Ind Synergy Ltd. 3. Crporate Ispat Alloys Ltd.

U/s 142 of the Electricity Act. 16/09/2008
Proceeding
Order Passed on
25/05/2009


139 18/2008(M) Suo Motu CSEB.... Respondent

U/s. 142 of the electricity Act for noncompliance of order of electricity omburdsman 01/10/2008
Proceeding
Order Passed on
21/11/2008


140 19/2008(M) M/s. Jayaswal Neco Industries Ltd., Raipur
V/s
CSEB
Special dispensation for cogeneration plants 14/10/2008
Proceeding
Order Passed on
05/11/2008


141 20/2008(M) CSEB
V/s
M/s. Hira Ferro Alloys Ltd., Raipur
Review of order dated 27.08.08 passed in P.No. 05/2008(M) 04/10/2008
Proceeding
Order Passed on
11/02/2009


142 21/2008(M) M/s. Arasmeta Captive Power Pvt. Ltd., Hyderabad.
V/s
1. CSEB 2. SLDC
Clarification and further directions in relation to order dated 20.03.08, passed in P.No. 31/07(M) 01/01/2008
Proceeding
Order passed on
01/12/2008


143 22/08(M) M/s. Godawari Power & Ispat Ltd.
V/s
CSEB
Petition U/s. 62, 86 of the electricity Act. 2003 in the matter determination of parallel operation charges. 20/10/2008
Proceeding
Order Passed on
06/06/2009


144 23/08(T) M/s. Jindal Steel and Power Ltd., Raigarh

Annual Revenue Requirement for the Distribution business for F.Y. 2008-09 01/01/2008
Proceeding
Order Passed on
05/11/2008


145 24/08(M) M/s.Vandana Vidyut Ltd., Raipur
V/s
CSEB
Change of third party allocation for sale of power 14/11/2008
Proceeding
Rejected at the stage of admission on
03/01/2009


146 25/08(M) Suo Motu M/s.SAIL,Bhilai Respondent

In the matter of non compliance of the provisions of the Electricity Act and the provisions of the Regulations and directions of this Commission by the distribution licensee i.e.BSP, SAIL 03/12/2008
Proceeding
Time give as per filing of tariff application case closed
147 26/08(M) C.G.Steel & Power Ltd., Raipur
V/s
SLDC, Bhilai
Restoration of concurrence for inter state open access to the petitioner 05/12/2008
Proceeding
Withdrawn by the petitioner
148 27/08(M) Suo Motu Respondents 1. CREDA.. Raipur 2. M/s. Raja Ram Maize Product, Rajnandgaon. 3. Agarwal Vidyut Ltd., Raipur 4. Neeraj Power Pvt. Ltd., Raipur. 3. M/s. Hanuman Agro Industri

Non compliance of Commission directives given in the order dtd. 15.01.08 in P.No. 07/2005 under section 142 of the Electricity Act,2003(M) 06/12/2008
Proceeding
Order Passed on
15/05/2009


149 28/08(M) Suo Motu Chief Electrical Inspector of Chhattisgarh Respondent

Non Compliance of the Commission's order in the matter of CPP. 19/12/2008
Proceeding
Order Passed on
19/03/2009


150 29/08(M) BALCO
V/s
CSEB
In the matter of application u/s.86(1)(f) of the Electricity Act,2003 with Regulation 23 & 22 of the CSERC (Conduct of Business) Regulation 04 01/01/2008
Proceeding
Order Passed on
27/06/2009


151 01/09(M) Suo Motu CSPDCL Respondent

U/s 142 of the Electricity Act for Non-compliance of order dated 26-04-2008 of Electricity Consumers Grievances Redressal forum. (M) 14/01/2009
Proceeding
Order Passed on
19/03/2009


152 02/09(M) M/s Arasmeta Captive Power Company Ltd.
V/s
CSPDCL
Reduction in Existing Contract demand up to zero. (M) 20/01/2009
Proceeding
Order Passed on
05/06/2009


153 03/09(OA) M/s Arasmeta Captive Power Company Ltd.
V/s
SLDC and others
Short term Inter State Open Access for sale of power to PTC or any such trader.(OA) 10/02/2009
Proceeding
The petitioner does not want to press the petition. The petition is accordingly dismissed
154 04/09(M) M/s R.R. Eneryg Ltd.
V/s
CSPDCL
Permission for reduction of contract demand. (M) 09/02/2009
Proceeding
Closed on
23/04/2009


155 05/09(M) M/s Monnet Ispat & Energy Ltd.
V/s
CSPDCL
Petition for quash panel UI demand charges. Charged by respondent. (D) 09/02/2009
Proceeding
Order Passed on
24/10/2009


156 06/09(M) M/s Sai Chamicals Pvt. Ltd.
V/s
1. CSPDCL 2. CSPTCL
To allow provisional open access under present connectivity condition and to provide independent connectivity to Bio Mass based power plant. (M) 11/02/2009
Proceeding
Order Passed on
29/06/2009


157 07/09(M) Suo Motu Executive Engineer city Division (East)-I CSPDCL.... Respondent

U/s 142 of the Electricity Act. for Non-Compliance of order dtd. 30.06.08 of Electricty Consumer Grievances Redressal Forum. (M) 18/02/2009
Proceeding
Order Passed on
31/03/2009


158 08/09(M) Suo Motu Executive Engineer (O&M CSPDCL... Respondent

U/s 142 of the Electricity Act. for Non-Compliance of order dtd. 14.11.08 of Electricty Consumer Grievances Redressal Forum.(M) 18/02/2009
Proceeding
Order Passed on
29/05/2009


159 09/2009(T) Suo motu

Discussion paper on "pricing of surplus power from captive generating plants & IPPS for the year 2009-10 for short -term purchase by distribution utility state. 18/02/2009
Proceeding
Order Passed on
18/04/2009


160 10/2009(T) Chhattisgarh State Power Generation Company Ltd. and others

Petition for Aggregate Revenue Requirement for F.Y. 2008-09 and 2009-10 and Tariff Petition for F.Y. 2009-10 filed by Chhattisgarh State Power Generation Company Ltd.. (T) 25/02/2009
Proceeding
Order Passed on
30/05/2009


161 11/2009(T) Chhattisgarh State Power Transmission Company Ltd.

Petition for Aggregate Revenue Requirement for FY 2008-09 & 2009-10 and Tariff Petition for F.Y.2009-10 filed by Chhattisgarh State Power Transmission Company Ltd. (T) 25/02/2009
Proceeding
Order Passed on
30/05/2009


162 12/2009(T) Chhattisgarh State Power Distribution Company Ltd.

Petition for Aggregate Revenue Requirement for FY 2008-09 & 2009-10 and Tariff Petition for F.Y.2009-10 filed by Chhattisgarh State Power Distribution Company Ltd. (T) 25/02/2009
Proceeding
Order Passed on
30/05/2009


163 13/2009(M) M/s Arasmeta Captive Power Company Ltd.
V/s
CSPTCL
Petition for extension of period completing the independent lines and relaxation in provision of applicability Clause of 4.12 Chhattisgarh Electricity Grid Code and Short Term Open Access. (M) 27/02/2009
Proceeding
Order Passed on
18/06/2009


164 14/2009(M) M/s Lahari Power & Steel Lltd.
V/s
Chhattisgarh State Power Distribution Company Ltd. Chhattisgarh State Renewable Energy Development Agency, Raipur
To exit from Power Purchase agreement for Biomass to converted as independent power plant primarily using Biomass/Coal. (M) 11/02/2009
Proceeding
Rejected at the stage of admission on
09/04/2009


165 15/2009 1. CSPGCL 2. CSPDCL 3. CSPTCL

Business plan of CSPGCL, CSPDCL & CSPTCL for control period from FY 2009-10 to FY 2011-12. 03/03/2009
Proceeding
Order Passed on
19/06/2009


166 16/2009(M) M/s. Aryan Coal Benefications Pvt. Ltd.
V/s
CSPDCL
To review order dated 23.01.09 passed in petition No. 10, 11/2008(M) 09/03/2009
Proceeding
Rejected on
25/05/2009


167 17/2009(T) M/s. Jindal Steel and Power Ltd.

Annual Revenue Requirement for the distribution business of the petitioner company for F.Y. 2009-10. 27/02/2009
Proceeding
Order Passed on
27/06/2009


168 18/2009(M) M/s. CSPDCL
V/s
M/s. Jindal Power Ltd.
Approval of draft agreement to be executed between M/s. Jindal Power Ltd. & Chhattisgarh State Power Distribution Co. Ltd. for supply of 150 MW power by Jindal Power Ltd. 26/03/2009
Proceeding
Order Passed on
13/04/2009


169 19/2009(M) M/s. CSPDCL
V/s
M/s. Jindal Power Ltd.
Purchase of power by Chhattisgarh State Power Distribution Co. Ltd. from M/s. Jindal Power Ltd. through 400 KV route for approval of supplementary PPA 01/01/2009
Proceeding
Order Passed on
04/04/2009


170 20/2009(M) M/s. CSPDCL

Petition to review order dated 31.12.2008 passed in P.No. 39/2006 U/R 43(1) of the CSERC (Conduct of Business) Regulations, 2004
26/03/2009
Proceeding
Order Passed on
13/10/2009


171 21/2009(M) Suo Motu 1. CSPDCL.& 20 Others. Respondent

-- 13/04/2009
Proceeding
Order Passed on
05/12/2011


172 22/2009(M) M/s KVK Bio-Energy Pvt.Ltd.
V/s
1. CSPDCL 2. SLDC. Bhilai 3. Chhattisgarh State Renewable Energy Development Agency.
Petition for termination of PPA with the CSEB & grant of interstate short term open access. 09/04/2009
Proceeding
Order Passed on
18/05/2010


173 23/2009(M) Chhattisgarh Biomass Energy Developers Association.
V/s
CSPDCL. Raipur
Application U/s 142 of the Electricity Act 2003. 13/04/2009
Proceeding
Order Passed on
18/06/2009


174 24/2009(M) Suo Motu 1. Chief Engineer (O &M) 2. Chief Engineer (S&P) Respondent

Non Compliance of the provisions of the Electricity Act 2003 & Order of directions of the Commission in respect of cent percent meterization. 15/04/2009
Proceeding
Order Passed on
08/07/2009


175 25/2009(T) Chhattisgarh Biomass Energy Developers Association

Revision & Determination of tariff for the purchase of electricity generated by Biomass power plant in Chhattisgarh by the Distribution Licensees in Chhattisgarh with effect from 01.04.2009 (Financial year 2009-10 & subsequent year. 28/04/2009
Proceeding
Order Passed on
15/04/2010


176 26/2009(OA) M/s. Ind Synergy Ltd.
V/s
CSPTCL
Concurrence for short term open access for inter-state power sale upto 15MVA through existing 33 KV dedicated lines. 13/05/2009
Proceeding
Rejected at the stage of admission on
06/06/2009


177 27/2009(M) Suo-Motu CSPDCL Respondent

Violation of section 43 of the Act and the relevant provisions of supply code 20/05/2009
Proceeding
Order Passed on
25/07/2009


178 28/2009(M) CSPDCL

Pricing of power rquired to be purchased in short term from CPP & IPP for the year 2009-10 25/05/2009
Proceeding
Order Passed on
23/06/2009


179 29/2009(T) BSP, Bhilai

Determination of ARR and tariff for the FY 2009-10 for BSP (T) 27/05/2009
Proceeding
Order Passed on
31/08/2009


180 30/2009(M) BSP, Bhilai

Approval of power supply arrangement and business plan for the Fy 2009-10 BSP. 27/05/2009
Proceeding
Order Passed on
31/08/2009


181 31/2009(OA) M/s Vandana Vidyut Ltd. Raipur
V/s
CSPDCL
Issue of concurrence for short term open access for inter state power sale. 28/05/2009
Proceeding
Order Passed on
25/11/2009


182 32/2009(D) M/s Arasmeta Captive power Comp Ltd.
V/s
CSPDCL
-- 29/05/2009
Proceeding
Order Passed on
13/04/2010


183 33/2009(M) Suo Motu 1. EE, Raigarh 2. AE (DC), Raigarh Respondent

Under section 142(2) Electricity Act, 2003 for violation of the provision of section 43 of the Act of supply code & for non compliance of order of forum. 27/05/2009
Proceeding
Order Passed on
29/06/2009


184 34/2009(M) Suo Motu CSPDCL .... Respondent

Power procurement plan of the CSPDCL for year 2009-10 09/06/2009
Proceeding
Order Passed on
29/06/2009


185 35/2009(M) M/s Ind Synergy Ltd.
V/s
CSPTCL, CSPDCL & State Load Despatch Centre
Issue of concurrence for short term open access for inter state power sale. 09/06/2009
Proceeding
Order Passed on
29/06/2009


186 36/2009(M) Suo Motu State Load Despatch Centre .... Respondent

U/S 142, of the Act, for non-compliance of order of the Commission 25/06/2009
Proceeding
case closed on 20.07.2009 The respondent is directed to be attentive to the orders being issued by the Commission
187 37/2009(M) M/s Jayaswal NECO Industries Ltd. Raipur

To review order dated 25.05.2009 passed in suo-motu petition no. 17/2008(M) 23/06/2009
Proceeding
Order Passed on
05/12/2009


188 38/2009(M) BSP
V/s
CSPDCL
Petition U/S 42 & 64 of the Electricity Act 2003, for granting the categorization of the petitioner as a composite consumer for additional charge (M) 24/06/2009
Proceeding
Order Passed on
30/09/2009


189 39/2009(M) M/s Corporate Ispat Alloys ltd.

Review of order dated 25.05.2009 passed in suo-motu petition No. 17 of 2008 (M) 25/06/2009
Proceeding
Withdrawn by the petitioner
190 40/2009(M) M/s Sharda Energy and Minerals Ltd. & 15 others
V/s
CSPTCL & SLDC
Petition U/s 86(1) (f) of the Electricity Act, 2003 to quash the penal UI charges and for remaining of capping of UI charges on over injection. 27/06/2009
Proceeding
Order Passed on
24/10/2009


191 41/2009(M) M/s. Sarda Energy and Minerals Ltd. Raipur
V/s
CSPDCL
Petition Under Section 86(1)(f) of the Electricity Act, 2003 to issue directives to respondent for correct calculation of Load Factor as provided in PPA 25/06/2009
Proceeding
Order Passed on
21/01/2010


192 42/2009(D) M/s. Bharat Aluminium Company Ltd.
V/s
1. Chhattisgarh State Load Despatch Centre, Bhilai 2 Administration CSEB(Re- organization) through A.C.E. & Nodal Officer STOA 3. CSPTCL 4. CSPDCL
Petition against recovery of penal UI charges and wrongly withheld an amount receivable by the petitioner 28/07/2009
Proceeding
Order Passed on
24/10/2009


193 43/2009(M) Suo Motu

1. M/s. Vandana Vidyut Global Limited., Raipur 2. M/s. Nakoda Ispat Ltd. Raipur 3. M/s. Real Ispat & Power Ltd. Borjhara, Raipur 4. M/s. Singhal Interprieses, Raigarh 5. M/s. G
U/s. 142 of the Electricity Act. 28/07/2009
Proceeding
Order Passed on
12/07/2013


Appeal before Tribunal. Order passed on 23-09-2013 Website link
194 44/2009(M) M/s. Alok Ferro Alloys. Ltd.
V/s
Chhattisgarh State power Distribution Company Limited
Reduction in contract demand up to zero 25/07/2009
Proceeding
Order Passed on
17/12/2009


195 45/2009(M) CSPDCL
V/s
M/s. Arasmeta Captive power Company Pvt. Ltd.
Review petition against order dated 05.06.2009 passed in petition No. 02/2009(M) U/s. 94(1)(f) read with section 43 of CSERC (Conduct of Business) Regulation, 2004 07/08/2009
Proceeding
Rejected at the stage of admission on
07/09/2009


196 46/2009(D) M/s. R.R. Energy Lgtd., Raigarh
V/s
CSPTCL
Refund of 15% supervision charges levied by the respondent. 23/06/2009
Proceeding
Order Passed on
29/10/2009


197 47/2009(D) CSPDCL
V/s
BALCO
Petition filed by CSPDCL to review order dated 27.06.09 passed in petition No. 29/2008 04/09/2009
Proceeding
Order Passed on
28/10/2009


198 48/2009 BALCO
V/s
CSPDCL
Petition U/s. 142 read section 149 of the electricity Act 2003 filed by BALCO 04/09/2009
Proceeding
Order Passed on
28/10/2009


199 49/2009(D) M/s. Lanco Amarkantak Power pvt. Ltd., Korba
V/s
CSPHCL
Petition against supplementary bill with retrospective effect raised by the respondent without any authority 11/09/2009
Proceeding
Order Passed on
30/03/2010


200 50/2009 Suo Motu CSPHCL ... Respondent

U/s. 142 of Electricity Act 2003 16/09/2009
Proceeding
Order Passed on
31/10/2009


201 51/2009(M) Suo Motu The Superintentding Engineer (City), CSPDCL, Raipur .. Respondent

Non-compliance of order of the electricity Consumer Grievances Redressal Forum, Raipur action U/s. 142 of the Electricity Act 2003. 16/09/2009
Proceeding
Order Passed on
14/01/2010


202 52/2009(M) Suo Motu Chief Engineer (O&M) Chief Engineer (S&P) Superintending Engineer (O&M) All above are the responsible officers of CSPDCL

Non-compliance of directive in respect of cent percent meterization. Violation of the Electricity Act 2003, proceeding U/s 142 of electricity Act. 22/10/2009
Proceeding
Order Passed on
22/07/2010


203 53/2009(M) Suo Motu CSPDCL

Non compliance of order dated 05.06.2009 passed in petition 02/2009 13/11/2009
Proceeding
Case is closed on 05.12.2009
204 54/2009(M) CSPDCL
V/s
All the generators and consumers to whom the peak load hours are applicable
Review of order dated 25.05.2009 under Suo Motu petition No. 17/2008(M) 30/10/2009
Proceeding
Order Passed on
26/12/2009


205 55/2009(M) M/s. Gayatri Rice Product
V/s
Chief Engineer and Others
Petition to quash the bills raised under HT agreement for consumption of electricity 30/10/2009
Proceeding
Order Passed on
26/12/2009


206 56/2009(D) M/s. Gopal Sponge and Power (O) Ltd., Raipur
V/s
CSPDCL
Grant of permission for synchronization with 33 KV system of CSPDCL at 220/132/33 KV siltara sub station and sale of surplus power 11/11/2009
Proceeding
Order Passed on
29/05/2010


207 57/2009(M) CSPDCL
V/s
Chhattisgarh Bio-mass Energy Developers association
Review of order dtd 17/09/09 passed in petition no. 25/09 30/11/2009
Proceeding
Order Passed on
24/04/2010


208 58/2009(M) Sou Motu The Executive Engineer (O&M), Division -I Bilaspur

Non-compliance of a order of the electricity consumer givances redressal forum Bilaspur u/s 142 of the Electricity Act 2003. 09/12/2009
Proceeding
Order Passed on
14/01/2010


209 59/2009(M) South East Central Railway
V/s
CSPDCL
Petition against standby feeder maintenance charges levied by the respondent CSPDCL 11/12/2009
Proceeding
Order Passed on
28/01/2010


210 60/2009(M) South East Central Railway
V/s
CSPDCL
Petition for adoption of simultaneous maximum demand for billing of demand 11/12/2009
Proceeding
Order Passed on
11/03/2010


211 61/2009(M) M/s Jayaswal NECO Industries Ltd.
V/s
CSPTCL
Request for relaxation of time limit upto 31.12.2011 to avail the independent connectivity according to the provision of the CG State Electricity Grid Code 2007 04/12/2009
Proceeding
Order Passed on
14/03/2013


212 01/2010(M) CSPTCL
V/s
M/s R.R. Energy Ltd.
Petition for review of order dated 29/10/2009 passed in petition No. 46 of 2009 (M) 08/01/2010
Proceeding
Order Passed on
10/03/2010


213 02/2010(M) M/s Ambuja Cement Limited Bhatapara
V/s
CSPDCL CSPTCL
Connection of 7MVA load on 132 KV Tapped from the Bhatapara Balodabazar feeder. 12/01/2010
Proceeding
Order Passed on
31/12/2010


214 03/2010(M) Suo Motu MD CSPGCL MD CSPTCL MD CSPDCL

U/s 142 for violation of directives given in tariff order. 12/01/2010
Proceeding
Closed
215 04/2010(M) BALCO
V/s
CSPDCL
Application u/s 86(1)(b) of the electricity Act 2003 for approval of purchase & procurement of power by distribution licensee. 25/01/2010
Proceeding
Order Passed on
22/06/2010


216 05/2010(M) Suo Motu CSPDCL

Short term Power purchase for the year 2010-11 23/02/2010
Proceeding
Order Passed on
30/04/2010


217 06/2010(D) M/s Monnet Ispat & Energy Ltd.
V/s
CSPTCL
U/s 86(1)(f) with S. 39 of the Electricity Act 2003 Challanging demand of Rs. 52,98,576/- made by the respondent. 10/03/2010
Proceeding
Order Passed on
02/12/2010


218 07/2010(M) Chhattisgarh State Power Transmission Company Ltd.
V/s
Business Plan for 3 year MYT Control Period from FY 2010-11 to 2012-13 10/03/2010
Proceeding
Order Passed on
01/06/2010


219 08/2010(M) Chhattisgarh State Power Generation Co. Ltd., Raipur

Business Plan 10/03/2010
Proceeding
Order Passed on
01/06/2010


220 09/2010(M) Shri G.D.Tapdeiya Director -M/s Tapdeiya Engineering & Traders Pvt. Ltd. Industries State Raipur (C.G.)
V/s
Through 1. CE (Raipur Region) CSPDCL 2. CE (Vigilance) CSPDCL 3. SE (O&M) CSPDCL 4. Senior A/c Officer, CSPDCL
Change in tariff category without pre-intimation 08/02/2010
Proceeding
Order Passed on
18/05/2010


221 10/2010(M) Shri Mahender Mukim Patner - M/s M.M.Industries
V/s
Through 1. CE (Raipur Region) CSPDCL 2. CE (Vigilance) CSPDCL 3. SE (O&M) CSPDCL 4. Senior A/c Officer, CSPDCL
petition against Change in tariff category from H-1 to H-3 11/03/2010
Proceeding
Order Passed on
15/07/2010


222 11/2010(D) M/s Godawari Power & Ispat Ltd.
V/s
CSPDCL
Petition U/s 86(1)(f) of the electricity act 2003 to issue direction for entering into PPA for surplus power during peak hours. 26/03/2010
Proceeding
Order Passed on
21/10/2010


223 12/2010(M) 1. M/s Hira Ferro Alloys Ltd. (Power Division) 2.M/s Hira Power & Steel Ltd. (Unit-II) 3. Alok Ferro Alloys Ltd. (Power Division)
V/s
1. CSPTCL 2. Executive Engineer (Sub Station division)
Demand of maintenance charge raised by Respondent - CSPTCL 26/03/2010
Proceeding
Order Passed on
02/12/2010


224 13/2010(M) M/s Sarda Energy & Minerals Ltd.
V/s
CSPDCL
Change in category of tariff of in-take-well water pump house of petitioner company. 03/04/2010
Proceeding
Order Passed on
09/08/2010


225 14/2010(M) Suo Motu

Superintending Engineer (Raipur Circle) & others
Non compliance of order electricity consumer grievances redressal forum of Raipur. Violation of regulation made by the Commission, Petition U/s. 142 of the Electricity Act 2003 03/04/2010
Proceeding
Closed
226 15/2010(M) CSPDCL
V/s
NTPC
Petition for approval of power purchase agreement for a quantum of 175 MW power from 1x500 MW load based power project of M/s NTPC Korba stage-III 06/04/2010
Proceeding
Order Passed on
03/11/2012


227 16/2010(M) CSPDCL
V/s
NTPC
Petition for approval of power purchase agreement for a quantum of 50 MW power from 2x250 MW load based power project of M/s NTPC Bhilai 06/04/2010
Proceeding
Order Passed on
15/04/2013


228 17/2010(M) CSPDCL

Petition for approval of one time settlement scheme for outstanding dues against low tension consumer of Petitioner company U/s 62(5) of the Electricity Act 2003. 07/04/2010
Proceeding
Order Passed on
07/09/2010


229 18/2010(M) CSPDCL

Business plan of Chhattisgarh State Power Distribution Co. Ltd. for 3 years MYT control period from 2010-11 to 2012-13. 12/04/2010
Proceeding
Order Passed on
01/06/2010


230 19/2010(M) Shri B.S.Sial
V/s
Chief Engineer, SLDC, Khedamara, Bhilai CSPTCL
Petition under section 142 of the Electricity Act 2003 for violation of provisions of section 86(e) of the Act & the Commission's regulation made there under. 16/04/2010
Proceeding
Order Passed on
05/10/2010


231 20/2010(M) M/s. Sarda Energy & Minerals Ltd.
V/s
CSPDCL
Categorization of tariff for iron or pelletisation plant from EHV-4 (other EHV Consumer) to EHV-3 steel industries. 04/05/2010
Proceeding
Order Passed on
10/08/2010


232 21/2010(D) India Bulls
V/s
CSPHCL
Petition U/s. 86(1)(b) & 86(1)(f) of the electricity Act. 2003 for resolution of dispute. 01/06/2010
Proceeding
Order Passed on
31/12/2011


233 22/2010(M) JSPL, Raigarh

Petition for approval of power procurement plan and power purchase rate for the distribution business for F.Y. 2010-11 01/06/2010
Proceeding
Order Passed on
27/10/2010


234 23/2010(D) CSPDCL
V/s
M/s. Arasmeta Captive Power Co. Pvt. Ltd.
To review order dated 13.04.2010 in petition No. 32 of 2009(D) 03/06/2010
Proceeding
Order Passed on
03/08/2010


235 24/2010(M) M/s. South Asian Agro Industries Ltd.
V/s
CSPDCL
Petition against wrong calculation of line loss. 08/06/2010
Proceeding
Order Passed on
27/08/2010


236 25/2010(M) Indo Lahari Bio Power ltd.
V/s
S.E. (O&M)
Petition U/s. 1 & 2 of the Electricity Act. 2003 for non compliance electricity consumer grievances redressal forums order. 15/06/2010
Proceeding
Order Passed on
03/11/2010


237 26/2010(M) Chhattisgarh Biomass Energy Developers Association.
V/s
CSPDCL
Petition for seeking direction to CSPDCL to make payment of arrears & interest there upon under section 1 & 2 of the electricity Act. 2003 15/06/2010
Proceeding
Order Passed on
07/08/2010


238 27/2010(D) M/s. Indo sponge Power & steel Ltd.
V/s
CSPDCL
Petition U/s. 86(1)(e) & 86(1)(f) of the Electricity Act. 2003. 06/07/2010
Proceeding
Order Passed on
05/10/2010


239 28/2010(M) Shri Ramesh Agrawal
V/s
Jindal Steel & Power Ltd.
Petition u/s. 142 of the Electricity Act 2003 08/07/2010
Proceeding
Dismissed
240 29/2010(M) Indo Lahari Bio Power ltd.
V/s
S.E. (O&M)
Petition U/s. 142 of the Electricity act. 2003 for non compliance of order of the Electricity consumer Grievances Redressal Forum, Raipur. 16/07/2010
Proceeding
Order Passed on
04/11/2010


241 30/2010(M) Suo Motu CSPDCL SLDC Arasmeta Captive Power lafarge Cement ....Respondent

Finalization of energy accounting modality in the matter of energy injected by M/s Arasmeta Captive Power Co. Pvt. (M) 16/07/2010
Proceeding
Order Passed on
30/12/2010


242 31/2010/(M) R.R Energy Ltd.
V/s
Chhattisgarh State power Transmission com. Ltd.
Petition U/s 142 of the Electricity Act 2003 for non Compliance of the order dated 29/10/09 of the Commission. (M) 27/07/2010
Proceeding
Closed
243 32/2010/(D) M/s Isa power (P) Ltd.
V/s
M.D CSPDCL & others.
petition u/s 142 of the Electricity 2003 & Section 44 of CSERC conduct of Business 2009 against Violation of Rules & Regulation by the respondent. (D) 04/08/2010
Proceeding
Order Passed on
03/12/2010


244 33/2010(M) M/s Moser Baer Energy & Research Ltd.
V/s
Chhattisgarh State Power Distribution Com. Ltd.
Petition U/s 86 of the Electricity Act. 2003 for Determination &Declaration of tariff for Power Procurement by the Distribution licensee in state of Chhattisgarh from our proposed 100 MW Grid interactive Solar photovoltaic power project in Chhattisgarh. 16/08/2010
Proceeding
Order Passed on
26/11/2010


245 34/2010(M) Chhattisgarh State Power Distribution Com.Ltd.
V/s
Electricity Consumers Grievances Redressal Forum Bilaspur
Deliberate Violation of Commissions Supply Code Regulation by Electricity Consumers Grievances Redressal Forum Bilaspur request to undertake proceeding under Section 142 of the electricity Act 2003. (M) 17/08/2010
Proceeding
Order Passed on
29/10/2010


246 35/2010(M) M/s jay Ambey Floor Mill
V/s
Chief Engineer & others
petition U/s 142 of the Electricity Act 2003 for non Compliance of order dated 14.09.09 of the Electricity Consumer redressal forum Bilaspur. 06/09/2010
Proceeding
Order Passed on
09/11/2010


247 36/2010/(M) Shri Vishal Gupta
V/s
SE(Ctiy Circle Raipur) & others
- 20/09/2010
Proceeding
Closed
248 37/2010(M) M/s Nutan Isptat and Power (P) Ltd
V/s
SE (O&M) Circle CSPDCL
petition U/s 142 of the Electricity Act 2003 for non-Compliance of order of the Electricity Consumer Grievances Redreassal Forum Raipur 20/09/2010
Proceeding
Order Passed on
09/11/2010


249 38/2010(D) M/s Hira Power & Steel Ltd.
V/s
CSPTCL & others
Petition against demand of Rs.52,98,076/- against maintenance charges raised by the respondent No.2 (D) 21/09/2010
Proceeding
Order Passed on
02/12/2010


250 39/2010(D) M/s Alok Ferro Alloys Ltd.
V/s
CSPTCL & anothers
Petition against demand of Rs.52,98,076/- against maintenance charges raised by the respondent No.2 (D) 21/09/2010
Proceeding
Order Passed on
02/12/2010


251 40/2010(D) Chief Engineer (Raipur Region) CSPDCL
V/s
G.D. Tapadiya
- 23/09/2010
Proceeding
Order Passed on
09/11/2010


252 41/2010(M) M/s IVRCL Infrastructure & Project Ltd. Bilaspur
V/s
Chief Engineer CSPDCL, Bilaspur & Others
Petition U/s 142 of the Electricity Act 2003 for non-compliance of order dated 11.05.2009 of the Electricity Consumer Redressal Forum, Bilaspur in petition no. 58/2009(M) 20/10/2010
Proceeding
Dismissed
253 42/2010(M) Shri Ankit Agrawal
V/s
Chief Engineer, CPDCL, Bilaspur & Others.
Complaint U/s 142 of the Electricity Act 2003 in respect of rules & regulations framed by the Commission. 22/10/2010
Proceeding
Closed
254 43/2010(M) SLDC
V/s
Jindal Electricity Generation Pvt Ltd.
Petition U/s 33(3) & (4) of the Electricity Act 2003. (M) 25/10/2010
Proceeding
Order Passed on
28/06/2010


255 44/2010(T) Jindal Power Ltd.
V/s
Jindal Steel & Power Ltd.
Petition for Provisional tariff for the ongoing small hydro project 3x2 MW filed by Jindal Power Ltd. (T) 29/10/2010
Proceeding
Order Passed on
26/11/2010


256 45/2010(D) Bharat Aluminum Company Ltd.
V/s
1.Chhattisgarh State Power Distribution Co.Ltd. 2. State Load Despatch Centre
Petition against instruction issued by the respondent to limit power scheduling by the petitioner up to 170 MW. (D) 02/11/2010
Proceeding
Order Passed on
31/05/2011


257 46/2010(D) Lahari Power Steel Ltd.Champa
V/s
Chhattisgarh State Power Distribution Co.Ltd. Through 1. M.D 2. S.E (O&M)
Petition against levy of RKVAH Charges from the petitioner a biomass based generator. (D)s 02/11/2010
Proceeding
Order Passed on
04/05/2011


258 47/2010(M) Shrimati Kusum Bai Deshlahara & another
V/s
CSPDCL & others
Petition U/s 128 & or read with section 142 of the Electricity Act 2003. 24/11/2010
Proceeding
Order Passed on
29/06/2011


259 48/2010(M) M/s. Sarda Energy & Minerals Pvt. Ltd.
V/s
CSPDCL
Petition U/s. 142 of the Electricity Act 2003 against misinterpretation of effective Electricity Supply Code Section 4.21 by the respondent to serve the electricity connection 01/12/2010
Proceeding
Order Passed on
04/05/2011


260 49/2010(T) Chhattisgarh State Power Transmission Co. Ltd.
V/s
Petition for approval of ARR for 3 year MYT Control period from FY 2010-11 to 2012-13 & tariff petition for FY 2010-11 by CSPTCL 07/12/2010
Proceeding
Order Passed on
31/03/2011


261 50/2010(M) Chhattisgarh State Power Distribution Co. Ltd.
V/s
A scheme for settlement of dues against small farms of the state having LT agriculture pumps connections upto 5 HP or less contracted lad 14/12/2010
Proceeding
Order Passed on
04/05/2011


262 51/2010(T) Chhattisgarh State Power Distribution Com Ltd.
V/s
Petition for approval of ARR for 3 Year MYT Control period from FY 2010-11 to 2012-13 & tariff petition for FY 2010-11 by CSPDCL 16/12/2010
Proceeding
Order Passed on
31/03/2011


263 52/2010(M) Savitri Power Project Pvt. Ltd.
V/s
CSPDCL
Determination of tariff for sale of power to be generated by 1.2 MW minihydel project 21/12/2010
Proceeding
Order Passed on
13/07/2011


264 53/2010(T) Chhattisgarh State Power Generation Co.Ltd.
V/s
Petition for approval of ARR for 3 year MYT control period from FY 2010-11 to 2012-13 &tariff petition for FY 2010-11 to 2012-13 by CSPGCL 23/12/2010
Proceeding
Order Passed on
31/03/2011


265 54/2010(T) Bhilai Steel Plant (SAIL-BSP)

Petition for review of ARR for FY 2009-10 & approval of MYT Control Period from FY 2010-11 to 2012-13 & tariff proposal for FY 2011-2012 by SAIL-BSP 24/12/2010
Proceeding
Order Passed on
21/07/2011


266 55/2010(D) Monnet Ispat & Energy Ltd.
V/s
CSPDCL
Petition under Section 56(1)(h) &(f) of the Electricity Act 2003 29/12/2010
Proceeding
Order Passed on
31/05/2011


267 56/2010(M) Arasmeta Captive Power Co. Ltd.
V/s
CSPDCL
Petition U/s. 142 of the Electricity Act 2003 for non-compliance of order dated 13.04.2010 in petition No. 32 of 2009(D) 16/12/2010
Proceeding
Closed
268 01/2011(M) Shri K.C. Sundarani, M/s. Banti Traders
V/s
SE (O&M) Circle & others
Petition U/s. 142 of the Electricity Act 2003 in respect of rules & regulations framed by the Commission 04/01/2011
Proceeding
Dismissed
269 02/2011(M) M/s. Aratmal Parwiling Mill
V/s
SE (O&M) Circle
Petition U/s. 142 of the Electricity Act 2003 in respect of rules & regulation framed by the Commission (M) 04/01/2011
Proceeding
Dismissed
270 03/2011(M) Shri K.C. Sundarani
V/s
SE (O&M) Circle & others
Petition U/s. 142 of the Electricity Act 2003 in respect of rules & regulation framed by the Commission (M) 04/01/2011
Proceeding
Dismissed
271 04/2011(M) M/s. Ashish Sundarani
V/s
SE (O&M) Circle & others
Petition U/s. 142 of the Electricity Act 2003 in respect of rules & regulation framed by the Commission (M) 04/01/2011
Proceeding
Dismissed
272 05/2011 M/s. Bhilai Steel Plant. (SAIL-BSP)

Business plan for 3 years MYT control period from FY 2010-11 to FY 2012-13 05/01/2011
Proceeding
Order Passed on
21/07/2011


273 06/2011(T) Jindal Steel & Power Ltd. (Distribution)

ARR for distribution business of Jindal Steel & Power Ltd. for year 2010-11 14/01/2011
Proceeding
Corrige- ndum
10/02/2012


Order Passed on
08/02/2012


Appeal before Tribunal. Order passed on 07-03-2014 Website link
274 07/2011(T) Jindal Steel & Power Ltd. (Transmission)

Petition for approval of ARR for Jindal Steel & Power Ltd. transmission business for FY 07-08, FY 08-09 FY 09-10 & FY 10-11 17/01/2011
Proceeding
Order Passed on
30/12/2011


275 08/2011(M) Aditya Cement
V/s
CSPDCL
Petition for correct interpretation of provisions of the Chhattisgarh State Electricity Supply Code, 2005 U/R 12.13 of the Supply Code & Consequential relief. 19/01/2011
Proceeding
Order Passed on
08/11/2011


Appeal before Tribunal. Order passed on 31-08-2012 Website link
276 09/2011(T) State Load Despatch Centre

Petition for approval of ARR for 3 years MYT control period from FY 2010-11 to FY 2012-13 and tariff petition for FY 2010-11 by Chhattisgarh State Load Despatch Centre 21/01/2011
Proceeding
Order Passed on
31/03/2011


277 10/2011(M) G.R. Sponge & Power Ltd., Raipur

For providing status of captive power producer and permission of transport of energy to captive power user through dedicated transmission line 27/01/2011
Proceeding
Order Passed on
10/05/2011


278 11/2011(M) Steel Authority of India Ltd. Bhilai Steel Plant, Bhilai

Approval of miscellaneous charges for BSP tounship 02/02/2011
Proceeding
Order Passed on
21/07/2011


279 12/2011(M) Shravan Kumar Pandey
V/s
1. CSPDCL 2. The E.E. city west, Raipur 3. The S.E. city west, Raipur
Petition U/R 44 of the CSERC (Conduct of Business) Regulations, 2009 02/02/2011
Proceeding
Order Passed on
15/11/2011


280 13/2011(M) Godawari Power & Ispat Ltd.
V/s
1. Shri S.K. Shukla, Director (CREDA) 2. C.E. (L.D.) SLDC
Petition to direct state agency to accredited petitioner's bio mass based power project under the renewable energy certificate framework & for approving methodology for measurement of generation from such project by State Load Despatch Centre for consideration for the issuance of RECs. 05/02/2011
Proceeding
Order Passed on
01/06/2011


281 14/2011(M) Suo Motu

M/s. Sai Chemicals Pvt. Ltd. CREDA CSPDCL.. Respondent
Action against the biomass based power plants who could not maintain fuel mix ratio as permitted by MNRE during the financial year of 2009-10 10/02/2011
Proceeding
Closed
282 15/2011(M) Shri Bajrang Power & Ispat Ltd.
V/s
CREDA & others
Petition for authorization of certification agency & certification of metering point & metering arrangement of the power generation from RE power generator in view of guidelines & regulation of CSERC for claiming REC 15/02/2011
Proceeding
Order Passed on
10/05/2011


283 16/2011(M) 1. CE (Raipur Region) 2. Chief Vigilance Officer 3. S.E. (O&M) Circle 4. Senior Account Officer
V/s
V/s. Mahendra Mukim MM Industries
Petition to review order dated 15.07.2010 in P.No. 10 of 2010(M) 21/02/2011
Proceeding
Order Passed on
08/08/2011


284 17/2011(D) CSPTCL
V/s
M/s. Lanco Power Ltd.
Petition U/s. 86(1) (f) of the Electricity Act, 2003 for supply of power under the power purchase agreement 01/03/2011
Proceeding
Order Passed on
17/01/2012


285 18/2011(M) Monnet Ispat & Energy Pvt. Ltd.
V/s
Chhattisgarh State Power Trading Co. Ltd.
Petition U/s. 86(1)(c) & 30 of the Electricity Act 2003 read with regulation 44 of the CSERC (Conduct of Business) Regulation, 2009 01/03/2011
Proceeding
Order Passed on
01/07/2011


286 19/2011(M) Suo Motu CSPDCL... Respondent

Excessive complaints on improper wrong meter reading resulting in correct billing & hardship to consumers Suo Motu action 28/03/2011
Proceeding
Order Passed on
20/11/2013


287 20/2011(D) M/s. Hira Ferro Alloys Ltd.
V/s
CSPDCL
Petition u/s. 86(1)(f) & Sec. 142 of the Electricity Act 2003 against the supplementary bill dated 11.11.2010 issues by the respondent in violation of the Commission order. 30/03/2011
Proceeding
Order Passed on
01/07/2011


288 21/2011(M) CSPTCL
V/s
1. M/s. Monnet Ispat & Energy Ltd. 2. M/s. Hira Ferro Alloys, Raipur 3. M/s. Hira Power & Steel Ltd., Raipur 4. M/s. Alok Ferro Alloys Urla, Raipur
Petition to review order dated 02.12.2010 of the Commission passed in petition No. 6, 12, 38 & 39 of 2010 07/04/2011
Proceeding
Order Passed on
30/06/2011


289 22/2011(T) CBEDA & others
V/s
CSPDCL
Revision and determination of tariff for the purchase of electricity by the distribution licensee generated by Biomass based power plant in the State for FY 2010-11 and subsequent years. 01/01/2011
Proceeding
Order Passed on
28/12/2011


290 23/2011(M) Suo Motu

CSPDCL - Respondent
Short term power purchase for the year 2011-12 28/04/2011
Proceeding
Order Passed on
15/07/2011


291 24/2011(M) CSPDCL

Approval of scheme for recovery of outstanding dues from the public utilities excluding surcharges thereon 02/05/2011
Proceeding
Order Passed on
05/11/2011


292 25/2011(D) Hira Energy Ltd.

CSPDCL
Petition for dispute resolution in respect under section 86 (1),(f),(i) of the Electricity Act 2003. 02/05/2011
Proceeding
withdrawal
293 26/2011(M) Jindal Steel & Power Ltd.

Petition for approval for JSPL to carryout tariff based competitive bidding process under case 1 arrangement for procurement of power on long-term basis & approval of the bedding documents, along with deviations from the standard bidding documents, for tariff based competitive bidding process. 23/05/2011
Proceeding
Order Passed on
01/01/2013


Order Passed on
31/12/2011


294 27/2011(D) M/s Singhal Enterprises
V/s
CSP Trading Comp. Ltd.
Petition under section 86 (1) (f) of the Electricity Act 2003 for quashing the demand not dated 23.04.2011 issued by the respondent. 27/05/2011
Proceeding
Order Passed on
14/12/2011


295 28/2011(D) Jayaswal Neco Industries
V/s
CSP Trading Comp. Ltd.
Petition under section 86 (1) (f) of the Electricity Act 2003 for quashing the demand not dated 23.04.2011 issued by the respondent. 27/05/2011
Proceeding
Order Passed on
14/12/2011


296 29/2011(D) M/s Salasar Steel & Power Ltd.
V/s
CSP Trading Comp. Ltd.
Petition under section 86 (1) (f) of the Electricity Act 2003 for quashing the demand not dated 23.04.2011 issued by the respondent. 27/05/2011
Proceeding
Order Passed on
14/12/2011


297 30/2011(M) CE. (LD) State Load despatch Centre

Removal of difficulties in ref with Regulation 13 of chhattisgarh state Electricity Regulatory Commission (Renewable purchase obligation & REC framework implementation Regulation: for levy of fee for processing of applications for issuance of REC by SLDC. 28/05/2011
Proceeding
Order Passed on
26/06/2012


298 31/2011(D) M/s G.R Sponge & P.L.
V/s
CSP Trading Comp. Ltd.
Petition against recovery of Rs. 57,89096/- due to non consideration of transmission loss. 31/05/2011
Proceeding
Order Passed on
14/12/2011


299 32/2011 Suo Motu 1. M/s ACB India Ltd. 2. M/s Bajrang Power & Ispat Ltd. 3.M/s Gopal Sponge & Power (P) Ltd. 4. M/s Mahendra Sponge Powertech P. Ltd. 5. M/s Monnet Ispat & Energy Ltd. 6. M/

- 10/06/2011
Proceeding
Order Passed on
19/06/2013


300 33/2011(D) M/s Urla Industries Accociation
V/s
MD, CSPDCL & others
Calculation/ determination of demand charges for the purpose or variation in billing (reading) cycle. 23/06/2011
Proceeding
Order Passed on
30/11/2012


301 34/2011(M) M/s BSP (SAIL)
V/s
CSPDCL & Others
RKVAH charges levying by CSPDCL by miss representing the order dt. 06.02.2006 of the Commission in petition 17 of 2005(M) 30/06/2011
Proceeding
Order Passed on
31/12/2011


302 35/2011(M) M/s. Godawari Power & Ispat
V/s
CREDA, SLDC
Review petition under clause (f) of sub section (1) of section 94 of the Electricity Act, 2003 & clause 23(2) & (3) of CSERC (Conduct of Business) Regulation, 2009 on 2nd June 2011 in petition No. 13 of 2011(M) 05/07/2011
Proceeding
Order Passed on
09/12/2011


303 36/2011(M) CSPTCL

Approval of additional work to be carriedout during FY 2011-13 in addition to the works of business plan approval for the FY 2010-13 14/07/2011
Proceeding
Order Passed on
28/03/2012


304 37/2011(D) M/s. Alok Ferro Alloys Ltd.
V/s
CSPDCL
Petition U/s 86(1)(f) of the Electricity Act 2003 for refund of the fixed/ minimum charges for connectivity on 132 KV along with interest for the period of June, 09 to Dec. 2009 recovered excessively by the respondent. 14/07/2011
Proceeding
Order Passed on
31/12/2011


305 38/2011(M) CE (Raipur Region) CSPDCL
V/s
M/s. Sarala Energy & Mineral Pct. Ltd.
Review of order dt. 05.05.2011 in petition No. 48 of 2010(M) 27/07/2011
Proceeding
Order Passed on
25/11/2011


306 39/2011(D) M/s API Ispat & Powertech (P) Ltd.
V/s
DSPDCL
Petition U/s 86(1)(f) of the Electricity Act 2003 against the supplementary bill dt 13.07.2011 for billing of cross subsidy surcharge for FY 2009-10. 28/07/2011
Proceeding
Final Order Passed on
20/08/2015


Revised Order Passed on
21/01/2015


Order Passed on
15/12/2011


307 40/2011(M) CSPDCL

Voluntary disclosure scheme of tempered meters by the concerned domestic consumer. 30/07/2011
Proceeding
Order Passed on
05/11/2011


308 41/2011(D) M/s Godawari Power & Ispat Ltd.
V/s
CSPDCL
Petition U/s 86(1)(k) of the Electricity Act 2033 & Rule 3 of the Electricity Rules, 2005 read with Regulation 44 of the CSERC (Conduct of Business) Regulation, 2009 in the matter of cross subsidy surcharge. 05/08/2011
Proceeding
Order Passed on
12/12/2011


Appeal before Tribunal. Order passed on 18-02-2013 Website link
309 42/2011(D) M/s. Vandana Global Ltd.
V/s
CSPDCL
Petition U/s. 86(1)(f) of the Electricity Act, 2003 in the matter of cross subsidy surcharge. 05/08/2011
Proceeding
Revised Order Passed on
21/01/2015


Order Passed on
15/12/2011


310 43/2011(D) M/s. SKS Ispat & Power Limited
V/s
CSPDCL
Petition U/s 86(1)(f) of the Electricity Act, 2003 in the matter of cross subsidy surcharge. 08/08/2011
Proceeding
Order Passed on
29/12/2011


Order Passed on
29/12/2011


Order Passed on
29/12/2011


311 44/2011(D) M/s. Monnet Ispat & Energy Ltd.
V/s
CSPTCL
Petition U/s. 86(1)(e), (f) of the Electricity Act. 2003 in respect of dispute on account of payment of hire charge of equipment. 10/08/2011
Proceeding
Order Passed on
18/03/2013


312 45/2011(M) M/s. Chhattisgarh Investment Ltd.
V/s
CSPDCL
Petition u/s 3.5 of the Chhattisgarh State Electricity Grid Code, 2007 to remove difficulties have arisen. 18/08/2011
Proceeding
Dismissed
313 46/2011(M) M/s Sarda Energy & Minerals Ltd.
V/s
CSPDCL
Petition U/s 142 of the Electricity Act 2003 against non compliance of the Commission order dated 04.05.2011 in petition No. 48 of 2010(M) 27/08/2011
Proceeding
Order Passed on
02/12/2011


314 47/2011(M) M/s Urla Industries Association
V/s
CSPDCL
Petition U/s 94(1)(f) of the Electricity Act 2003 read with regulation 44 of the CSERC (Conduct of Business) Regulation 2009. (M) 16/09/2011
Proceeding
Order Passed on
03/10/2012


315 48/2011(M) M/s L.G. Rice Mill
V/s
SE (O&M)Circle, Raigarh
Petition U/s 142 of the Electricity Act 2003 for Non-Compliance of the Electricity Consumer Grievances Redressal forums order Bilaspur (M) 16/09/2011
Proceeding
withdrawal
316 49/2011(M) Balco
V/s
1. CSPTCL 2. SLDC
Petition for direction of implementation of regulation 42 of the CSERC (Connectivity & Intra-State Open Access) Regulations 2011. (M) 20/09/2011
Proceeding
Order Passed on
26/06/2012


Appeal before Tribunal. Order passed on 13-11-2013 Website link
317 50/2011(M) CSPDCL
V/s
CSPTCL
Petition with request for amendment in Chhattisgarh State Electricity Regulation Commission (Terms & Conditions of determination of Tariff according to Multi Year Tariff Principles) Regulation, 2010 as per provisions U/s 70 & 71 of the Same Regulation. (M) 24/09/2011
Proceeding
Order Passed on
31/12/2011


318 51/2011(M) Suo Motu 1. CSPDCL 2. CSPTCL

Clarification regarding applicability of short term open access for the use of State Transmission network for shot term power purchase. 23/09/2011
Proceeding
Order Passed on
12/12/2012


319 52/2011(M) Shri Vishal Gupta
V/s
SE (Rapur Circle) & others
Petition U/s 142 of the Electricity Act 2003, against non-compliance of the Commissions order. 18/10/2011
Proceeding
Order Passed on
08/06/2012


320 53/2011(M) M/s. Jagdamba Structures (India) Pvt. Ltd.
V/s
CE (Raigarh Area) & others
Petition U/s. 142 of the Electricity Act, 2003 for non-compliance of order of the Electricity Grievances Redressal Forum, Bilaspur 18/10/2011
Proceeding
Order Passed on
21/06/2012


321 54/2011(M) R.R. Energy Ltd. & ohters
V/s
CSPTCL
Petition for review of intrastate transmission charges for short term open access customers determine in tariff order dated 31.03.2011 & other associate matters. 20/10/2011
Proceeding
Order Passed on
06/08/2012


322 55/2011(D) Bharat Aluminium Co. Ltd.
V/s
CSPDCL
Arbitrary rejection of annual overhauling and force majeure claim raised by the petitioner. 24/10/2011
Proceeding
Order Passed on
30/11/2012


323 56/2011(D) Bharat Aluminium Co. Ltd.
V/s
CSPTCL CSPDCL
Unilateral adjustment of Rs. 60322303/- 24/10/2011
Proceeding
Order Passed on
14/12/2011


324 57/2011(T) M/s. Shalivahana Green Energy Ltd.
V/s
CSPDCL
Fixation of provisional tariff for the petitioner mini hydro electric project. 25/10/2011
Proceeding
Order Passed on
05/01/2013


325 58/2011(M) Chhattisgarh Mini Steel Plant Association
V/s
CSPDCL
Petition under regulation 44 of the CSERC (Conduct of Business) Regulation, 2009. 26/11/2011
Proceeding
Order Passed on
22/06/2012


326 59/2011(M) CSPDCL

Petition to prescribe modalities of UI billing for the intra state generation connected directly to the State Grid & supplying power in the inter-state region under open access. 28/11/2011
Proceeding
Order Passed on
27/06/2012


327 60/2011(M) Bhilai Steel Plant (SAIL)
V/s
CSPDCL & NSPCL
Excess claim of parallel operation charges being made by CSPDCL from NSPCL by misinterpretation of the Commission's order dated 13.1.2009 in petition No. 20/2009(M) 08/12/2011
Proceeding
Order Passed on
16/10/2012


328 61/2011(T) CSPDCL

Provisional true up for FY 2010&11 revised projection for ARR for petition for FY 2011-12 & 12-13 & teriff petition for FY 2012-13 filed by CSPDCL 23/12/2011
Proceeding
Order Passed on
28/04/2012


Appeal before Tribunal. Order passed on 18-12-2013 Website link
329 62/2011(M) M/s. Bajrang Power & Ispat Ltd.
V/s
CRED & two others
Petition for approval of methodology for determination of net electricity generation based on steam produced by biomass fired AFBC boiler out of total power generation on steam proportion basis for claiming REC. 26/12/2011
Proceeding
Order Passed on
21/03/2012


330 63/2011(M) Shri M.S. Prasad
V/s
SE, CSPDCL Raipur(Circle)
Petition U/s 142 of the Electricity Act 2003 in respect of violation of rules & regulation framed by the Commission. 29/12/2011
Proceeding
Order Passed on
26/05/2012


331 01/2012(M) CSPGCL (Business Plan)

Petition for approval of capital O&M, Civil & R&M Schemes. (M) 05/01/2012
Proceeding
Order Passed on
31/03/2012


332 02/2012(M) CSPDCL
V/s
Sarda Energy & Minerals Ltd
Review petition against order dtd 02/12/11 passed in petition No. 46/11(M) M/s Sarda Energy & Minerals Ltd. V/s CSPDCL (M) 03/01/2012
Proceeding
Order Passed on
06/08/2012


333 03/2012(T) Satate Load despatch Centre

Petition for aggregate renewable requirement for year 2012-13 along with annual performance report for FY 2011-12 and True up for FY 2010-11.(T) 17/01/2012
Proceeding
Order Passed on
28/04/2012


334 04/2012(M) M/s Godawari Power & Ispat Limited
V/s
CSPDCL
Petition U/s 86(1)(k) of the Electricity Act 2003 read with Regulation 44 of the chhattisgarh State Electricity Regulatory Commission (Conduct of Business) Regulation 2009. 17/01/2012
Proceeding
Order Passed on
25/07/2016


Revised Order Passed on
21/01/2015


Order Passed on
26/06/2012


335 05/2012(T) Chhattisgarh State Power Transmission Co. Ltd.

Petition for Annual performance Review for 2010-11 & determination of transmission tariff for Financial year 2012-13 . 19/01/2012
Proceeding
Order Passed on
28/04/2012


336 06/2012(M) Baldev Alloys Private Limited

Petition for enhancement of load from 9000 KVA to 13000 KVA Under the provision of clause 12-15 & clause 3.4 of the chhattisgarh State Electricity supply code 2005. (M) 23/01/2012
Proceeding
Order Passed on
29/06/2012


337 07/2012(M) Suo Motu

Short term power purchase for the year 2012-13. 23/01/2012
Proceeding
Order Passed on
05/05/2012


338 08/2012(M) Chhattisgarh State Power Trading Co. Ltd.
V/s
M/s Salasar Steel & others
Petition to review the Common order dated 14.12.2011 in petition No. 29/2011(D) & four other connected petitioners. 25/01/2012
Proceeding
Order Passed on
27/06/2012


339 09/2012(T) Chhattisgarh State Power Generation Co. Ltd.

Petition for Annual performance review & True up for Financial year 2010-11 & determination of Generation tariff for Financial year 2010-11 to 2012-13.(T) 25/01/2012
Proceeding
Order Passed on
28/04/2012


340 10/2012(D) M/s Vandana Global Limited
V/s
Chhattisgarh State Power Distribution Co. Ltd
Billing to Generation Unit for eventual drawl of power from grid. 28/01/2012
Proceeding
Order Passed on
06/08/2012


341 11/2012(M) M/s. Jindal Steel & Power Ltd.

Petition to review the order dated 30.01.2012 in petition No. 7/2011(T) in the matter of ARR for Transmission business. 02/02/2012
Proceeding
Order Passed on
11/03/2013


342 12/2012(M) Suo Motu Respondent M/s. ACB India Ltd.

CPP, IPP status for the year 2010-11 06/03/2012
Proceeding
Order Passed on
01/07/2013


343 13/2012(M) Alok ferro Alloys Ltd.
V/s
CSPDCL
To review under dated 31.012.2011 in P.No. 37 of 2011(D) 03/02/2012
Proceeding
Order Passed on
26/06/2012


Appeal before Tribunal. Order passed on 16-01-2014 Website link
344 14/2012(M) Suo Motu

1. M/s. Jindal Steel & Power, Raigarh 2. M/s. Vandana Vidyut Ltd., Blaspur 3. M/s. Bharat Aluminum, Korba 4. M/s. Nalwa Sponge, Taraimal 5. Real Ispat & Power Borjhara
CPP, IPP status for the year 2006-07 06/03/2012
Proceeding
Order Passed on
18/06/2013


Appeal before Tribunal. Order passed on 23-09-2013 Website link
345 15/2012(M) M/s. Jayswal Neco
V/s
CSPDCL, CSPTCL
Potition U/s. 142 of the Electricity Act 2003 read with regulation 44 of the CSERC (Conduct of Business) Regulation, 2009 for non-compliance of regulation 7.3 - 7.8 (procedure for enhancement of contract demand connected load) at the CG Electricity Supply Code 2005 & Consequential relief therein 07/03/2012
Proceeding
Order Passed on
08/06/2012


346 16/2012(M) Shri Vasisth Narayan Mishra
V/s
BSP
Petition U/s 86(l)(k) of the Electricity Act 2003 read with regulation 44 of the Chhattisgarh State Electricity Regulatory Commission (Conduct of Business) Regulation 2009. 24/03/2012
Proceeding
Order Passed on
21/06/2012


347 17/2012(M) Powersol Engineers & Consultations Pvt. Ltd.
V/s
CSP Transmission Co. Ltd.
Petition for issuing of directives to the respondent to review the pre qualification criteria incorporated on turnkey basis in respect of EHT lines & EHT sub stations. 12/04/2012
Proceeding
Order Passed on
26/06/2012


348 18/2012(M) Jindal Power Limited
V/s
CSPDCL
Petition U/s 86(1)(f) at the Electricity Act, 2003 for reimbursement of unscheduled interchange charges for supply of upto 70 MW power through 400 KV route for period 21.04.2008 to 07.12.2008. 12/04/2012
Proceeding
Order Passed on
12/07/2013


Dismissed on 30-06-2014 Website link
349 19/2012(M) Chhattisgarh Steel & Power Ltd.
V/s
CSPTCL
Petition U/s 142, 147 & subsection 06 of the Electricity Act, in the matter of non-compliance of the CSERC tariff orders dated 22.10.2007 and 30.05.2009 by the respondent on account of non-applications of Intra-state transmission charges as determined in the social order in respect of inter-state of electricity transaction undertaken by the petition though short term open access. 28/04/2012
Proceeding
Order Passed on
26/06/2014


350 20/2012(M) Chhattisgarh Mini Steel Plant Associations.
V/s
CSPDCL
Petition under section regulations 44 of the CSERC (Conduct of business) Regulation, 2009 28/04/2012
Proceeding
Dismissed
351 21/2012(M) Suo Motu 1. NMDC 2. Vandana Vidhyut Ltd. 3. CREDA ... Respondent

Formalities for purchase of power under open access regulation. 03/05/2012
Proceeding
Order Passed on
18/01/2013


352 22/2012(M) Suo Motu 1. CSPDCL 2. JSPL 3. BSP 4. CBEDA .. Respondents

Adaptation of CERC tariff (Variable Cost) for FY 2012-13 & Subsequent years for purchase of Electricity Generated by Biomass Based Power Plants in Chhattisgarh by Distribution Licensee in Chhattisgarh . 05/05/2012
Proceeding
Order Passed on
28/05/2012


Appeal before Tribunal. Order passed on 29-04-2013 Website link
353 23/2012(D) M/s. Hira Power & Steel Ltd.
V/s
CSPDCL
Petition under 86 (1)(f) of the Electricity Act, 2003 against the supplement arty bill dated 25.11.2010 08/05/2012
Proceeding
Dismissed
354 24/2012(D) M/s. Agrawal Vidyut
V/s
CSPDCL
Grievance against non-consideration of fire-explosion force majeure condition for purchase of power by respondent. 22/05/2012
Proceeding
Order Passed on
14/03/2013


355 25/2012(D) M/s. Salasar Steel & Power, Ltd.
V/s
CSPDCL
Petition under section 86(1)(f) of the Electricity Act, 2003. 22/05/2012
Proceeding
Order Passed on
29/10/2014


356 26/2012(M) Suo Motu

In the matter of fuel & variable cost adjustment mechanism. 28/05/2012
Proceeding
Clarification
12/08/2012


Order Passed on
30/06/2012


357 27/2012(D) M/s. ACB India Ltd.
V/s
1. CSP Trading Co. Ltd. 2. ED, CSP Trading Co.Ltd.
Petition U/s. 86(1)(f) of the Electricity Act. 2003, for issuance of appropriate directions or orders. 29/05/2012
Proceeding
Order Passed on
12/07/2013


Appeal before Tribunal. Order passed on 07-08-2014 Website link
358 28/2012(M) Chhattisgarh Sponge Iron Manufacturers Association
V/s
1. CSPDCL 2. Jindal 3. Steel Authority of India 4. CREDA
Petition U/s 86(1)(e) of the Electricity Act, 2003 for promotion of Co-generation & providing exemption to co-generation from renewal purchase obligation. 11/06/2012
Proceeding
Clarification on order dated
21/05/2013


Order Passed on
21/05/2013


359 29/2012(M) CSPDCL
V/s
CSPGCL
Petition for approval of power purchase agreement for purchase of power from CSPGCL existing power station situated of Chhattisgarh State. 27/06/2012
Proceeding
Order Passed on
07/10/2016


360 30/2012(M) Chhattisgarh Steel and Power Ltd.
V/s
CSPTCL
Application for restoration of the petition dismissed in default. (M) 27/06/2012
Proceeding
Petition is admitted and dispose off by restoring the original petition i.e. 19 of 2012
361 31/2012(M) Suo Motu 1. Aryan Coal Benefications Ltd, Korba 2. Jindal Power Ltd. Raigarh 3. Lenco Amarkantak, Korba, 4. Monnet Ispat & Energy. 5. Bajrang Power & Steel. 6. Mahendra Sponge Power

CPP-IPP Status for the year 2011-12 (M) 04/07/2012
Proceeding
Order Passed on
05/03/2013


362 32/2012(M) CSPDCL
V/s
CSPGCL
Approval of power purchase agreement with CSPDCL for purchase of power from CSPGCL upcoming power station setting at Chhattisgarh State. 06/07/2012
Proceeding
Order Passed on
27/02/2016


363 33/2012(M) CSPDCL
V/s
SLDC, Raipur and others
Petition U/s. 142 of the Electricity Act 2003 for under injection by the open access. (M) 11/07/2012
Proceeding
Order Passed on
19/12/2014


Order Passed on
06/02/2014


Petition returned back to the petitioner
364 34/2012(M) CSPTCL

Levy & collection of certain miscellaneous & other charges for the services undertaken by Transmission Co. (M) 20/07/2012
Proceeding
Withdraw on 28.12.2013
365 35/2012(M) CSPTCL

Petition for review of order dated 28.03.2012 passed in petition No 36 of 2011(M) 25/07/2012
Proceeding
Dismissed
366 36/2012(D) Hira Power and Steel Ltd.
V/s
CSPDCL
Petition under section 86(1)(f) of the Electricity Act 2003, to referred parallel operation charges recovered for the period of 25.12.2010 - 29.12.2011 (D) 06/08/2012
Proceeding
Order Passed on
18/03/2013


367 37/2012(M) Suo Motu

In the matter of determination of generic tariff for Govt. of India Ministry of New & Renewable Energy Rooftop PV and small solar power generation programme (RPSSGP)" 2010. (M) 14/08/2012
Proceeding
Order Passed on
09/10/2012


368 38/2012(M) Raigarh Ispat Udyog Sangh
V/s
JSPL
Petition U/s 60, 62(6) Section 86(i)(k), section 86(3) & section 142 of the Electricity Act, 2003 & under regulation 44 of CSERC (Conduct of Business) Regulation, 2007 (M) 21/08/2012
Proceeding
Order Passed on
07/05/2013


369 39/2012(T) Jindal Steel & Power Ltd.

Petition for Annual Revenue Requirement for the licensed distributions business for FY 2012-13(T) 24/08/2012
Proceeding
Order Passed on
10/07/2013


Appeal before Tribunal. Order passed on 01-07-2014 Website link
370 40/2012(T) Jindal Steel & Power Ltd.

Petition for Annual Revenue Requirement for the licensed transmission business for FY 2012-13 (T) 24/08/2012
Proceeding
Order Passed on
10/07/2013


Appeal before Tribunal. Order passed on 05-02-2015 Website link
371 41/2012(D) Balaji Power
V/s
CSPDCL
Petition U/s. 86(i)(f) read with 142 of the Electricity Act, 2003(M) 27/08/2012
Proceeding
Order Passed on
29/10/2013


Appeal before Tribunal. Order passed on 20-03-2015 Website link
372 42/2012(M) M/s Lafarge India Private Limited
V/s
CSPDCL
Petition under regulation 44 of the CSERC (Conduct of Business) Regulation 2009 (M) 01/09/2012
Proceeding
Order Passed on
27/12/2012


373 43/2012(D) M/s. Jindal Power Ltd. & Jindal Steel & Power Ltd.
V/s
CSPDCL
Petition U/s 86(1)(f) of the Electricity Act, 2003 for recovery of transmission charges for supply of 230 MW of power pursuant to agreement dated 23 March 2007 for the period of of 08/12/2007 to 09/03/2009. (D) 03/10/2012
Proceeding
Order Passed on
10/07/2013


Appeal is dismiss on 30-06-2014 Website link
374 44/2012 (M) M/s. Godawari Power & Ispat Ltd, Raipur
V/s
CSPDCL
Complaint U/s 142 of the Electricity Act, 2003 for Non-Compliance of the order dated 26/06/12 passed in P. No. 04 of 2012. (M) 08/10/2012
Proceeding
Order Passed on
31/10/2013


Appeal before Tribunal. Order passed on 16-02-2015 Website link
375 45/2012(M) M/s Sarawagi Co. (P) Ltd.
V/s
CSPDCL
Petition U/s 86 (1) (e) of the Electricity Act, 2003 read with regulation 44 of Chhattisgarh State Electricity Regulatory Commission (Conduct of Business ) Regulations, 2009. (M) 19/10/2012
Proceeding
Order Passed on
08/01/2013


376 46/2012(M) M/s Alok Ispat Private Ltd.
V/s
Jindal Steel & Power Ltd.
Petition U/s 60, Section 86 (1)(i), Section (1) (k), Section 86 (3) & Section 142 of the Electricity Act, 2003 & under regulation 44 of CSERC (Conduct of Business ) Regulations, 2009for recovery of charges along with interest u/s 62 (6) of the Electricity Act, 2003. (M) 30/10/2012
Proceeding
Reject the petition at the stage of admission on 22.11.2012
377 47/2012(M) Suo Motu

Determination of principal & Methodology for allocation of surplus/deficit of CSEB era between all the successor company of the Board. 09/11/2012
Proceeding
Order Passed on
11/07/2013


378 48/2012(M) M/s Lanco Amarkantak Power Ltd
V/s
CSPTCL
Petition for determination of a dispute under section 86 (1)(f) of the Electricity Act, 2003 regarding tariff for sale of power by the applicant from unit 2 of lanco amarkantak power Ltd. to the respondent. 23/11/2012
Proceeding
Order Passed on
30/12/2014


379 49/2012(M) R. R. Energy Limited
V/s
Chief Engineer (Comm.) CSPDCL & Anr
Approval of billing modalities for sale of power though intra-state open access from biomass based power generator to open access industries on short term basis. 04/12/2012
Proceeding
Order Passed on
06/06/2013


380 50/2012(M) M/s Jindal Steel & Power Ltd.

Petition for MY Annual Revenue Requirement for the liceneed transmission business for the control period FY 2013-14 to FY 2015-16 & determination of tariff for FY 2013-14. 11/12/2012
Proceeding
Order Passed on
12/07/2013


381 51/2012(M) Chhattisgarh State Power Transmission Co. Ltd

Capital Investment Plan for the control period from FY 2013-14 to FY 2015-16. 11/12/2012
Proceeding
Corrigendum
06/07/2013


Order Passed on
09/04/2013


382 52/2012(M) Chhattisgarh State Power Generation Co. Ltd.
V/s
Capital Investment Plan for the control period from FY 2013-14 to FY 2015-16. 11/12/2012
Proceeding
Order Passed on
06/06/2013


383 53/2012(M) State Load Despatch Centre

Capital Investment Plan for the control period from FY 2013-14 to FY 2015-16. 11/12/2012
Proceeding
Order Passed on
08/04/2013


384 54/2012(M) Chhattisgarh State Power Distribution Co. Ltd.

Capital Investment Plan for the control period from FY 2013-14 to FY 2015-16. 11/12/2012
Proceeding
Order Passed on
08/04/2013


385 55/2012(T) JSPL, Raigarh

Petition for MY Annual Revenue Requirement for the licensed distribution business for the control period FY 2013-14 to FY 2015-16 & determination of tariff for FY 2013-14. (T) 21/12/2012
Proceeding
Order Passed on
12/07/2013


Appeal before Tribunal. Order passed on 01-07-2014 Website link
386 56/2012(M) Lafarge India Pvt.
V/s
CSPDCL
Petition U/s 86 (1) (k), section 142,147, subsection 6 of section 62 & subsection 5 of section 45 of the Act in the natter of excess billing to an open access captive consumer. (M) 22/12/2012
Proceeding
Order Passed on
29/03/2016


Order Passed on
12/03/2013


387 57/2012(M) SLDC
V/s
Rashmi Sponge Iron Ltd.
Petition U/s 24(6) of the CSERC (SLDC Fees & Charges) & other related matter Regulation, 2010 24/12/2012
Proceeding
Order Passed on
29/05/2013


388 58/2012(M) CSPDCL
V/s
NTPC Vidhyut Vyapar Nigam Limited
Petition for approval of power sale/purchase agreement between NVVN & CSPDCL on long term basis U/s 86 (1) (b) of Electricity Act. 26/12/2012
Proceeding
Order Passed on
09/07/2013


389 59/2012(M) Chhattisgarh State Load Despatch Center
V/s
Bajrang Power & Ispat Ltd. & others
Petition under section 33 (1) & (5) of the Electricity Act, 2003 for imposing penalty on the respondents intra state users. 27/12/2012
Proceeding
Dismissed
390 60/2012(M) Suo Motu

Generic preferential tariff under regulation of the CSERC RE tariff regulation 2012 for FY 2012-13 (M) 29/12/2012
Proceeding
Order Passed on
18/03/2013


391 61/2012(M) M/s Monnet Ispat & Energy Ltd.
V/s
CSPDCL
Under section 49 read with 86 (1) (f) & (k) of the Electricity Act, 2003 read with CG.State Electricity Regulatory Commission (Conduct of Business) Regulation, 2009. 31/12/2012
Proceeding
Order Passed on
30/05/2014


392 62/2012(M) Suo Motu

Compliance of the renewable purchase obligation (RPO) of the Distribution License. for the year 2012-11. (M) 31/12/2012
Proceeding
Order Passed on
18/06/2013


393 01/2013(D) M/s Lafarge India Pvt. Ltd.
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Petition for review of order dated 27.12.2012 passed in petition No. 42 of 2012(D) 07/01/2013
Proceeding
Closed
394 02/2013(M) Suo Motu

CSPDCL .. Respondent
Short term power purchase for the year 2013-14 22/01/2013
Proceeding
Order Passed on
02/05/2013


395 03/2013(T) Suo Motu CSPDCL Respondent

Petition for approval of ARR for the control period from FY 2013-14 to 2015-16. and retail tariff for FY 2013-14 . 23/01/2013
Proceeding
Order Passed on
12/07/2013


Appeal before Tribunal. Order passed on 21-03-2016 Website link
396 04/2013(T) Suo Motu

Chhattisgarh State Power Generation Co. Ltd. Respondent
Petition for approval of ARR & fixation of tariff for the control period from FY 2013-14 to 2015-16. 23/01/2013
Proceeding
Dropped
397 05/2013(T) Suo Motu

Chhattisgarh State Power Transmission Co. Ltd. Respondent
Petition for approval of ARR & fixation of tariff for the control period from FY 2013-14 to 2015-16. 23/01/2013
Proceeding
Dropped
398 06/2013(T) Suo Motu

Determination of tariff Small/Mini Hydro plants of CSPGCL. 02/02/2013
Proceeding
Order Passed on
09/07/2013


399 07/2013(M) M/s Steel Authority of India
V/s
CSPDCL CREDA
Recognizing industrial co-generation for fulfilling RPO obligation as per CSERC (Renewable Purchase Obligation & REC Framework Implementation) Regulation 2011 by BSP. 14/02/2013
Proceeding
Clarification on order dated
21/05/2013


Order Passed on
21/05/2013


400 08/2013(T) Suo Motu BSP-TEED (SAIL)

Petitions for approval of ARR for the Control period from FY 2013-14 to FY 2015-16 and retail Tariff for FY 2013-14 18/02/2013
Proceeding
Order Passed on
07/05/2014


401 09/2013((M) CSPDCL

Approval of another dues settlement scheme "Suvidha" for recovery of outstanding dues against LT Consumers. 18/02/2013
Proceeding
Order Passed on
16/03/2013


402 10/2013(T) Vandana Vidhyut Ltd.
V/s
CSPDCL
Determination of fixed cost for Supply of power by the petitioner to the responded CSPDCL 20/02/2013
Proceeding
Order Passed on
04/03/2014


Appeal before Tribunal. Order passed on 17-11-2015 Website link
403 11/2013(M) SLDC

Petition for the approval of Aggregate Revenue Requirement (ARR) of SLDC, CSPTCL for Rs. 13.83 crores for FY 2013-14, Rs. 14.91 crores of FY 2014-15 & Rs. 16.93 crores of FY 2015-16 respectively during the MYT control period 2013-16 07/03/2013
Proceeding
Order Passed on
09/07/2013


404 12/2013(D) M/s. Vandan Global Ltd.
V/s
CSPDCL
Direction to set aside not to recover the levy of cross subsidy surcharge in terms of supplementary bill dated 13.02.2013 & not to disconnect supply of power to the petitioner. 21/03/2013
Proceeding
Order Passed
24/04/2015


405 13/2013(T) Shri Shyam Warehousing & Power Pvt. Ltd.
V/s
CSPDCL
Determination of tariff for purchase of electricity generated by the petitioners by the respondent. 23/03/2013
Proceeding
Order Passed on
16/12/2013


406 14/2013(M) Vandana Global Ltd.
V/s
CSPTCL
23/03/2013
Proceeding
Order Passed on
24/06/2014


407 15/2013(D) Hira Ferro Alloys. Ltd.
V/s
CSPDCL
Petition under section 86(1)(f) R/w sections 86(i)(K) of the electricity act, 2003 23/03/2013
Proceeding
Order Passed on
28/10/2013


408 16/2013(M) BSPCL Infrastructure Ltd.
V/s
CSPDCL
Under Section 62 of the Electricity Act 2003 R/W regulation 44 of the (Conduct of Business) Regulations, 2009 25/03/2013
Proceeding
Order Passed on
26/09/2013


Appeal before Tribunal. Order passed on 14-01-2015 Website link
409 17/2013(M) CREDAI
V/s
CSPDCL
Petition U/s 142 R/w section 149 of Electricity Act, 2003 according non-compliance of provisions of supply code, 2011 01/04/2013
Proceeding
Order Passed on
10/07/2013


Appeal before Tribunal. Order passed on 09-07-2014 Website link
410 18/2013 Suo Motu

Generic preferential tariff under regulation 8 of the CSERC RE tariff regulation, 2012 for FY 2013-14 01/04/2013
Proceeding
Order Passed on
10/07/2013


411 19/2013(M) CSPDCL
V/s
1. Power grid Corporation of India Ltd. 2. Power System Operation Corporation Ltd. 3. Western Regional Load Despatch Center.
Violation of section 12 & First proviso to section 38(1) by the Power Grid Corporation of India Ltd. &/or Power System Operation Corporation Ltd. within Chhattisgarh in making supply arrangements &/or supply to generation companies in Chhattisgarh for consumption for start-up &/or for any other purpose whatsoever 10/04/2013
Proceeding
Order Passed on the point of Jurisdiction
03/09/2013


412 20/2013(M) Bajrang Power & Inspat Ltd.
V/s
1. Chief Electrical Inspector. 2. CSPDCL 3. CREDA
Petition for approval of methodology for determination of net electricity generation & its captive consumption on steam proportion of tatal steam produced by Bio Mass fired FBC Boiler & WHRB Boilers as well petitioner's total power generation & its total captive consumption for calculation of levy at cross subsidy surcharge. 10/04/2013
Proceeding
Withdrawn
413 21/2013(T) CSPGCL

Petition for MYT ARR for control period 2013-14 to 2015-16 & true up for previous year. 10/04/2013
Proceeding
Order Passed on
12/07/2013


Appeal before Tribunal. Order passed on 21-03-2016 Website link
414 22/2013(T) CSPTCL

Petition for true up ARR for year 2012-13 & ARR for control period 2023-14 to 2015-16. 10/04/2013
Proceeding
Order Passed on
12/07/2013


Appeal before Tribunal. Order passed on 21-03-2016 Website link
415 23/2013 M/s. Singhal Forestry Pvt. Ltd.
V/s
CSPDCL
Petition U/s. 86(1)(E) & (F) of the Electricity Act, 2003 for adjudication of disputes between the generating Co. and the respondent Licensee 26/04/2013
Proceeding
Order Passed on
23/12/2013


416 24/2013(D) M/s. R.R. Energy Limited
V/s
Chhattisgarh State Power Transmission Co.Ltd.
Petition U/s 142, 86(1)(K) & subsections 6 of section 62 of the Electricity Act, 2003. Non compliance of Tariff order dated 30.05.2009. 07/05/2013
Proceeding
Dismissed
417 25/2013(M) Suo Motu CSPDCL BSP JSPL CREDA

Compliance of the renewable purchase obligation (RPO) of the Distribution licensee for the year 2011-12. 09/05/2013
Proceeding
Order Passed on
15/10/2014


418 26/2013 Suo Motu CSPTr.CL

Annual license fee of Chhattisgarh /State Power Trading Co. Ltd. 22/05/2013
Proceeding
Order Passed on
15/06/2016


Order Passed on
24/07/2013


419 27/2013 Suo Motu CBEDA CSPDCL JSPL BSP CREDA

Adoption of CERC tariff (Variable Cost) for FY 2013-14 & subsequent year for purchase of electricity generated by biomass based power plant in C.G. State by distribution license in C.G. 22/05/2013
Proceeding
Order Passed on
02/07/2013


420 28/2013(D) Hira Ferro Alloys Ltd.
V/s
CSPDCL
Petition under section 86(1)(F) & Section 142 read with section 146 of the Electricity Act, 2003 27/05/2013
Proceeding
Order Passed on
25/01/2014


Appeal before Tribunal. Order passed on 04-11-2015 Website link
421 29/2013(M) M/s. Jayswal Neco Industries Ltd.
V/s
CSPDCL CSE consumer Grievances Redressal Forum
Clarification with respect to interpretation & scope of provisions of the Supply Code & Gride Code & their applicability & further clarification with respect to the order dt. 23.04.11 passed by the hon,ble Commission in petition No. 61 of 2009(M) 29/05/2013
Proceeding
Order Passed on
30/12/2014


422 30/2013(D) Hira Power & Steel Ltd.
V/s
CSPDCL
Petition U/s. 86(1)(f) & Section 142 r/w section 146 of the Electricity Act, 2003. 30/05/2013
Proceeding
Order Passed on
29/11/2014


Appeal before Tribunal. Order passed on 04-11-2015 Website link
423 31/2013 Salasar Steel & Power Ltd.
V/s
CSPDCL
Petition U/s. 86(1)(f) of the Electricity Act, 2003 to set aside the bill dated 18.03.2013 & to direct the respondent not to recover the levy of cross subsidy surcharge for the year 2010-11. 06/06/2013
Proceeding
Order Passed on
10/09/2014


424 32/2013(M) SLDC
V/s
National Energy Trading & Sercices Ltd. Gurgaon, Haryana
Petition regarding persistent defaults in payment of SLDC fee & charges i.e. SoC & MoC against MTOS 06/06/2013
Proceeding
Order Passed on
25/11/2013


425 33/2013 Suo Motu M/s. Monnet Ispat, Raipur CSPDCL

CPP Status 05/06/2013
Proceeding
Order Passed on
22/08/2014


426 34/2013 Suo Motu M/s. Monnet Ispat Raigarh CSPDCL

CPP Status 05/06/2013
Proceeding
Order Passed on
22/08/2014


427 35/2013(D) M/s. Chhattisgarh Investment Ltd.
V/s
CSPDCL
U/s. 186(1)(f) of the Electricity Act 2003, for adjudication of dispute U/s. 142 of the Act for non compliance of commission order regarding tariff. 28/06/2013
Proceeding
Order Passed on
23/12/2013


428 36/2013(D) M/s. Salasar Steel & Power
V/s
CSPDCL
Petition U/s. 86(1)(f) of the Electricity Act 2003 to set aside the bill dated 23.05.2013 & to direct the respondent not to recover the levy of cross-subsidy surcharge for the year 2011-12. 09/07/2013
Proceeding
Order Passed on
10/09/2014


429 37/2013(D) M/s. Bhagwati Power & Steel Ltd.
V/s
CSPDCL
Petition U/s. 86(1)(f) of the Electricity Act, 2003 to set aside the bill dated 10.06.2013 & to direct the respondent not to recover the levy of cross-subsidy surcharge for the year 2011-12. 11/07/2013
Proceeding
Order Passed on
29/11/2014


430 38/2013(M) M/s. Vandana Global Ltd.
V/s
CSPDCL
Petition for deciding the 7th September 2013 manner of levy of parallel operation charges payable by captive of generating plants. 22/07/2013
Proceeding
Order Passed on
29/11/2014


431 39/2013(D) Vandana Global. Ltd.
V/s
C.S. Power Trading co. Ltd.
Petition Under Section 86(1)(f) of the Electricity Act, 2003. 27/07/2013
Proceeding
Order Passed on
31/10/2013


Appeal before Tribunal. Order passed on 02-09-2014 Website link
432 40/2013 Salasar Steel & Power Ltd.
V/s
C.S. Power Trading Co. Ltd.
Petition Under Section 86(1)(f) of the Electricity Act, 2003. 27/07/2013
Proceeding
Order Passed on
31/10/2013


Appeal before Tribunal. Order passed on 02-09-2014 Website link
433 41/2013 S.K.S. Ispat & Power Ltd.
V/s
C.S. Power Trading Co. Ltd.
Petition Under Section 86(1)(f) of the Electricity Act, 2003. 27/07/2013
Proceeding
Order Passed on
31/10/2013


Appeal before Tribunal. Order passed on 02-09-2014 Website link
434 42/2013 Jagdamba Power & Alloys Ltd.
V/s
CS Power Trading Co. Ltd.
Petition Under Section 86(1)(f) of the Electricity Act, 2003. 27/07/2013
Proceeding
Order Passed on
31/10/2013


Appeal before Tribunal. Order passed on 02-09-2014 Website link
435 43/2013 Shree Nakoda Ispat Ltd.
V/s
CS Power Trading Co. Ltd.
Petition Under Section 86(1)(f) of the Electricity Act, 2003. 27/07/2013
Proceeding
Order Passed on
31/10/2013


436 44/2013 Hira Ferro Alloys Ltd.
V/s
CS Power Trading Co. Ltd.
Petition Under Section 86(1)(f) of the Electricity Act, 2003. 27/07/2013
Proceeding
Order Passed on
31/10/2013


Appeal before Tribunal. Order passed on 02-09-2014 Website link
437 45/2013 Godawari Ispat & Power Ltd.
V/s
CS Power Trading Co. Ltd.
Petition Under Section 86(1)(f) of the Electricity Act, 2003. 27/07/2013
Proceeding
Order Passed on
31/10/2013


Appeal before Tribunal. Order passed on 02-09-2014 Website link
438 46/2013(M) CSPDCL
V/s
Iffco Chhattisgarh Power Ltd.
Approval of power purchase agreement for a quantum of 1116 MW coal based power plant 27/07/2013
Proceeding
439 47/2013 Godawari Power & Ispat Ltd.
V/s
CSPDCL
Petition U/s. 86(1)(f) & section 142 R/w Section 146 of the electricity Act, 2003 to set aside the supplementary bill dated 05.06.2013. 27/07/2013
Proceeding
Order Passed on
25/01/2014


Appeal before Tribunal. Order passed on 04-11-2015 Website link
440 48/2013 Suo-Motu

Monnet Ispat & Energy Ltd., Raipur/Raigarh
CPP status FY 2009-10 & 2008-09 Monnet, Raipur (2009-10) Monnet, Raigarh (2008-09) 05/08/2013
Proceeding
Order Passed on
22/08/2014


441 49/2013 Gopal Sponge & Power (P) Ltd.
V/s
CSPDCL
Petition U/s. 86(1)(f) of the electricity Act, 2003 to set aside the supplementary bill dated 13.02.2013. (D) 08/08/2013
Proceeding
Order Passed on
04/12/2014


442 50/2013 Suo-Motu CSPDCL BSP JSPL CREDA & other entities

Compliance of the renewable purchase obligation (RPO) of the Distribution Licensee for the year 2012-13 (D) 13/08/2013
Proceeding
Order Passed on
15/10/2014


443 51/2013 Real Ispat & Power Ltd.

Review peition u/s 94 (1)(f) of the E.A. 2003(M) 26/08/2013
Proceeding
Order Passed on
26/10/2013


444 52/2013 G.R. Sponge & Power Ltd.

Review peition u/s 94(1)(f) of the E.A. 2003, in the matter of Captive Status of Power Plant during the year 2008-09(M) 26/08/2013
Proceeding
Order Passed on
29/10/2013


445 53/2013 Real Ispat & Power Ltd.

Review peition u/s 94 (1)(f) of the E.A. 2003(M) 26/08/2013
Proceeding
Order Passed on
26/10/2013


446 54/2013 API Ispat & Power Ltd.
V/s
CSPDCL
Petition U/s. 86(1)(f) & section142 R/w Section 146 of the electricity Act, 2003 to set aside the supplementary bill dated 26.07.2013.(M) 26/08/2013
Proceeding
Order Passed on
29/11/2014


447 55/2013 Salasar Steel & Power Ltd.
V/s
CSPDCL
Petition U/s. 86(1)(f) & section142 R/w Section 146 of the electricity Act, 2003 to set aside the supplementary bill dated 29.06.2013.(D) 26/08/2013
Proceeding
Order Passed on
23/12/2014


Appeal before Tribunal. Order passed on 17-02-2016 Website link
448 56/2013 M/s Salasar Steel & Power Ltd.
V/s
CSPDCL
Petition U/s. 86(1)(f) of the electricity Act, 2003. (D) 26/08/2013
Proceeding
Order Passed on
21/11/2014


449 57/2013 JSPL
V/s
CSP Transmission Company Ltd.
Petition under Regulation 44 of the CSERC (Conduct of Business) Regulation, 2009 for relaxation in Commissioning CT, BT & ABT meter for about three months. 13/08/2013
Proceeding
Order Passed on
10/01/2014


450 58/2013 JSPL
V/s
Petition under Regulation CSERC (Conduct of Business) Regulation, 2009, Application for clarifications for issuance of appropriate direction pursuant to the order dated 18.06.2013 passed in P.NO. 14 of 2012 (M) 29/08/2013
Proceeding
Tagged in Petition No. 74 of 2013
451 59/2013 Salasar Steel & Power Ltd.
V/s
CSPDCL
Petition U/s. 86(1)(f) & section142 R/w Section 146 of the electricity Act, 2003 to set aside the supplementary bill dated 18.08.2013 & restrain the respondnet from recovery the cross subsidy surcharge for the FY 2007-08 & from disconnecting the supply of power to the petitioner (D) 29/08/2013
Proceeding
Order Passed on
29/10/2014


452 60/2013 Bharat Alluminum Company Ltd.

Review petition u/s 94(1)(f) of the E.A. 2003,(M) 30/08/2013
Proceeding
Order Passed on
25/11/2014


453 61/2013(D) M/s. Monnet Ispat & Energy Ltd., Raigarh
V/s
CSPDCL
Petition for setting aside the demand raised by CSPDCL for payment of POC. 04/09/2013
Proceeding
Order Passed on
29/11/2014


454 62/2013(D) M/s. Monnet Ispat & Energy Ltd., Raipur
V/s
CSPDCL
Petition for setting aside the demand raised by CSPDCL for payment of POC. 04/09/2013
Proceeding
Order Passed on
29/11/2013


455 63/2013(M) Suo Motu

BSP .. Respondent
Sou Motu petition U/s 142 of the Electricity Act, 2003 agaisnt BSP-TEED for non-Compliance of MYT regulation & direction of Commission. 05/09/2013
Proceeding
Proceeding dropped and case is closed
456 64/2013 M/s. G.R. Sponge & Power Ltd.
V/s
CSPDCL
Clarification in the matter of methodology prescribed by the Commission for billing of cross subsidy surchage for supply of power by CGP to consumer and treatment of POC paid by CGP . 05/09/2013
Proceeding
Order Passed on
22/12/2014


457 65/2013 M/s. Shree Nakoda Ispat Ltd.
V/s
CSPDCL
Clarification in the matter of methodology prescribed by the Commission for billing of cross subsidy surchage for supply of power by CGP to consumer and treatment of POC paid by CGP. 12/09/2013
Proceeding
Order Passed on
22/12/2014


458 66/2013 M/s. Shri Bajrang Power & Ispat Ltd.
V/s
CSPDCL
Petition for relaxation in clause No. 3.4 of the system of supply & classification of consumers of Chhattisgarh State Electricity Supply Code, 2011 for minimum CD from 1500 to 2000KVA at 220 KV supply voltage by CSPDCL. 18/09/2013
Proceeding
Order Passed on
12/05/2014


459 67/2013(D) M/s Bharat Aluminium Company Ltd.
V/s
CSPDCL & 2 others
Petition under section of the Electricity Act 18/09/2013
Proceeding
Order Passed on
16/01/2014


460 68/2013(M) M/s. Jagdamba Power & Alloys Ltd.
V/s
Cheif Electricial Inspector
Review petition U/s 9u(1)(f) of the Electricity Act, 2003 in the matter of captive status of power plant during the F.Y. 2007-02 25/09/2013
Proceeding
Order Passed on
29/10/2013


461 69/2013 M/s. API Ispat & Powertech (P) Ltd.
V/s
CSPDCL
Petition under section 86(1)(g) and section 142 r/w section 146 of the Electricity Act, 2003 to set aside the supplementary bill dated 19.08.2013 30/09/2013
Proceeding
Order Passed on
22/12/2014


462 70/2013(M) SLDC
V/s
Aryan Coal Benefications India Ltd. & 19 others
Non Compliance of backing down instruction & for imposing penalty as per regulations 13.2.2 of C.G. Electricity Grid Code, 2011 and read with under section 35(5) of the Electricity Act, 2003 during the period April 2012 to June 2012. 11/10/2013
Proceeding
20. M/s. Vaswani Industries Ltd., Raipur
29/10/2015


19. M/s. Vandana Global Ltd., Siltara, Raipur
29/10/2015


18. M/s. Vandana Energy & Steel Pvt. Ltd., Raipur
29/10/2015


17. M/s. Salasar Steel & Power Ltd. Siltara, Raipur.
29/10/2015


16. M/s. SKS Ispat & Power Ltd., Siltara, Raipur.
29/10/2015


15. M/s. Sarda Energy & Minerals Ltd., Raipur
29/10/2015


14. M/s. Rameshwaram Steel & Power Pvt. Ltd., Raigarh.
29/10/2015


13. M/s. Rashmi Sponge Iron & Power Industries Ltd., Raipur.
29/10/2015


12. M/s. Real Ispat & Power Ltd., Raipur.
29/10/2015


11. M/s. MSP Steel & Power Ltd., Raigarh
29/10/2015


10. M/s. Mahendra Sponge & Power Pvt. Ltd., Siltara, Raipur.
29/10/2015


9. M/s. Mahavir Energy & Coal Benefication Ltd., Bilaspur.
29/10/2015


8. M/s. Jindal Steel & Power Ltd., Raigarh
29/10/2015


7. M/s. Godawari Power & Ispat Ltd., Siltara, Raipur.
29/10/2015


6. M/s. Drolia Electro Steel Pvt. Ltd., Raipur.
29/10/2015


5. M/s. Chhattisgarh Steel & Power Ltd., Champa.
29/10/2015


4. M/s. Corporate Ispat Alloys Ltd., Siltara, Raipur.
29/10/2015


3. M/s. Shri Bajrang Power & Ispat Ltd., Raipur.
29/10/2015


2. M/s. Bharat Aluminium Co. Ltd. Korba
29/10/2015


1. M/s. Aryan Coal Beneficiation India Ltd. Korba.
29/10/2015


Order Passed on
23/12/2013


463 71/2013(D) M/s Salasar Steel & Power Ltd.
V/s
CSPDCL
Petition u/s 142 & 146 of the EA 2003 and Regulations 44 of the CSERC (Conduct of Business) REgulation 2009 for non-compliacne of the order dated 02.07.2013 & 11.09.2013. Passed by Commission in petition no. 31 if 2013(D) 21/10/2013
Proceeding
Order Passed on
21/10/2014


464 72/2013(D) M/s Salasar Steel & Power Ltd.
V/s
CSPDCL
Petition u/s 142 & 146 of the EA 2003 and Regulations 44 of the CSERC (Conduct of Business) REgulation 2009 for non-compliacne of the order dated 02.09.2013. Passed by Commission in petition no. 56 if 2013(D) 21/10/2013
Proceeding
Order Passed on
22/11/2014


465 73/2013(M) Shri Bajrang Power & Ispat Ltd.
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Petition for "Request for amendment in HT Tariff for Simga Water Pump house having CD of 1000 KVA on 33KV 06/11/2013
Proceeding
Withdrawn on 13.02.2014
466 74/2013(D) JSPL
V/s
CSPDCL & others
Petition under section 86(1)(f) of the Electricity Act, 2003 read with rule 3 of the E.A. 2005, Electricity (Removable of difficulty) fourth order, 2005 & Regulation 33(b)(i) & 33(7) of the CSERC (Connectivity Intra State Open Access) Regulation, 2011 for year 2006-07 11/11/2013
Proceeding
Order Passed on
13/10/2014


467 75/2013(M) M/s S.V. Power Pvt Ltd.
V/s
CSPDCL & another
Petition u/s 86(1)(c) & 86(1)(f) of the Electricity Act, 2003 30/11/2013
Proceeding
Order Passed on
29/11/2014


468 76/2013(T) M/s Bhilai Steel Plant (BSP))(TEED)

Submission of petition by BSP for retail tariff of FY 2013-14 03/12/2013
Proceeding
Order Passed on
07/05/2014


469 77/2013(D) M/s JSPL
V/s
CSPDCL, CSPTCL
Petition u/s 86(1)(f) for adjudication on dispute 16/12/2013
Proceeding
Order Passed on
02/01/2015


Appeal before Tribunal. Order passed on 02-02-2016 Website link
470 78/2013(D) M/s Godawari Power & Ispat Ltd.
V/s
CSPTCL
Petition under regulation 13.6 of the Chhattisgarh State Grid Code, 2011 16/12/2013
Proceeding
Order Passed on
11/09/2014


471 79/2013(D) JSPL
V/s
CSPDCL & others
Petition under section 86(1)(f) of the Electricity Act, 2003 read with rule 3 of the E.A. 2005, Electricity (Removable of difficulty) fourth order, 2005 & Regulation 33(b)(i) & 33(7) of the CSERC (Connectivity Intra State Open Access) Regulation, 2011for year 2007-08 & 2008-09 23/12/2013
Proceeding
Order Passed on
15/10/2014


472 80/2013(M) CSPDCL
V/s
Vandana Vidyat Ltd.
Approval of Power purchase Agreement (PPA) exceed between CSPDCL & vandana Vidyut Ltd. u/s 86(1)(f) 24/12/2013
Proceeding
Order Passed on
19/02/2014


Corrigendum on
28/02/2014


473 81/2013(M) Suo-Motu SLDC, CSPDCL CSPGCL

Removal of difficulty in the matter of order dated 25.11.2013 in P.NO. 32 of 2013(M) . 24/12/2013
Proceeding
Dispose off on
23/02/2018

474 82/2013(T) Chhattisgarh State Power Generation Co. Ltd. (Business Plan)

Additional Capital investment plan of CSPGCL for FY 2013 to 2016. Petition U/s 62 & 86 of the Electricity Act, 2003. 30/12/2013
Proceeding
Order Passed on
29/03/2013


475 83/2013(M) Suo-Motu M/s Bhagwati Power & Steel Ltd.

In the matter of generation & Consumption of power plant the State for the year 2012-13 30/12/2013
Proceeding
Order Passed on
21/04/2014


476 84/2013(M) Suo-Motu M/s Monnet Ispat & Energy Ltd., Raigarh

In the matter of generation & Consumption of power plant the State for the year 2012-13 30/12/2013
Proceeding
Order Passed on
29/10/2014


Review order Passed on
28/08/2014


Order on application for impleadment of CSPDCL as respondent
25/04/2014


477 85/2013(M) Suo-Motu M/sGopal Sponge & Power (p) Ltd.

In the matter of generation & Consumption of power plant the State for the year 2012-13 30/12/2013
Proceeding
Order Passed on
21/04/2014


478 86/2013(M) Suo-Motu M/s API Ispat & Powertech Pvt. Ltd.

In the matter of generation & Consumption of power plant the State for the year 2012-13 30/12/2013
Proceeding
Order Passed on
21/04/2014


479 87/2013(M) Suo-Motu M/s Shri Nakoda Ispat Ltd.

In the matter of generation & Consumption of power plant the State for the year 2012-13 30/12/2013
Proceeding
Order Passed on
17/06/2014


480 88/2013(M) Suo-Motu M/s Salasar Steel & Power Ltd.

In the matter of generation & Consumption of power plant the State for the year 2012-13 30/12/2013
Proceeding
Order Passed on
21/04/2014


481 89/2013(M) Suo-Motu M/s Raipur Power & Steel Ltd.

In the matter of generation & Consumption of power plant the State for the year 2012-13 30/12/2013
Proceeding
Order Passed on
21/04/2014


482 90/2013(M) Suo-Motu M/s Ind Synergy Ltd.

In the matter of generation & Consumption of power plant the State for the year 2012-13 30/12/2013
Proceeding
Order Passed on
21/04/2014


483 01/2014 M/s CSPDCL
V/s
Chhattisgarh Electricity Consumer Grievance Redressal Forum, Raipur
Petition U/s 142 of the Electricity Act, 2003 for violation of provision U/s 10.12 of the Chhattisgarh State Electricity Supply Code, 2011 and section 25 of CSERC (Redressal of Grievances of Consumers) Regulations, 2011 22/01/2014
Proceeding
Order Passed on
07/04/2014


Appeal before Tribunal. Order passed on 03-03-2015 Website link
484 02/2014 M/s. Amar Kumar Agrawal
V/s
M/s. Mahavir Energy and Coal Beneficiation Ltd., Bilaspur
Revision under rule-3 of work of licenses rules, 2006 28/01/2014
Proceeding
Preliminary Objection order Passed on
30/07/2014


Preliminary Objection order Passed on
30/07/2014


485 03/2014 Shri Prem Chand Bharti
V/s
Executive Engineer and Others
U/s 142 of the Electricity Act, 2003 06/02/2014
Proceeding
Order Passed on
02/08/2014


486 04/2014 Chhattisgarh Steel & Power Ltd.
V/s
CSPTCL
Miscellaneous petitions regarding non-compliance of regulation related to Supply Code, 2007 and refund of access amount collected from the petitioner. 06/02/2014
Proceeding
Order Passed on
06/06/2014


487 05/2014(T) Chhattisgarh State Power Generation Co. Ltd. (CSPGCL)

Petition for approval of true-up of Thermal Power Plants for FY 2011-12 & 2012-13 and true-up of Hydro Plants for the Control Period FY 2010-11 to 2012-13 (T) 12/02/2014
Proceeding
Order Passed on
12/06/2014


Appeal before Tribunal. Order passed on 26-05-2016 Website link
488 06/2014(T) Chhattisgarh State Power Transmission Co. Ltd. (CSPTCL)

Petition for final true-up FY 2011-12 & 2012-13 alongwith determination of transmission tariff for FY 2014-15 (T) 12/02/2014
Proceeding
Order Passed on
12/06/2014


Order on remanded case of petition No. 06/2014 by Hon'ble APTEL on issue related to CSPTCL
21/09/2016


Appeal before Tribunal. Order passed on 26-05-2016 Website link
489 07/2014(T) Chhattisgarh State Power Distribution Co. Ltd. (CSPDCL)

Petition for the approval of CSPDCL final true-up, 2011-12, provisional true-up FY 2012-13 & revised ARR FY 2014-15 (T) 14/02/2014
Proceeding
Order Passed on
12/06/2014


Appeal before Tribunal. Order passed on 26-05-2016 Website link
490 08/2014(T) Chhattisgarh State Load Despatch Centre (SLDC)

Petition for the true-up of FY 2010-11 to 2012-13, aggregated performance report for the FY 2013-14 & ARR for the FY 2014-15 for SLDC. 25/02/2014
Proceeding
Order Passed on
12/06/2014


Appeal before Tribunal. Order passed on 26-05-2016 Website link
491 09/2014(M) M/s Bhilai Steel Plant (BSP)

Review petition under section 94(f) of the Electricity Act, 2003 for the review or order dt. 18.06.2013 in Suo-Motu P. No. 62 of 2012(M). 03/03/2014
Proceeding
Order Passed on
21/04/2014


492 10/2014(M) CSPGCL
V/s
CSPDCL, SLDC & BALCO
Review petition under section 94(f) of the Electricity Act, 2003 for the review or order dt. 16.01.2014 in P. No. 67 of 2013(D). 03/03/2014
Proceeding
Withdraw on 20.03.2014
493 11/2014(M) CSPDCL
V/s
M/s Arasmeta Captive Power company M/s KSK Mahanadi Power Company (p) Ltd. Chhattisgarh State Power trading Company Ltd.
Approval of Power Purchase Agreement for procurment of 75 MW power by Chhattisgarh State Distribution Com. Ltd. from ACPCPL 03/03/2014
Proceeding
Enclosure
07/05/2014


Order Passed on
07/05/2014


494 12/2014 M/s. Jindal Steel & Power Ltd. (Distribution License Business)

Petition for determination of tariff for FY 201-15 along with revised estimate of Multi Year Annual Revenue Requirement for the licensed Distribution business for the control Period from FY 2013-14 to 2015-16 & true up of ARR for FY 2012-13. 10/03/2014
Proceeding
Order Passed on
23/12/2014


495 13/2014(M) CSPTCL (Business Plan)

Approval of additional capital investment plan for the control period from FY 2013-14 to 2015-16. 20/03/2014
Proceeding
Order Passed on
16/01/2015


496 14/2014 CSPDCL
V/s
CBEDA
Petition under section 86(1)(e) of the Electricity Act, 2003 24/03/2014
Proceeding
Order Passed on
07/01/2015


497 15/2014 Amar Kumar agrawal
V/s
M/s. Mahavir Energy & Coal Beneficiation Ltd.
Restoration of the petition No. 02 of 2014(M) 25/03/2014
Proceeding
Disposed off 29.03.2014
498 16/2014 Prem Chand Bharti
V/s
Executive Engineer, CSPDCL & other
Restoration of the Petition No. 03 of 2014(M) 25/03/2014
Proceeding
Disposed off 29.03.2014
499 17/2014 CSPDCL
V/s
M/s. Vandana Vidhyut Ltd.
Review petition filed by CSPDCL Under Reg. 23 of the CSERC (Conduct of Business) Regulation, 2009. Review order dt. 04.03.2014 in P.No. 10 of 2013(T) 03/04/2014
Proceeding
Order Passed on
19/05/2014


500 18/2014(M) M/s Ind Synergy Ltd.
V/s
CSPTCL
Miscellaneous petition regarding non-compliance of regulation related to State Supply Code-2007 & refund of excess amount collected from the petition (M) 29/04/2014
Proceeding
Order Passed on
06/06/2014


501 19/2014(M) M/s Baldev Alloys Pvt. Ltd.
V/s
CSPDCL
Miscellaneous petition regarding non-compliance of regulation related to State Supply Code-2007 & refund of excess amount collected from the petition (M) 29/04/2014
Proceeding
Order Passed on
11/06/2014


502 20/2014(M) M/sPrakash Industires Limited
V/s
CSPTCL
Miscellaneous petition regarding non-compliance of regulation related to State Supply Code-2007 & refund of excess amount collected from the petition (M) 30/04/2014
Proceeding
Order Passed on
06/06/2014


503 21/2014(M) M/s Vandana Global Limited
V/s
CSPTCL
Miscellaneous petition regarding non-compliance of regulation related to State Supply Code-2007 & refund of excess amount collected from the petition (M) 30/04/2014
Proceeding
Order Passed on
06/06/2014


504 22/2014(M) M/s Salasar Steel & Power Limited
V/s
CSPTCL
Miscellaneous petition regarding non-compliance of regulation related to State Supply Code-2007 & refund of excess amount collected from the petition (M) 06/05/2014
Proceeding
Order Passed on
06/06/2014


505 23/2014(M) M/s Chhattisgarh Investment Limited
V/s
CSPDCL
Petition u/s 142 of the E. A., 2003 for non-compliance of commission's order dated 23.12.2013 in Petition no. 23 & 35 of 2013(D) (M) 08/05/2014
Proceeding
Order Passed on
02/01/2015


Appeal before Tribunal. Order passed on 23-09-2015 Website link
506 24/2014(M) CSPDCL
V/s
M/s Singhal Forestry Limited and another
Petition u/s 86(1)(k) of the removal of difficulty in implementation of the order dated 23.12.2013 in P. No. 23 & 35 of 2013(D) (M) 08/05/2014
Proceeding
Order on admission Passed on
04/06/2014


Order Passed on
02/01/0201


Appeal before Tribunal. Order passed on 23-09-2015 Website link
507 25/2014 M/s. Jindal Steel & Power Ltd. (License Transmission Business)

Petition for determination of tariff for FY 2014-15 day with revised estimates of multi year ARR for the period FY 2013-14 to 2014-16 and true up ARR for FY 2012-13(T) 12/05/2014
Proceeding
Order Passed on
30/12/2014


508 26/2014 M/s MSP Steel & Power Ltd.
V/s
CSPTCL
Petition regarding non-compliance of regulation related to Chhattisgarh State Electricity Supply Code, 2007 refund of excess amount connected from the petitioner. 16/05/2014
Proceeding
Order Passed on
06/06/2014


509 27/2014 Steel Authority of India Ltd., (BSP)

Admittance of Review P.No. 09 of 2014(M) filed dated 24.01.2014, U/s 94(f) for review of or5der passed against the Suo-Motu P.No. 62 of 2012(M) dt. 18.08.2013, 28/05/2014
Proceeding
Order Passed on
17/06/2014


510 28/2014 M/s. R.R. Energy Ltd.
V/s
CSPTCL
Miscellaneous petition regarding non compliance of regulation related to state Supply Code, 2007. Refund of excess amount collected from the petitioner 28/05/2014
Proceeding
Order Passed on
06/06/2014


511 29/2014 Suo Motu 1. CSPDCL, Raipur 2. Collector, Sukma (C.G.)

Regarding Supply of power through Andhra Pradesh Guide to Electrify village Maraiguda, Block Konta, Distt. Sukma (C.G.) 28/05/2014
Proceeding
Order Passed on
08/07/2014


512 30/2014(M) Bhilai Steel Plant (BSP)
V/s
CSPDCL
Permission to supply up to 60 MW of power from it's Captive Power Plant, NSPCL, PP-3 to PRAXAIR India Pvt. Ltd. 04/06/2014
Proceeding
Order Passed on
24/01/2015


513 31/2014(D) M/s S.K.S. Ispat & Power Ltd.
V/s
The Chief Engineer, CSPDCL
Petition u/s 86(1)(f) of the E.A. 2003, to adjudicate upon the dispute between the licensee & generating companies & to refer any dispute for arbitrator. 05/07/2014
Proceeding
Closed
514 32/2014(M) Suo-Motu CSPDCL

Short Term Power Purchase for the Year 204-15 09/07/2014
Proceeding
Order Passed on
09/10/2014


515 33/2014(M) Chhattisgarh State Power Distribution Company Limited

Approval of U/s 86(1)(f) of the Electricity Act, 2003, for short term power purchase of 200 MW round the clock (RTC) power from State CPPs/IPPs during FY 2014-15 11/07/2014
Proceeding
Order Passed on
14/07/2014


516 34/2014 Suo Motu

Determination of generic RE Tariff for FY 2014-15. 18/07/2014
Proceeding
Order Passed on
31/10/2014


Appeal before Tribunal. Order passed on 04-12-2015 Website link
517 35/2014(T) Chhattisgarh State Power Distribution Company Ltd.

Petition u/s 94(i)(f) of the Electricity Act, 2003 for review Tariff Order dated 12.06.2014 for FY 2014-15 passed in petition No. 07 of 2014(T) 08/08/2014
Proceeding
Order Passed on
08/12/2014


Appeal before Tribunal. Order passed on 26-05-2016 Website link
518 36/2014 Suo Motu Respondents CSPGCL CSPDCL CSPTCL & SLDC

Implementation of ABT & DSM billing for power purchase from CSPGCL by CSPDCL 13/08/2014
Proceeding
Order Passed on
29/09/2014


519 37/2014 M/s BALCO
V/s
CSPDCL
Petitio u/s 94(1) (f) of the Electricity Act, 2003 for review of Tariff order dt. 12.06.2014 for FY 2014-15 passed in petition No. 07 of 2014. 28/08/2014
Proceeding
Order Passed on
27/07/2016


Interim Order Passed on
21/10/2014


520 38/2014 CSPDCL
V/s
M/s National Hydro Power Corporation Ltd., (NHPCL)
Petition approval of power purchase agreement exiting between CSPDCL & NHPCL for procurement of power from Hydel Power Plant situated at Subansiri A.P. 28/08/2014
Proceeding
521 39/2014 CSPDCL
V/s
M/s National Thermal Power Corporation Ltd., (NTPC)
Approval of power purchase agreement between CSPDCL & NTPC, Thermal Power Plants. 28/08/2014
Proceeding
522 40/2014 Chhattisgarh State Power Distribution Co. Ltd.

Supplementary capital investment plan for FY 2013-14 to FY 2015-16 30/08/2014
Proceeding
Order Passed on
09/07/2015


523 41/2014 Bharat Aluminium Co. Ltd., (BALCO)
V/s
1. CSPTr.CL 2. State Load Despatch Center (SLDC)
Petition u/s 86(1) (f) of the Electricity Act, 2003, to resolve the dispute regarding planned outage. 17/09/2014
Proceeding
Order Passed on
21/01/2016


524 42/2014 CSPDCL
V/s
Monnet Ispat Energy Ltd., Raipur
Review petition u/s 94 (f) of the E.A. 2003 for review of order dt. 22.08.2014 in suo-motu petition No. 33 of 2013 (M) 17/09/2014
Proceeding
Order Passed on
03/01/2015


525 43/2014 M/s Ind Synergy Ltd.,
V/s
CSPTCL
Petition against arbitrary action by way of pressuring the petitioners by respondent in respect of installation of 132 KV PLCC equipments, whose works here have been completed more than 3.5 years. (M) 26/09/2014
Proceeding
Order Passed on
18/11/2014


Appeal before Tribunal. Order passed on 03-10-2016 Website link
526 44/2014 SLDC
V/s
M/s Aryan Coal Benefication India Ltd., & others
Non compliance of baking down instructions during the FY 2013-14 by intra state user, CPP-IPP generators. 27/09/2014
Proceeding
Order Passed on
03/03/2016


527 45/2014 Chhattisgarh Steel & Power Ltd.
V/s
CSPTCL
Petition against arbitrary action by way of pressuring the petitioner by respondent in respect of installation of 132KV PLCC equipments for their 132 KV bay, completed more than 6 years back. 01/10/2014
Proceeding
Order Passed on
18/11/2014


528 46/2014 M/s. Vandana Global Ltd.
V/s
CSPDCL
Petition U/s. 86/91)(f) of the Electricity Act 2003 07/11/2014
Proceeding
Order Passed on
18/09/2015


529 47/2014 M/s. Salasar Steel & Power Ltd.
V/s
CSPDCL
Petition U/s 86(1)(f) of the Electricity Act 2003 (Backing down instructions) 18/11/2014
Proceeding
Order Passed on
18/09/2015


530 48/2014 M/s. Ultratech Cement Ltd.
V/s
CSPDCL & CSPTCL
Petition U/s 9(i) of the Electricity Act 2003. Approval of laying 132 KV dedicated transmission of power from petitions are two CPPs 18/11/2014
Proceeding
Reject the petition on 04.12.2014
531 49/2014 Chhattisgarh State Power Distribution Co. Ltd.

Approval of dues settlement scheme "Protsahan Yojna" for recovery of out standing dues. 18/11/2014
Proceeding
Order Passed on
29/11/2013


532 50/2014 M/s Chhattisgarh Power Producer Associations
V/s
CSPDCL
Re-determinations of methodology for computation of POC by the distribution license (M) 05/12/2014
Proceeding
Order Passed on
14/09/2015


533 51/2014 M/s IND Synergy Ltd.
V/s
CSPDCL
Miscellaneous petition seeking issuance of direction to the CSPDCL to follow the order dt. 13.10.2009 passed in P. No. 20 of 2009 (M) there by undertake correct calculated of the captive/non captive load for leving POC (M) 08/12/2014
Proceeding
Order Passed on
22/10/2016


534 52/2014 Suo-Motu M/s Ambuja Cements Ltd. Rawan

Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Order Passed on
21/12/2015


535 53/2014 Suo-Motu M/s Alok Ferro Alloys Ltd.

Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Order Passed on
22/09/2015


536 54/2014 Suo-Motu M/s ACC Cement Limited

Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Order Passed on
21/12/2015


537 55/2014 Suo-Motu M/s AGIO Papers

Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Closed the petition on 25.02.2015
538 56/2014 Suo-Motu M/s Bhagwati Power & Steel Ltd.

Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Order Passed on
20/10/2015


539 57/2014 Suo -Motu M/s Bharat Aluminium Co. Ltd.

Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Order Passed on
20/10/2015


540 58/2014 Suo-Motu M/s Bhilai Steel Plant

Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Order Passed on
16/10/2015


541 59/2014 Suo-Motu

M/s Bhoramdeo Shakari Shakkar Utpadak Karkhana
Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Closed on 25.02.2015
542 60/2014 Suo-Motu M/s Century Cement, Baikunth

Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Order Passed on
16/10/2015


543 61/2014 Suo-Motu

M/s Crest Steels & Power Pvt. Ltd.
Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Order Passed on
16/10/2015


544 62/2014 Suo-Motu M/s Drolia Electrosteels (P) Ltd.

Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Order Passed on
15/10/2015


545 63/2014 Suo-Motu M/s Godawari Power & Ispat Ltd.

Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Order Passed on
22/09/2015


546 64/2014 Suo-Motu M/s GR Sponge & Power Ltd.

Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Order Passed on
15/10/2015


547 65/2014 Suo-Motu

M/s Hira Power & Steels Ltd.
Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Order Passed on
22/09/2015


548 66/2014 Suo-Motu M/s Hira Ferro Alloys Ltd.

Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Order Passed on
22/09/2015


549 67/2014 Suo-Motu M/s INDSIL Energy & Electrochemicals Ltd.

Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Order Passed on
20/10/2015


550 68/2014 Suo-Motu M/s Jagdamba Power & Alloys Pvt. Ltd.

Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Order Passed on
22/09/2015


551 69/2014 Suo-Motu M/s Jayswal Neco Industries Ltd.

Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Order Passed on
15/10/2015


552 70/2014 Suo-Motu M/s Hi-Tech Power & Steel Ltd.

Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Order Passed on
15/10/2015


553 71/2014 Suo-Motu M/s JIndal Steel & Power Ltd.

Non compliance of RPO by the respondent for the year 2012-13 30/12/2014
Proceeding
Order Passed on
15/10/2015


554 72/2014 Suo-Motu M/s Lafarge India (P) Ltd. Aresmata Cement Plant

Non compliance of RPO by the respondent for the year 2012-13 31/12/2014
Proceeding
Order Passed on
16/10/2015


555 73/2014 Suo-Motu M/s Lafarge India (P) Ltd. Sonadih Cement Plantj

Non compliance of RPO by the respondent for the year 2012-13 31/12/2014
Proceeding
Order Passed on
16/10/2015


556 74/2014 Suo-Motu M/s Maa Kali Alloys Udyog (P) Ltd.

Non compliance of RPO by the respondent for the year 2012-13 31/12/2014
Proceeding
Order Passed on
20/10/2015


557 75/2014 Suo-Motu M/s Madhya Bharat Papers Ltd.

Non compliance of RPO by the respondent for the year 2012-13 31/12/2014
Proceeding
Order Passed on
22/09/2015


558 76/2014 Suo-Motu M/s Mahendra Sponge & Power Ltd.

Non compliance of RPO by the respondent for the year 2012-13 31/12/2014
Proceeding
Order Passed on
15/10/2015


559 77/2014 Suo-Motu M/s Rameshwaram Steel & Power Ltd.

Non compliance of RPO by the respondent for the year 2012-13 31/12/2014
Proceeding
Order Passed on
16/10/2015


560 78/2014 Suo-Motu M/s Rashmi Sponge Iron & Power Ltd.

Non compliance of RPO by the respondent for the year 2012-13 31/12/2014
Proceeding
Order Passed on
20/10/2015


561 79/2014 Suo-Motu M/s Sarda Energy & Minerals Ltd.

Non compliance of RPO by the respondent for the year 2012-13. 31/12/2014
Proceeding
Order Passed on
15/10/2015


562 80/2014 Suo-Motu M/s Shree Nakoda Ispat Ltd.

Non compliance of RPO by the respondent for the year 2012-13 31/12/2014
Proceeding
Order Passed on
15/10/2015


563 81/2014 Suo-Motu M/s Shri Bajrang Power & Ispat Ltd. Unit -I

Non compliance of RPO by the respondent for the year 2012-13 31/12/2014
Proceeding
Order Passed on
15/10/2015


564 82/2014 Suo-Motu M/s Shri Bajrang Power & Ispat Ltd. Unit -II

Non compliance of RPO by the respondent for the year 2012-13 31/12/2014
Proceeding
Order Passed on
20/10/2015


565 83/2014 Suo-Motu M/s SKS Ispat & Power Ltd.

Non compliance of RPO by the respondent for the year 2012-13 31/12/2014
Proceeding
Order Passed on
15/10/2015


566 84/2014 Suo-Motu M/s SK Sarawagi & Co. (P) Ltd

Non compliance of RPO by the respondent for the year 2012-13 31/12/2014
Proceeding
Order Passed on
15/10/2015


567 85/2014 Suo-Motu M/s Topworth Steels & Power Pvt. Ltd.

Non compliance of RPO by the respondent for the year 2012-13 . 31/12/2014
Proceeding
Order Passed on
20/10/2015


568 86/2014 Suo-Motu M/s Ultratech Cement Ltd., Rawan

Non compliance of RPO by the respondent for the year 2012-13 31/12/2014
Proceeding
Order Passed on
16/10/2015


569 87/2014 Suo-Motu M/s Ultratech Cement Ltd., Hirmi

31/12/2014
Proceeding
Order Passed on
21/12/2015


570 88/2014 Suo-Motu M/s Uniworth Limited

Non compliance of RPO by the respondent for the year 2012-13 31/12/2014
Proceeding
Order Passed on
20/10/2015


571 89/2014 Suo-Motu M/s Vandana Global Ltd.

Non compliance of RPO by the respondent for the year 2012-13 31/12/2014
Proceeding
Order Passed on
15/10/2015


572 90/2014 Suo-Motu M/s Salasar Steel & Power Ltd.

Non compliance of RPO by the respondent for the year 2012-13 31/12/2014
Proceeding
Order Passed on
15/10/2015


573 91/2014 Suo-Motu M/s Real Ispat & Power Ltd.

Non compliance of RPO by the respondent for the year 2012-13 31/12/2014
Proceeding
Order Passed on
15/10/2015


574 01/2015 Chhattisgarh State Power Distribution Co. Ltd. (CSPDCL)

Petition for approval of CSPDCL provisional true up FY 2013-14 revised ARR FY 2015-16 (T) 01/01/2015
Proceeding
Order Passed on
23/05/2015


575 02/2015 Chhattisgarh State Power Transmission Co. Ltd. (CSPTCL)

Petition for final true up for FY 2013-14 along with determination of T.T. for FY 2015-16 01/01/2015
Proceeding
Order Passed on
23/05/2015


576 03/2015 Chhattisgarh State Power Generation Co. Ltd. (CSPGCL)

Petition for approval of true up of Tthermal Hydro Power Plants for FY 2013-14 and ARR FY 2015-16 of 1x500 MW Korba West T.P.P. 01/01/2015
Proceeding
Order Passed on
23/05/2015


577 04/2015 Chhattisgarh State Load Despatch Center (SLDC)

Petition for the true up of FY 2013-14, provisional true up FY 2014-15 and ARR for FY 2015-16 of SLDC (T) 01/01/2015
Proceeding
Order Passed on
23/05/2015


578 05/2015 Suo-Motu M/s Bhilai Steel Plant (BSP-TEED)

Revision of ARR for FY 2015-16 and determination of retail tariff for FY 2015-16 02/01/2015
Proceeding
Order Passed on
24/02/2016


579 06/2015 M/s Arasmeta Captive Power Company Ltd.
V/s
CSPDCL
Clarification on methodology for computation of charges and additionall charges for deviation from the scheduled injection/drawl of power and to restrain the respondent 07/01/2015
Proceeding
Order Passed on
07/05/2015


Appeal before Tribunal. Order passed on 05-12-2016 Website link
580 07/2015 M/s Jindal Steel & Power Ltd.,
V/s
M/s Raigarh Ispat Udyog Sangh
Review P.No. 12/14 (T) order dt. 23.12.2014 22/01/2015
Proceeding
Order Passed on
01/10/2015


581 08/2015 Chhattisgarh State Power Generation Co. Ltd. (CSPGCL)

Pettion for approval of revised capital cost for the 1x500 MW Korba West TPP (M) 04/02/2015
Proceeding
Order Passed on
22/09/2015


582 09/2015 Suo-Motu

Chhattisgarh State Power Distribution Co. Ltd. (CSPDCL)
Initiations of proceeding U/s 142 of the Electricity Act, 2003 for non compliance of Commission's order dt. 23.12.2013 for P.No. 23 & 35/2013 (D) 05/02/2015
Proceeding
Dispose off
583 10/2015 Suo-Motu Chhattisgarh State Power Distribution Co. Ltd. (CSPDCL)

Initiations of proceeding U/s 142 of the Electricity Act, 2003 for non compliance of directive of the Commission and provisional of MYT Regulation 2012 (M) 05/02/2015
Proceeding
Dispose off
584 11/2015 Suo-Motu CSPDCL, Jagadalpur

142 of the Electricity Act, 2003 for non compliance of order dtd. 22.01.2015 (M) 11/02/2015
Proceeding
Order Passed on
23/10/2015


585 12/2015 CSPDCL

Petition for revision of miscellaneous and general charges (M) 09/02/2015
Proceeding
Order Passed on
26/08/2015


586 13/2015 CSPDCL
V/s
1. M/s Vipul Vidyut Pvt. Ltd., 2. M/s ACME Raipur Solar Power Pvt. Ltd. 3. M/s Sarthak Energies Pvt. Ltd. 4. M/s Azure Power India Pvt. Ltd., 5. M/s Amrensys Technologies Pvt. Ltd.
petition for approval of PPA signed between CSPDCL and various Solar Power Projects towards the procurement of Renewable Solar Power by CSPDCL from it's proposal solar Power Plants in CG State 19/02/2015
Proceeding
Order Passed on
25/10/2017


587 14/2015 Suo-Motu

Short term power purchase for the year 2015-16 25/03/2015
Proceeding
Order Passed on
14/07/2015


588 15/2015 Suo-Motu

Approval of standard draft PPA for short term power purchase for the year FY 2015-16 25/03/2015
Proceeding
Order Passed on
19/08/2015


589 16/2015 M/s Confedaration of Real Estate Developers Association (CREDAIS)
V/s
Chhattisgarh State Power Distribution Co.Ltd.
Petition under section 142 & 149 of 2003, regarding non-compliance of Regulations despite specific orders issued by the Commission's in P.N. 17 of 2013 01/04/2015
Proceeding
Withdraw on 21.05.2015
590 17/2015 M/s Vandana Vidhyut Ltd.
V/s
CSPDCL
Petition under section (i) (f) to the Electricity Act, 2003 to direct the respondent to pay "delayed payment surcharge" as per the provision of the PPA for the PPA forther delays in release of the power purchase bill (D) 24/04/2015
Proceeding
Order Passed on
04/09/2015


Appeal before Tribunal. Order passed on 25-01-2017 Website link
591 18/2015 M/s IND Synergy Ltd.
V/s
CSPDCL
Petition under section 86(i) (f) of the Electricity Act, 2003 read with section 56 of the Electricity Act, 2003 regarding dispute on billing of parallel operating charges (POC) (D) 29/04/2015
Proceeding
Order Passed on
02/05/2016


592 19/2015 M/s Indra Powergen Pvt. Ltd.
V/s
CSPDCL
Petition under section 86(i) (f) of the Electricity Act, 2003 in the matter of delayed payment surcharge & amendment in PPA (D) 29/04/2015
Proceeding
Order Passed on
06/06/2016


593 20/2015 M/s Mahaveer Energy Coal Benefication Ltd.
V/s
CSPDCL
Petition under section 86(i) (f) of the Electricity Act, 2003 in the matter of delayed payment surcharge & amendment in PPA (D) 29/04/2015
Proceeding
Order Passed on
06/06/2016


594 21/2015 M/s Sudha Power Pvt. Ltd.
V/s
CSPDCL
Petition under section 86(i) (f) of the Electricity Act, 2003 in the matter of delayed payment surcharge & amendment in PPA (D) 29/04/2015
Proceeding
Order Passed on
06/06/2016


595 22/2015 M/s Real Ispat & Pvt. Ltd.,
V/s
CSPDCL
Petition under section 86(i) (f) of the Electricity Act, 2003 in the matter of delayed payment surcharge & amendment in PPA (D) 29/04/2015
Proceeding
Order Passed on
06/06/2016


596 23/2015 M/s Neeraj Power Pvt. Ltd.
V/s
CSPDCL
Petition under section 86(i) (f) of the Electricity Act, 2003 in the matter of delayed payment surcharge & amendment in PPA (D) 29/04/2015
Proceeding
Order Passed on
06/06/2016


597 24/2015 M/s Balaji Power (M/s Hira Ferro Alloys)
V/s
CSPDCL
Petition under section 86(i) (f) of the Electricity Act, 2003 in the matter of delayed payment surcharge & amendment in PPA (D) 29/04/2015
Proceeding
Order Passed on
06/06/2016


598 25/2015 M/s Rukmani Power Steel Ltd.
V/s
CSPDCL
Petition under section 86(i) (f) of the Electricity Act, 2003 in the matter of delayed payment surcharge & amendment in PPA (D) 29/04/2015
Proceeding
Order Passed on
06/06/2016


599 26/2015 CG Load Despatch Centre (SLDC)
V/s
M/s Arasmeta Captive Power Pvt. Ltd. & 18 others parties.
Petition under section 29,33 & 142 of the Electricity Act, 2003 read with clause 6(2) of the DSM Regulation 2014 against repeated contravention of different provision of various regulation by open access customer during the period 17.02.2014 to 28.12.2014 (M) 13/05/2015
Proceeding
Order Passed on
21/06/2016


Order Passed on 03.12.2015
03/12/2015


Order Passed on
07/09/2015


600 27/2015 Suo-Motu M/s Salasar Steel & Power Ltd.

In the matter of generating and consumption of power plant in the state for the FY 2013-14 (M) 18/05/2015
Proceeding
Order Passed on
08/09/2015


Appeal before Tribunal. Order passed on 08-11-2016 Website link
601 28/2015 Suo-Motu M/s ACB (I) Lt.

In the matter of generating and consumption of power plant in the state for the FY 2013-14 (M) 18/05/2015
Proceeding
Order Passed on
08/09/2015


602 29/2015 Suo-Motu M/s API Ispat & Powertech Pvt. Ltd.

In the matter of generating and consumption of power plant in the state for the FY 2013-14 (M) 18/05/2015
Proceeding
Order Passed on
08/09/2015


603 30/2015 Suo-Motu M/s Bhagwati Power & Steel Ltd.

In the matter of generating and consumption of power plant in the state for the FY 2013-14 (M) 18/05/2015
Proceeding
Order Passed on
08/09/2015


604 31/2015 Suo-Motu M/s Monnet Ispat & Energy Ltd.

In the matter of generating and consumption of power plant in the state for the FY 2013-14 (M) 18/05/2015
Proceeding
Order Passed on
23/09/2015


605 32/2015 Suo-Motu M/s Jai Balaji Industris Ltd.

In the matter of generating and consumption of power plant in the state for the FY 2013-14 (M) 18/05/2015
Proceeding
Order Passed on
08/09/2015


606 33/2015 Suo-Motu M/s Arasmeta Captive Power Co. Pvt. Ltd.

In the matter of generating and consumption of power plant in the state for the FY 2013-14 (M) 18/05/2015
Proceeding
Order Passed on
08/09/2015


607 34/2015 Suo-Motu M/s Rameshwaram Steel & Power Pvt. Ltd.

In the matter of generating and consumption of power plant in the state for the FY 2013-14 (M) 18/05/2015
Proceeding
Order Passed on
23/09/2015


608 35/2015 M/s Agrawal Vidhyut
V/s
CSPDCL
Petition under section 86 (i) (f) of the Electricity Act, 2003 in the matter of delayed payment surcharge & amendment in PPA (D) 19/05/2015
Proceeding
Order Passed on
06/06/2016


Order passed on
10/05/2015


609 36/2015 M/s. S.K.S. Ispat & Power Ltd.
V/s
CSPDCL
Billing of Power Factor Surcharge under the Tariff Orders for FY 2012-13, 2013-14 & 2014-15 to a captive Power Plant with Zero Demand. 28/05/2015
Proceeding
Order Passed on
01/09/2016


610 37/2015 Suo-Motu

In the matter of amendment in the order dt. 29.05.2012 in Suo-Motu P.N. 26 of 2012 on fuel cost and variable cost adjustment mechanism (M) 01/06/2015
Proceeding
Order Passed on
29/06/2015


611 38/2015 M/s. Salasar Steel & Power Ltd.
V/s
CSPDCL
Petition U/s. 86(1)(f) of the electricity Act, 2003 (D) 08/06/2015
Proceeding
Order Passed on
11/01/2016


612 39/2015 M/s. Real Ispat & Power Ltd.
V/s
CSPTCL & SLDC
Petition U/s. 86(1)(f) of the electricity Act, 2003 (D) 09/06/2015
Proceeding
Order Passed on
06/05/2016


613 40/2015 M/s. Salasar Steel & Power Ltd.
V/s
CSPTCL & SLDC
Petition U/s. 86(1)(f) of the electricity Act, 2003 (D) 09/06/2015
Proceeding
Order Passed on
06/05/2016


614 41/2015 Suo-Motu CSPDCL JSPL CREDA

In the matter of RPO for the year FY 2013-14 25/06/2015
Proceeding
Order Passed on
16/06/2016


615 42/2015 M/s Chhattisgarh Mini Steel Plant Association
V/s
CSPDCL
Review of the Tariff order dt. 23.05.2015 passed in Petition No. 01 of 2015(T), U/s. 94(i)(f) of the Electricity Act, 2003(M) 26/06/2015
Proceeding
Order Passed on
11/09/2015


616 43/2015 M/s. Reshma Gulabani
V/s
i) CSPTCL, Raipur ii) E.E. CSPTCL, Janjgir, Champa iii) State of Chhattisgarh iv) Collector, Janjgir Champa
Revision under Rule 3(3) of works of Licensees Rules, 2006 15/07/2015
Proceeding
Order Passed on
17/06/2016


617 44/2015 M/s. Green Energy Associations.
V/s
i) CSPDCL ii) BSP iii) JSPL & iv) CREDA
Non compliance of solar RPO for the years. 2013-14 & 2014-15 by the obligated entities. 15/07/2015
Proceeding
Order Passed on
21/12/2015


618 45/2015 M/s. Balaji Power (A unit of Hira Ferro Alloys Ltd.)
V/s
i) CREDA ii) CSPDCL
Miscellaneous petition to quash the directive given by the Commission and other related relief. 20/07/2015
Proceeding
Order Passed on
20/09/2016


619 46/2015 M/s. Prakash Industries Ltd.
V/s
CSPTCL
Petition U/s 86(i)(f) of the Electricity Act 2003, regarding dispute of excess amount collected by the respondent against to work of construction of 132KV bays. 25/07/2015
Proceeding
Order Passed on
21/01/2016


620 47/2015 M/s. Jindal Steel & Power Ltd. (JSPL), Raigarh.

Petition for determination of cost of power generation for Dongamahua CPP of JSPL from FY 2011-12 till FY 2015-16 05/07/2015
Proceeding
Order Passed on
21/01/2016


Order Passed on
27/08/2015


621 48/2015 M/s. Jindal Steel & Power Ltd., Raigarh

Application U/regulation. 75, 77 & 78 of the CSERC Tariff Regulation, 2012. Seeking exemption and/or adopting procedure in conformity with the Electricity Act, 2003 in exercise of its power to relax the norms. 05/08/2015
Proceeding
Order Passed on
27/08/2015


622 49/2015 Chhattisgarh State Power Generation Co. Lt. (CSPGCL)

Review of order dated 23.05.2015 passed in P. No. 03/2015(T), by the Commission in respect of Tariff of the petitioner. 11/08/2015
Proceeding
Order Passed on
26/03/2016


623 50/2015 Chhatttisgarh State Power Transmission Co. Ltd. (CSPTCL)

Review of order dated 23.05.2015 passed in P.No. 02 of 2015. 13/08/2015
Proceeding
Order Passed on
05/02/2016


624 51/2015 M/s. C.G. Steel Re-rollers Association.
V/s
CSPDCL
Review Petitions with respect to tariff order 2015-16 dated 23.05.2015 passed in P.No. 01/2015(T) U/s 94(1)(f) of the Electricity Act 2003 14/08/2015
Proceeding
Order Passed on 06.10.2016
06/10/2016


Order Passed on
12/01/2016


625 52/2015 M/s Salasar Steel & Power Ltd.,
V/s
CSPDCL
Petition U/s. 86(1)(f) of the electricity Act, 2003 (D) (for delay payment surcharge) 21/08/2015
Proceeding
Order Passed on
06/06/2016


626 53/2015 M/s Real Power Pvt. Ltd.,
V/s
CSPDCL & another
Petition U/s. 86(1)(f) of the electricity Act, 2003 (D) (exemption of demand charge for start up power for biomass generation) 21/08/2015
Proceeding
Order Passed on
27/07/2016


627 54/2015 M/s Raigarh Ispat Udyog Sangh
V/s
M/s Jindal Steel & Power Lrd.
Non-compliance of order passed by the Commission in P.No. 38 of 2012 on dtd. 07.05.2012(M) 21/08/2015
Proceeding
Dispose Off
628 55/2015 Naya Raipur Development Authority
V/s
CSPDCL
Not to levy system strenthining charges and permision for installation of higher capacity distribution transformer of 11/0.4 KV upto 2500KVA. 11/08/2015
Proceeding
Order Passed on
07/10/2016


629 56/2015 Suo-Motu

Discussion paper on determination methodology for computation of POV 11/09/2015
Proceeding
Order Passed on
30/04/2016


630 57/2015 M/s Godawari Power & Ispat Ltd.
V/s
CSPDCL
Petition under section 86 (i)(f) of Electricity Act, 2003. for delayed payment surcharge) 15/09/2015
Proceeding
Order Passed on
06/06/2016


631 58/2015 Suo-Motu M/s Ambuja Cement Ltd. Rawan

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
02/09/2016


632 59/2015 Suo-Motu M/s ACC Limited

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
02/09/2016


633 60/2015 Suo-Motu M/s Bharat Aluminium Company Ltd. (Vedanta)

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
04/04/2016


634 61/2015 Suo-Motu M/s Bhilai Steel Plant

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
02/09/2016


635 62/2015 Suo-Motu M/s Century Cement, Baikhunth

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
02/09/2016


636 63/2015 Suo-Motu M/s Crest Steels & Power Pvt. Ltd.

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
18/10/2016


637 64/2015 Suo-Motu M/s Drolia Electro Steels (P) Ltd.

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
02/09/2016


638 65/2015 Suo-Motu M/s Godawari Power & Ispat Ltd

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
02/09/2016


639 66/2015 Suo-Motu M/s GR Sponge & Power Ltd.

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
02/09/2016


640 67/2015 Suo-Motu M/s INDSIL Energy & Electrochemicals Ltd.

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
22/02/2017


641 68/2015 Suo-Motu M/s Lafarge India (P) Ltd. Aresmata Cement Plant

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
642 69/2015 Suo-Motu M/s Lafarge India (P) Ltd. Sonadih Cement Plant

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
18/10/2016


643 70/2015 Suo-Motu M/s Maa Kali Alloys Udyog (P) Ltd.

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
28/08/2017


644 71/2015 Suo-Motu M/s Madhya Bharat Papers Ltd.

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
02/09/2016


645 72/2015 Suo-Motu M/s Mahendra Sponge and Power Ltd.

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
02/09/2016


646 73/2015 Suo-Motu M/s Sarda Energy & Minerals Ltd.

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
02/09/2016


647 74/2015 Suo-Motu M/s Sarda Energy & Minerals Ltd.

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
22/02/2017


648 75/2015 Suo-Motu M/s Shree Nakoda Ispat Ltd.

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
02/09/2016


649 76/2015 Suo-Motu M/s Shri Bajrang Power & Ispat Ltd. Unit-I

24/09/2015
Proceeding
Order Passed on
09/09/2016


650 77/2015 Suo-Motu M/s Shri Bajrang Power & Ispat Ltd. Unit-II

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
09/09/2016


651 78/2015 Suo-Motu M/s SKS Ispat & Power Ltd.

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
02/09/2016


652 79/2015 Suo-Motu M/s Topwarth Steels & Power Pvt. Ltd.

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
18/10/2016


653 80/2015 Suo-Motu M/s Ultratech Cement Ltd. Rawan Cement Work

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
02/09/2016


654 81/2015 Suo-Motu M/s Ultratech Cement Ltd. Hirmi Cement Work

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
02/09/2016


655 82/2015 Suo-Motu M/s Uniworth Ltd.

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
22/02/2017


656 83/2015 Suo-Motu M/s Vandana Global Ltd.

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
18/10/2016


657 84/2015 Suo-Motu M/s Raipur Power & Steel Ltd.

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
02/09/2016


658 85/2015 Suo-Motu M/s Baldev Alloys Pvt. Ltd.

Non-compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
20/09/2016


659 86/2015 Suo-motu M/s Sky Alloys Power Pvt. Ltd.

Non compliance of RPO by the respondent for the year 2013-14 24/09/2015
Proceeding
Order Passed on
22/02/2017


660 87/2015 The SE, CSPDCL, Nayapara, Raipur
V/s
M/s R.C.P. Infotech Pvt. Ltd., Raipur
Modalities for supply of electricity to respondent regarding supply of power to multi consumer complete housing colony more than 10,000 KW 23/10/2015
Proceeding
661 88/2015 The SE CSPDCL
V/s
RDA
The respondent RDA for town development scheme no. 4 Kamal Vihar regarding supply to multi consumer complex & housing colony more than 10,000 KW. 23/10/2015
Proceeding
Order Passed on
25/10/2016


662 89/2015 Suo-Motu (i) CREDA (ii) CSPDCL (iii) SLDC

In the matter of report by ERC empanelled compliance auditor regarding the clarification w.r.t. false registration of capacity & claring RFCS for the same by M/s Godawari Power & Ispat Ltd. under mechanism (M) 27/10/2015
Proceeding
Order Passed on
25/10/2016


663 90/2015 (M) Suo-Motu

M/s Kalindi Power & Steel Ltd. -Respondent
Infringement of fuels Mix Ratio for biomass plant 03/11/2015
Proceeding
Order Passed on
04/03/2016


664 91/2015 Shri Arun Kumar Bose
V/s
(i) EE CSPDCL (ii) AE, CSPDCL at Bilaspur
Complaint under section 142 & 146 of the CP Act 2003 for non- compliance of order dt. 11.03.2015 passed by electricity Ombudsman in case no. 06 of 2014 07/11/2015
Proceeding
Dispose off
665 92/2015 Shri Nakoda Ispat Ltd.
V/s
CSPDCL
Petition u/s 86(i) (e) of the Electricity Act, 2003 for appropriate direction to respondent to process application made by the petitioner for construction of a dedicated feeder. 24/11/2015
Proceeding
Order Passed on
30/01/2017


666 93/2015 CSPDCL
V/s
M/s Salasar Steel & Power Ltd.
Review petition with respect of order dt. 18.09.2015 in P. No. 470 of 2014 (D) under section 94 (i) (f) of the Electricity Act, 2003. 27/11/2015
Proceeding
Order Passed on
06/05/2016


Order Passed on
06/05/2016


667 94/2015 CSPDCL
V/s
M/s Vandana Global Ltd.
Review petition with respect of order dt. 18.09.2015 in P.No. 46/14 (D) V/s 94(i) (f) of the Electricity Act, 2003 27/11/2015
Proceeding
Order Passed on
06/05/2016


668 95/2015 Chhattisgarh State Power Distribution Co. Ltd.

Petition for approval of settlement scheme "Protsahan Yojna 2005" for recovery of outstanding due against inactive Law Tension cusumes of the CSPDCL 02/12/2015
Proceeding
Approval on 02.12.2015
669 96/2015 M/s Rashmi Sponge Iron & Power Industrial Ltd.

Review petition with respect to order dt. 20.10.2015 passed in P.No. 78/14 (M) under section 94(i) (f) of the Electricity Act, 2003 02/12/2015
Proceeding
Dismissed
670 97/2015 M/s Bhagwati Power & Steel Ltd.

Review petition with respect to order dt. 20.10.2015 passed in P.No. 56 of 2014 (M) under section 94(i) (f) of the Electricity Act, 2003 02/12/2015
Proceeding
Order Passed on
29/03/2016


671 98/2015 M/s Bajrang Power & Ispat Ltd. (TMT Division)
V/s
CREDA
Review petition with respect to order dt. 20.10.2015 passed in suo-motu P.No. 82 of 2015 (M) 09/12/2015
Proceeding
Order Passed on
01/09/2016


672 99/2015 M/s SKS Ispat & Power Ltd.
V/s
CSPDCL
Petition u/s 86(i) (f) of the Electricity Act, 2003 for recovery of delayed payments surcharge for power sold between the period from August 2011 to May 2015 (D) 11/12/2015
Proceeding
Order passed on
13/01/2017


Order Passed on
19/09/2016


Order Passed on
12/01/2016


673 100/2015 CSPDCL (CIP)

Approval of Capital Investment Plan for the control period from 2016-17 to 2020-21 (M) 16/11/2015
Proceeding
Order Passed on
26/03/2016


674 101/2015 CSPTCL (CIP)

Approval of Capital Investment Plan for the control period from 2016-17 to 2020-21 (M) 16/11/2015
Proceeding
Order Passed on
26/03/2016


675 102/2015 SLDC (CIP)

Approval of Capital Investment Plan for the control period from 2016-17 to 2020-21 (M) 16/11/2015
Proceeding
Order Passed on
28/03/2016


676 01/2016 CSPDCL

Petition for approval of provision true up F.Y. 2015, determination of ARR for MYT Control Period (FY 2016-17 to 2020-2021) & determination is of Tariff for FY 2017 and Seething 62 & 64 o the electricity Act. 2003 (T) 01/01/2016
Proceeding
Tariff schedule
30/04/2016


Order passed on
30/04/2016


677 02/2016 CSPTCL

Petition for Provisional True up for F.Y. 2015, Musty Year Tariff for 3rd MYT Control Period (F.Y. 2016-17 to 2020-21) & determine of Transmission Tariff F.Y. 2016-17 (T) 01/01/2016
Proceeding
Order passed on
30/04/2016


678 03/2016 CSPGCL

Petition for Provisional True up of ARR of Conventional Thermal & Hydro Power Plants for F.Y. 2014-15, Final true up of 1*500 MO Korba West TPP for F.Y. 2013-14 & MYT Petition for F.Y. 2016-17 to 2020-21 (T) 01/01/2016
Proceeding
Order passed on
30/04/2016


679 04/2016 SLDC (CSPTCL)

Petition for Provisional True up ARR of F.Y. 2014-15 & MYT ARR for 2016-17 to 2020-21 (T) 01/01/2016
Proceeding
Order passed on
30/04/2016


680 05/2016 CSPGCL

Approval of Capital Investment Plan for the Control Period from F.Y. 2016-17 to 2020-21 (CIP) 01/01/2016
Proceeding
Order passed on
16/03/2016


681 06/2016 M/s J.K. Lakshmi Cement Ltd.
V/s
CSPDCL
Petition v/s 142 of the E.A. 2003, Regarding non compliance of the Provision of C.G. State Supply Code, 2011 (M) 04/01/2016
Proceeding
Order passed on
29/03/2016


682 07/2016 M/s Shri Cement Limited
V/s
CSPDCL
Petition under Regulative 13.21 of the C.G. State Supply Code- 2011 for removal of difficulty in the matter of calculative of interest on the Security Deposite lying with CSPDCL (M) 04/01/2016
Proceeding
Order Passed on
17/06/2016


683 08/2016 M/s C.G. Steel Re-roller Association
V/s
CSPDCL
Petition for implementation of the various Tariff order for F.Y. 2012-13, 2014-15 & 2015-16 & segregation of voltage wise and consumer category wise actual cost of supply (M) 13/01/2016
Proceeding
Order passed on
16/11/2017


684 09/2016 M/s Vandana Global Ltd.
V/s
CSPDCL
Petition v/s 86 (i) (f) of the E.A. 2003. Delayed Payment Surcharge (DPS) (D) 09/02/2016
Proceeding
Order Passed on
03/10/2016


685 10/2016 Suo-Motu

1- CSPDCL 2- JSPL 3- CREDA, Nodal Agency
Non-Compliances of RPO for the F.Y. 2014-15 (m) (File No. 89-Compliance RPO -2014 17/02/2016
Proceeding
Order passed on
01/03/2018


Order passed on locus-standi on
17/05/2017


686 11/2016 M/s Vandana Vidyut Ltd.
V/s
CSPDCL
Petition 1586 (i) (f) of the E.A. 2003 to recover late payment surcharge from the respondent CSPDCL for the period between January 2013 to September 2015 as per the PPA (D) 01/03/2016
Proceeding
Order passed on
03/10/2016


687 12/2016 सुर्यकान्‍त गुप्‍ता, प्रोपाईटर मेसर्स राजाराम प्रोडक्‍शन
V/s
प्रबंध निदेशक, छ रा वि वितरण कंपनी लिमि एवं प्रबंध निदेशक, छ रा वि पारेषण कं
आवेदन पत्र अंतर्गत धारा 86 (1) (K) विद्युत अधिनियम 2003 के अंतर्गत याचिका 01/03/2016
Proceeding
Order Passed on
20/07/2016


688 13/2016 M/s Ultratech Cement Limited
V/s
CREDA
Petition v/s 86 (i) (e) of the E.A. 2003, for appropriate directions to CREDA for the Combined RPO of both Plants of the petition belling unit of a Single legal entity but located in two ditteral Places in C.G. (M) 02/03/2016
Proceeding
Order Passed on
28/07/2016


689 14/2016 M/s API Ispat & Power tech (P) Ltd.
V/s
CSPDCL
Petition v/s 86 (i) (f) of the E.A. 2003 Seeking a direction from the Commission to Set aside the supplementary Bill Dt. 20/11/2015, Where by the responded has received CSS at Full rate for the Year 2013-14 (D) 15/03/2016
Proceeding
Order Passed on
30/06/2016


690 15/2016 M/s ACME Raipur Solar Power Pvt. Ltd.
V/s
CSPDCL
Petition U/s 86(1)(e) of the E.A. 2003, and clause 13.21 of the Chhattisgarh State Electricity Supply Code, 2011 30/03/2016
Proceeding
Order Passed on
07/10/2016


691 16/2016(M) AZURE Power India Pvt. Ltd.
V/s
Chhattisgarh State Power Distribution Co.Ltd., Raipur
Petition U/s 86(1)(e) of the E.A. 2003, and clause 13.21 of the Chhattisgarh State Electricity Supply Code, 2011 30/03/2016
Proceeding
Order passed on
07/10/2016


692 17/2016 Chhattisgarh State Power Generation Co. Ltd.

Peition for approval of provisional tariff for 2X500 MW Marwa Thermal Power Projects 31/03/2016
Proceeding
Petition returned to petitioner
693 18/2016 M/s. JSPL
V/s
Raigarh Ispat Udyog Sangh
Caveat Petition 02/04/2016
Proceeding
Disposed off on
26/09/2016

694 19/2016 M/s. JSPL
V/s
M/s. Epic Alloys Steel Pvt. Ltd. and others
Caveat Petition 02/04/2016
Proceeding
Disposed off on
26/09/2016

695 20/2016 CSPDCL (PPA)

Petition for approval of back to back long terms power purchase agreement between CSPDCL & CSPTrCL for Procurement of 467.5 MW concessional power 04/04/2016
Proceeding
Order passed on
01/12/2017


696 21/2016 CSPDCL (PPA)

Approval of draft power purchase agreement u/s 86(1)(f) of the E.A. , 2003 for purchase of RE power from Biomass based generators under competitive bidding process executed between CSPDCL and Biomass Projects developers. 07/04/2016
Proceeding
697 22/2016(M) Suo-Motu

RE Tariff 13/04/2016
Proceeding
Annexure
06/06/2016


Order Passed on
06/06/2016


698 23/2016 M/s Monnet Ispat & Energy Limited

Petition under regulation 44 of the CSERC (Conduct of Business) Regulations, 2009, seeking exemption from RPO to the extent of consuming power form co-generation plant. 25/04/2016
Proceeding
Order Passed on
22/10/2016


699 24/2016 M/s Rameshwaram Steel & Power Limited

Petition under regulation 44 of the CSERC (Conduct of Business) Regulations, 2009, seeking exemption from RPO to the extent of consuming power form co-generation plant. 25/04/2016
Proceeding
Order Passed on
22/10/2016


700 25/2016 CSPDCL (PPA)

Approval of draft power purchase agreement u/s 86(1)(f) of the E.A. , 2003 for purchase of RE power from Small Hydel Projects executed between CSPDCL and Small Hydel Projects developers. 25/04/2016
Proceeding
Annexure
09/02/2017


PPA
09/02/2017


Order Passed on
09/02/2017


701 26/2016 M/s Real Power Pvt. Ltd.

Petition under section 86(1)(f) of the Electricity act, 2003, against with holding partial payment for fixed cost due to revision of advance scheduled for the month of July 2014 and not supplying at least 70% power as per scheduleding . 29/04/2016
Proceeding
Order Passed on
18/10/2016


702 27/2016 Suo Motu CSPDCL

Miscellaneous charges as per the provisions of the under section 46 of the Electricity Act, 2003. 05/05/2016
Proceeding
Order Passed on
30/06/2016


703 28/2016 Suo-Motu

बयोमॉस से बिजली उत्‍पादकों के टैरिफ बढोत्‍तरी के प्रस्‍ताव पर आपत्ति 23/05/2016
Proceeding
Order passed on
06/03/2018


704 29/2016 Suo Motu M/s Bhagwati Power & Steel Pvt. Ltd.

In the matter of generation & consumption of power plants in the State, for the year 2014-15. (Captive Status) 07/06/2016
Proceeding
Order Passed on
26/09/2016


705 30/2016 Suo-Motu M/s Salasar Steel & Power Limited

In the matter of generation & consumption of power plants in the State, for the year 2014-15. (Captive Status) 07/06/2016
Proceeding
Order Passed on
26/09/2016


706 31/2016 Suo-Motu M/s Jai Balaji Ind. Limited, Durg

In the matter of generation & consumption of power plants in the State, for the year 2014-15. (Captive Status) 07/06/2016
Proceeding
Order Passed on
03/10/2016


707 32/2016 Suo-Motu M/s NSPCL unit-II, Bhilai

In the matter of generation & consumption of power plants in the State, for the year 2014-15. (Captive Status) 07/06/2016
Proceeding
Order Passed on
06/10/2016


708 33/2016 Suo-motu M/s ACB India Pvt. Ltd.

In the matter of generation & consumption of power plants in the State, for the year 2014-15. (Captive Status) 07/06/2016
Proceeding
Order Passed on
26/09/2016


709 34/2016 Suo-motu M/s Bhilai Steel Plant (BSP)

Non filing of Tariff petition despite direction of the Commission. 16/06/2016
Proceeding
Disposed off on
06/01/2017

710 35/2016 M/s C.G. MIni Steel Plant Association
V/s
CSPDCL
Review of the Tariff order date 31.03.2016 & 30.04.2016 passed in P.No. 01 of 2016 (T) 02/07/2016
Proceeding
Order Passed on
25/10/2016


711 36/2016 M/s CG Steel Re-rollers Association
V/s
CSPDCL
Review petition with respect to tariff order date 30.04.2016 in P.No. 01 of 2016 (T) U/s 64(i) (f) of the E.A. 2003 read with relevant rules. 07/07/2016
Proceeding
Order Passed on
25/10/2016


712 37/2016 CSPDCL
V/s
M/s Godwari Power & Ispat Limited.
Seeking review of order dataed 06.06.2016 in P. No. 57 of 2015 (D) U/s 86(i)(f) of the E.A. 2003 08/07/2016
Proceeding
Order Passed on
01/12/2016


713 38/2016 M/s Ind Synergy Ltd.
V/s
CSPDCL
Petition under section 86 (i)(f) of the Electricity Act, 2003 against the bill raised for minimum contract demand charges for period of Dec. 2013 to April 2016. 12/07/2016
Proceeding
Order passed on
04/05/2018


714 39/2016 Suo-motu

Determinatiion of generic prefrencial tariff FY 2016-17 under regulation 8 of the CSERC (Terms & condition for determination of generic tariff) Regulation 2016. 13/07/2016
Proceeding
Order Passed on
08/09/2016


715 40/2016 M/s Shri Shyam Warehousing & Power Pvt. Ltd.
V/s
CSPDCL
Petition under section 86 (i)(f) of the Electricity Act, 2003 for payment of late payment surcharge of Rs. 85,60,258/- for the period of May 2013 to March 2016. 20/07/2016
Proceeding
Order Passed on
06/10/2016


716 41/2016 M/s Shanti G.D. Ispat & Power Pvt. Ltd.
V/s
CSPDCL
Petition under section 86 (i)(f) of the Electricity Act, 2003 for payment of late payment surcharge of Rs. 1,11,96,338/- for the period of September 2012 to March 2016. 20/07/2016
Proceeding
Order Passed on
06/10/2016


717 42/2016 M/s Jindal Power Ltd.
V/s
CSPDCL
Petition under section 86 (i)(f) of the Electricity Act, 2003 for payment of delayed payment surcharge on the period of April, May 2013. 28/07/2016
Proceeding
Order Passed on
25/10/2016


718 43/2016 M/s SKS Ispat & Power Ltd.
V/s
CSPDCL
Petition under section 86 (i)(f) of the Electricity Act, 2003seeking a direction from the Commission to direct CSPDCL to allow refund of surcharge to the petition. 01/08/2016
Proceeding
Withdraw on
02/09/2016

719 44/2016 CSPDCL

Review petition with respect to tariff order 2015-16 dated 06.06.2016 passed in P. No. 22/2016 (M) 05/08/2016
Proceeding
720 45/2016 Suo-Motu

Determination of generic preferential tariff for FY 2016-17 05/08/2016
Proceeding
Annexure
26/09/2016


Order Passed on
26/09/2016


721 46/2016 CSPDCL

Approval of draft power purchase agreement under section 86(i)(f) of the Electricity Act, 2003 for purchase of solar power from Rooftop solar power developers for existing and upcoming projects. 16/08/2016
Proceeding
722 47/2016 M/s API Ispat & Powertech (P) Ltd.
V/s
CSPDCL
Petition under section 86 (i)(f) of the Electricity Act, 2003 against illegal recovery of POC for the period from 18.02.2015 27.07.2015. 12/08/2016
Proceeding
Order passed on
05/09/2017


723 48/2016 M/s SKS Ispat & Power Ltd.
V/s
CSPDCL
Petition under section 86 (i)(f) of the Electricity Act, 2003 for fund of paralled operation charges (POC) recovered by the respondent in addition to payment in firm Power for power exported 20/08/2016
Proceeding
Order Passed on
20/09/2016


724 49/2016 Steel Authority of India Ltd., BSP
V/s
CSPDCL & M/s PRAXAIR India Pvt. Ltd.
For finalizing modalities of power supply to PRAXAIR India Pvt. Ltd. from petition captive power plant NSPCL PP-3 at petitioner factory premises. (M) 27/08/2016
Proceeding
Order Passed on
22/02/2017


725 50/2016 M/s Monnet Ispat & Energy Ltd.
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Petition under Regulation 44 of the CSERC (conduct of Business) 2009 for refund of amount paid to the respondent 31/08/2016
Proceeding
Withdraw on 09.11.2016
726 51/2016 M/s Monnet Ispat & Energy Ltd., Raigarh

Petition under section 86 (i)(f) of the Electricity Act, 2003 against illegal recovery of parallel operation charges (POC) amounting to Rs. 62,70,399/- (D) 01/09/2016
Proceeding
Order Passed on
08/02/2017


727 52/2016 Chhattisgarh State Power Distribution Company Limited (CSPDCL)

Approval of draft power purchase agreement under section 86(i) (f) of Electricity Act, 2003 for purchase of RE power from Biomass based generators where the existing PPA needs to be modified. 01/09/2016
Proceeding
728 53/2016 M/s Kalindi Power & Steel Ltd.
V/s
CSPDCL
Petition under section 86 (i)(f) of the Electricity Act, 2003 in the matter of delayed payment surcharge and amendment in PPA 01/09/2016
Proceeding
Order Passed on
18/01/2017


729 54/2016 Suo-motu M/s Ind Synergy Limited, Raigarh

Captive Power Plant for FY 2011-12 to 2014-15 (M) 07/09/2016
Proceeding
Order Passed on
13/04/2017


730 55/2016 CREDA
V/s
M/s API Ispat & Powertech Pvt. Ltd. & 52 others Respondents
Miscellaneous petitions under section 142 read with section 86 (i) (k) of the Electricity Act, 2003, in the matter of non-compliance of RPO for year 2014-15 (M) 09/09/2016
Proceeding
Order passed on
27/04/2018


731 56/2016 NRDA
V/s
CSPDCL
Restoration of Petition No. 55 of 2015 (M) 09/09/2016
Proceeding
Order Passed on
07/10/2016


732 57/2016 M/s SKY Alloys & Power (P) Ltd.
V/s
CSPTCL
Petition for unauthorized holding of excess amount collected by the respondent against work of construction of 33 kv pay even after finalization of it's completion report. (M) 15/09/2016
Proceeding
Disposed on
29/09/2016

733 58/2016 M/s Shree Cement Ltd.
V/s
CSPDCL
Petition under section 86 (i)(f) of the Electricity Act, 2003 pertaining to adjudication of dispate on account to wrongful billing of POC by D.L. 27/09/2016
Proceeding
Order Passed on
01/04/2017


734 59/2016 CSPDCL

Review petition with respect to order dated 26.03.2016 in petition no. 101 of 2015 (m), in the matter of capital Investment plants FY 2016-17 to FY 2020-21 07/10/2016
Proceeding
Order passed on
04/04/2018


735 60/2016 CSPDCL

PROTSAHAN YOJANA 2016 03/11/2016
Proceeding
Order Passed on
03/11/2016


736 61/2016 Suryakant Gupta, Proprietor, Solar Power Division,. Rajaram Maj Products

CSPDCL
आवेदन पत्र अंतर्गत धारा 142 विद्युत अधिनियम 2003 के अंतर्गत याचिका प्रस्‍तुत 04/11/2016
Proceeding
Order Passed on
03/03/2017


737 62/2016 M/s Shri Bajrang Power Ispat Ltd.
V/s
CSPDCL
Petition under section 86 (i)(f) of the Electricity Act, 2003 "Recovery of delayed payment surcharge" from the respondent for the period May 2012 to October 2014 (D) 18/11/2016
Proceeding
Order passed on
05/12/2017


738 63/2016 M/s S.K.S. Ispat Ltd.
V/s
CSPDCL
Initialing of proceeding under section 142 & 146 of the Electricity Act, 2003, for non-compliance of Commission order dt. 19.09.2016 in P. No. 99 of 2015 (D) 29/11/2016
Proceeding
Order passed on
01/09/2017


739 64/2016(T) CSPDCL

Petition for the approval of provisional true up FY 2015-16, determination of ARR of Tariff for 2017-2018 14/12/2016
Proceeding
Order Passed on
31/03/2017


740 65/2016(T) CSPTCL

Petition for provisional true up of ARR of FY 2015-16 alongwith de5termination tariff FY 2017-18 14/12/2016
Proceeding
Order Passed on
31/03/2017


741 66/2016(T) CSPGCL

Petition for true up of ARR of conventional thermal & Hydro Power Plants for FY 2015-16 14/12/2016
Proceeding
Order Passed on
31/03/2017


742 67/2016(T) CSLDC

Petition for the approval of SLDC's provisional true uip of FY 2016 and under section 62 & 64 of the Electricity act, 2003. 14/12/2016
Proceeding
Order Passed on
31/03/2017


743 01/2017(M) Raipur Development Authority (RDA)
V/s
CSPDCL
Review P. No. 88/2015 order date 25.10.2016 04/01/2017
Proceeding
Order Passed on
21/02/2017


744 02/2017(M) CREDA
V/s
M/s Alok Ferrow Alloys Ltd. & 47 others.
Miscellaneous petition under section 142 read with section 86(1) (k) of the Electricity Act, 2003, in the matter of non compliance of renewable purchase obligation (RPO) for the year 2015-16 09/01/2017
Proceeding
745 03/2017(M) C.G. Power Producers Association
V/s
CSPDCL
Petition for implementation & compliance of the order date 30.04.2016 in suo-motu P.No. 56 of 2015 (M). In the matter of methodology for billing of POC by CSPDCL 28/01/2017
Proceeding
Order Passed on
31/03/2017


746 04/2017(M) Raigarh Ispat Udyog Sangh
V/s
Jindal Steel & Power Ltd.
Petition for non-compliance of order date 23.12.2014 in P.No. 12 of 2014. changing tariff in excess of tariff determination by the Commission. (M) 01/02/2017
Proceeding
747 05/2017 (D) M/s Godawari Power Ispat Ltd.
V/s
Chhattisgarh Power Distribution Co. Ltd.
Compliance under section 142 of the Electricity Act, 2003 for non-compliance of the Commission's P.No. 04 of 2012 (D) 01/02/2017
Proceeding
Order passed by Honourable Chairman on
19/04/2018


Order passed by Honourable Member on
19/04/2018


Two separate order passed by Honourable Chairman and Honourable Member on 19/04/2018
748 06/2017(M) Chhattisgarh State Power Distribution Co. Ltd.

Review P.No. 100/2015 (M) 26.03.2016 (M) for capital investment plan for 3rd MYT control period FY 2016-17 to FY 2020-21 under section 94 of the Electricity Act, 2003. 02/02/2017
Proceeding
Order passed on
28/11/2017


749 07/2017(M) CSPDCL
V/s
NTPC
Petition for approval of power purchase agreement created between CSPDCL&NTPC, LARATPS 06/03/2017
Proceeding
750 08/2017(M) C.G. Ministeel Plant Associations
V/s
CSPDCL
Review of order dt. 30.06.2016 passed in suo-muto P. No. 27/2016(M) 20/03/2017
Proceeding
Order Passed on
13/04/2017


751 09/2017(T) BSP TEED

Petition for approval of FY 2013-14 to FY 2015-16, approval of ARR for 3rd MYT control period from FY 2016-17 to 2020-21. Download Petition 24/04/2017
Proceeding
Order passed on
27/12/2017


752 10/2017(D) M/s Rameshwaram Steel & Power Pvt. Ltd.
V/s
CSPDCL
Petition under section 86(i) (f) at the Electricity Act 2003 (POC) 03/05/2017
Proceeding
Order passed on
27/04/2018


753 11/2017 (M) Suo-Motu M/s ACB (I) Ltd. Korba

In the matter of generation & consumption of power plant in the state for the FY 2015-16. 05/05/2017
Proceeding
Order passed on
17/11/2017


754 12/2017(M) Suo-Motu M/s Devi Iron & Power Pvt. Ltd.

In the matter of generation & consumption of power plant in the state for the FY 2015-16. 05/05/2017
Proceeding
Order passed on
17/11/2017


755 13/2017(M) Suo-Motu M/s NSPCL

In the matter of generation & consumption of power plant in the state for the FY 2015-16. 05/05/2017
Proceeding
Order passed on
05/12/2017


756 14/2017(M) Suo-Motu M/s Spectrum Coal & Power Ltd.

In the matter of generation & consumption of power plant in the state for the FY 2015-16. 05/05/2017
Proceeding
Order passed on
17/11/2017


757 15/2017(M) Suo-Motu M/s Rashmi Sponge Iron & Power Ind. Ltd.

In the matter of generation & consumption of power plant in the state for the FY 2015-16. 05/05/2017
Proceeding
758 16/2017 C.G. Mini Steel Plant Association
V/s
CSPDCL
Review Tariff order date 31-03-2017 for the year 2017-18 in clause 11.02.4 load factor rebate 06/05/2017
Proceeding
Order passed on
30/06/2017


759 17/2017 C.G. Steel Re-roller Association
V/s
CSPDCL
Review petition against the tariff order dated 31-03-2017 for the FY 2017-18 in clause 11.2.4 of the order & supply voltage HV 4, 33KV supply 06/05/2017
Proceeding
Order passed on
13/06/2017


760 18/2017 CG Mini Steel PLant Association
V/s
CSPDCL
Petition for review of additional security deposit for energy under clause 6.9 of state supply code 2011 as amended 06/05/2017
Proceeding
Disposed off on 27.05.2017
761 19/2017(M) M/s Chhattisgarh State Small Hydro Power Developers Associations
V/s
Chhattisgarh State Power Distribution Co. Ltd. Chhattisgarh Renewable Energy Development Agency (CREDA) Chhattisgarh State Load Dispatch Center (SLDC)
Petition for waiver of declaration of capacity to SLDC in 15 minutes time block for small hydro power projects 15/05/2017
Proceeding
Order passed on
28/04/2018


Order passed on admission on
13/06/2017


762 20/2017(D) M/s KVK Bio Energy Pvt. Ltd.
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Petition U/s 86(1)(f) of the Electricity Act, 2003, to challenge the reduction in sale invoice for the month of Nov.2016 to recover such payment. 25/05/2017
Proceeding
Order passed on
17/11/2017


763 21/2017(M) Suo Motu

Chhattisgarh State Power Distribution Co. Ltd. (CSPDCL)] Raipur
Adoption of tariff under section 63 of the Electricity Act, 2003 for short term power Procurement by CSPDCL. 31/05/2017
Proceeding
Order passed on
20/06/2017


764 22/2017(M) Chhattisgarh Load Dispatch Centre (SLDC)

Review petition for the approval of SLDC's provisional true-up of FY 2015-16 and tariff order dated 31.03.2017 in petition No. 67 of 2016(T) 06/06/2017
Proceeding
Order passed on admission on
19/06/2017


765 23/2017(D) M/s Indra Powergen Pvt. Ltd.
V/s
Chhattisgarh State Power Distribution Ltd.
Petition U/s 86(i)(f) of the Electricity Act, 2003 with with regard to payment of generic tariff 27/06/2017
Proceeding
Order passed on
20/11/2017


766 24/2017(M) Suo-Motu

M/s. MSP Steel and Power Ltd.
Non compliance of Captive Power Plant CPP for the year 2015-16 04/07/2017
Proceeding
Order passed on
14/12/2017


767 25/2017(D) M/s. Balaji Power (A unit of M/s. Hira Ferro Alloys Ltd.)
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Petition U/s 86(1)(f) of the Electricity Act, 2003 to resolve dispute in the matters of illegal deduction of amount from power sale bills and monthly scheduling of power . 06/07/2017
Proceeding
768 26/2017(D) M/s. Indra Powergen Pvt. Ltd.
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Petition U/s 86(1)(f) of the Electricity Act, 2003 to resolve dispute in the matters of illegal deduction of amount from power sale bills and monthly scheduling of power . 07/07/2017
Proceeding
769 27/2017(D) M/s. Sudha Bio Power Pvt. Ltd.
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Petition U/s 86(1)(f) of the Electricity Act, 2003 to resolve dispute in the matters of illegal deduction of amount from power sale bills and monthly scheduling of power . 07/07/2017
Proceeding
770 28/2017(D) M/s. KVK Bio-Energy Pvt. Ltd.
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Petition U/s 86(1)(f) of the Electricity Act, 2003 to resolve dispute in the matters of illegal deduction of amount from power sale bills and monthly scheduling of power . 07/07/2017
Proceeding
771 29/2017(D) M/s. Real Power Pvt. Ltd.
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Petition U/s 86(1)(f) of the Electricity Act, 2003 to resolve dispute in the matters of illegal deduction of amount from power sale bills and monthly scheduling of power . 07/07/2017
Proceeding
772 30/2017(D) M/s. Agrawal Vidyut Ltd.
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Petition U/s 86(1)(f) of the Electricity Act, 2003 to resolve dispute in the matters of illegal deduction of amount from power sale bills and monthly scheduling of power . 07/07/2017
Proceeding
773 31/2017(D) M/s. Animesh Ispat Pvt. Ltd.
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Petition U/s 86(1)(f) of the Electricity Act, 2003 to resolve dispute in the matters of illegal deduction of amount from power sale bills and monthly scheduling of power . 07/07/2017
Proceeding
774 32/2017(D) M/s. Shanti G.D. Ispat Pvt. Ltd.
V/s
Chhattisgarh State Power Distribution Co.Ltd.
Petition U/s 86(1)(f) of the Electricity Act, 2003 to resolve dispute in the matters of illegal deduction of amount from power sale bills and monthly scheduling of power . 07/07/2017
Proceeding
775 33/2017(M) M/s. Godawari Power & Ispat Ltd.
V/s
Chhattisgarh State Power Distribution Co.Ltd.
Petition U/s. 142 of the Electricity Act, 2003 for non-compliance of the Commission's Order dated 30.04.2016 in Suo-Motu Petition No. 56 of 2016(M) 10/07/2017
Proceeding
Order passed on
08/05/2018


776 34/2017(M) Suo Motu

Respondent - M/s. Sarda Energy & Minerals Ltd.
Non-compliance of captive status for the FY 2015-16 12/07/2017
Proceeding
Closed
777 35/2017(D) M/s. Shanti G.D. Ispat Pvt. Ltd.
V/s
Chhattisgarh State Power Distribution Co. Ltd., Raipur
Petition U/s. 86(1)(f) of the Electricity Act, 2003 and advance scheduled for the month of August 2015. 25/07/2017
Proceeding
Order passed on
08/05/2018


778 36/2017(M) Suo Motu

Chhattisgarh State Power Distribution Co.Ltd.
In the matter of adoption of tariff determined through competitive bidding process in accordance with guidelines issued by Govt. of India under section 63 of the electricity Act, 2003 for short term power purchased by CSPDCL for a period between 08 August 2017 to October 2017. 09/08/2017
Proceeding
Closed
779 37/2017(M) Chhattisgarh State Power Distribution Co.Ltd.

In the matter of adoption of tariff determined through competitive bidding process in accordance with guidelines issued by Govt. of India under section 63 of the electricity Act, 2003 for short term power purchased by CSPDCL for a period between 08 August 2017 to October 2017. Download Petition 16/08/2017
Proceeding
Order Passed on
29/08/2017


Interim Order Passed on
16/08/2017


780 38/2017 M/s Azure Power India Pvt. Ltd.
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Petition Under Section 86(i) (e) of the Electricity Act, 2003 (M) 21/08/2017
Proceeding
781 39/2017 Chhattisgarh State Power Distribution Co. Ltd.
V/s
M/s I.A. Hydro Energy Pvt. Ltd.
Petition for approval of long term power purchase agreement between CSPDCL & Respondent from 3x12 MW (M) 22/08/2017
Proceeding
Order passed on
06/03/2018


Order passed on
15/11/2017


782 40/2017 M/s Suryakant Gupta, Rajaram Maze Products
V/s
Chhattisgarh State Power Distribution Co. Ltd.
आवेदन पत्र अंतर्गत धारा 86 (i) (के) विद्युत अधिनियम, 2003 के अंतर्गत सपष्‍टीकरण (clarification) के लिये याचिका प्रस्‍तुत 23/08/2017
Proceeding
Order passed on
14/11/2017


783 41/2017(M) Lanco Amarkantak Power Ltd.
V/s
Chhattisgarh State Power Trading Co. Ltd.
Petition under section 86(1)(b) of the Electricity Act, 2003. For approval of power procurement price and its's true up based on the bills 01/09/2017
Proceeding
784 42/2017 Chhattisgarh State Power Distribution Ltd.

Petition adoption of tariff for purchase of short-term RTC power determination through competitive bidding process in accordance with guidelines issued by Govt. of India under Sec 63 of Electricity Act, 2003 05/09/2017
Proceeding
Order passed on
20/09/2017


Interim order passed on
05/09/2017


785 43/2017 (T) M/s DB Power LTd.,
V/s
Chhattisgarh State Power Transmission Co. Ltd.
Petition under section 86 of the Electricity Act, 2003 for approval of energy (variable) charges and other reimbursable expenses for the period of 01.08.2015 to 31.03.2017 06/09/2017
Proceeding
786 44/2017 (T) M/s Jindal Power Ltd.
V/s
Chhattisgarh State Power Transmission Co. Ltd.
Petition under section 62 and 86(1) (a) of the Electricity Act, 2003 read with article 8 of the power purchase agreement dated 06.12.2013 read with Article 5.1 of the Power Sale Agreement dated 23.04.2015 for determination of tariff of Coal based Thermal Power Station with installed capacity of 2400 MW (consisting of 600 MW x 4 units) 06/09/2017
Proceeding
787 45/2017 Chhattisgarh State Power Distribution Co. Ltd.

In the matter of adoption of tariff for purchase of short-term RTC 200 MW additional power during September 2017 (13.09.2017 to 30.09.2017) and RTC 300 MW during October 2017 determined through competitive bidding process in accordance with guidelines issued by Govt. of India under section 63 of Electricity Act 2003 and approval for purchase beyond the ceiling rate prescribe by the Commission for this purpose. Download Petition 12/09/2017
Proceeding
Order passed on
20/09/2017


788 46/2017(M) M/s C.G. Steel Re-roller Association
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Seeking Amendment of Tariff order dt. 31.03.2017 passed in Petition No. 64/2017(T) with respect to retail tariff schedule of low load factor industries in HV-4 15/09/2017
Proceeding
Order passed on
31/10/2017


789 47/2017(M) M/s. S.K.S. Ispat & Power Ltd.
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Petition for issuance of directives to the Chhattisgarh State Power Distribution Co. Ltd. to allow the order dt. 30.04.2016 in petition No. 56/2015 for levying of parallel operation charges read with relevant rules. 15/09/2017
Proceeding
790 48/2017(M) M/s. Azure Power India Pvt. Ltd.
V/s
Chhattisgarh State Power Distribution Col. Ltd.
Restoration of the petition No. 38 of 2017(M) 15/09/2017
Proceeding
791 49/2017(T) 1. M/s. Sai Lilagar Power Generation Ltd. 2. M/s. KSK Mahanadi Power Co. Ltd.
V/s
1. Chhattisgarh State Power Trading Co. Ltd. 2. Chhattisgarh State Power Distribution Co. Ltd.
Petition U/s 62, 64(5), 86(1)(b) and other applicable provisions of the Electricity Act, 2003 for determination of tariff as per the terms of the power purchase agreement(PPA). 29/09/2017
Proceeding
792 50/2017(M) Chhattisgarh State Power Distribution Company Limited

In the matter of waiver of surcharge on outstanding power dues on Mandhar Cement factory in Raipur and Akaltara Cement Factory (M). 03/10/2017
Proceeding
Order passed on
08/11/2017


793 51/2017(M) M/s ACME Raipur, Solar Power Pvt. Ltd.
V/s
Chhattisgarh State Power Distribution Company Limited
Miscellaneous petition regarding exemption from paying demand charges for first five years and start up power connetion. 09/10/2017
Proceeding
794 52/2017(M) Chhattisgarh State Power Distribution Co. Ltd.
V/s
M/s. API Ispat and Powertech Pvt. Ltd.
Review petition under regulation 23 of CSERC (Conduct of Business) Regulation 2009 read with section 94(1)(f) of the Electricity Act, 2003. 09/10/2017
Proceeding
795 53/2017(M) M/s. Jai Balaji Industries Ltd.
V/s
Chief Electrical Inspector
In the matter of order dated 03.10.2016 in Suo Moto Petition No. 31 of 2016. 12/10/2017
Proceeding
Order passed on
27/11/2017


796 54/2017(M) Suo Moto

Chhattisgarh State Power Distribution Co. Ltd. -Respondent
Determination of miscellaneous and general charges 18/10/2017
Proceeding
Corrigendum Order Passed on
25/04/2018


Order passed on
19/04/2018


797 55/2017(M) अनुराग गुप्ता
V/s
विद्युत अधिनियम, 2003 की धारा 142 के अंतर्गत याचिका प्रस्‍तुत 06/11/2017
Proceeding
798 56/2017(M) M/s Akash Ispat Pvt. Ltd.(Unit-II)
V/s
Chhattisgarh State Power Distribution Company Limited
Miscellaneous peition under regulation 44 of the CSERC (Conduct of Business) Regulation, 2009, read with section 129 and section 142 of the Electricity Act, 2003. 06/11/2017
Proceeding
Order passed on
01/03/2018


799 57/2017(M) M/s Jindal Steel & Power Limited

Petition under section 86(1)(b) read with section 43 of the Electricity Act, 2003 seeking permission from the Commission to procure 100 MW Power from alternate sources as an interim measure till Jindal Steel & Power Ltd. (Distribution) overcomes the issue of scarcity of coal which is a force majure event and is beyond the control of Jindal Steel & Power Ltd. 06/11/2017
Proceeding
withdrawn on
08/12/2017

800 58/2017(M) South East Central Railways
V/s
Chhattisgarh State Power Distribution Company Limited
Review petition against the tariff order dated 31.03.2017 for under section 94(1)(f) of the Electricity Act, 2003. 13/11/2017
Proceeding
Disposed off on 14.12.2017
801 59/2017(M) South East Central Railways
V/s
Chhattisgarh State Power Transmission Company Limited Chhattisgarh State Power Distribution Company Limited
Application for seeking direction to respondnet for issuance of No Objection Certificate grant of Open Access. 13/11/2017
Proceeding
802 60/2017(M) M/s SKS Ispat & Power Ltd.
V/s
Chhattisgarh State Power Distribution Company Limited
Review petition of order dated 01.09.2017 passed in P.No. 63 of 2016(M), under section 94 of the Electricity Act, 2003. 13/11/2017
Proceeding
Order passed on
05/05/2018


803 61/2017(M) M/s. Sai Lilagar Power Generation Ltd.
V/s
1. Chhattisgarh State Load Despatch Centre 2. Chhattisgarh State Power Distribution Co. Ltd.
Petition under section 142 and 146 of the Electricity Act 2003 for issuing necessary directions against the above named respondent for non-compliance of the order dated 07.05.2015 of this Commission in the above mentioned matter and initiation penal action against the respondent. 01/12/2017
Proceeding
804 62 of 2017(M) M/s Bharat Aluminium Company Limited
V/s
1. Chhattisgarh State Power Trading Company Limited 2. Chhattisgarh State Power Distribution Company Limited
petition under section 62, 64(5), 86(1)(a), (b),(f) and (k) of the Electricity Act, 2003 read with CSERC (Terms and Condition of Tariff Regulation, 2014 and subsequence amandments for dertermination of variable cost of the 4x300 MW coal based powr projects for the period FY 2016-17 to 2020-21. 13/12/2017
Proceeding
805 63 of 2017 (M) M/s Seel Authority of India Limited (SAIL) Devision of Bhilai Steel Plant (BSP)
V/s
1. Chhattisgarh State Power Distribution Company Limited 2. NTPC-SAIL Power Company Limtid
Petition under section 86 of the Electricity Act, 2003 read with section 2(8), 9,38,39,40 and 42 of the Act and Rule 3 of the Electricity Rules, 2005 for directions in regards powre generation by NSPCL and supplied to the peititoner. 26/12/2017
Proceeding
806 64 of 2017 (M) अनुराग गुप्‍ता
V/s
आवेदन पत्र् स्‍वीकार किया जाकर अदम पैरवी में खारिज याचिक क्रमांक 55/2017 दिनांक 30.11.2017 को पुनर्स्‍थापित किये जाने बाबत्. 26/12/2017
Proceeding
Disposed off on
06/01/2018

807 65 of 2017(T) Suo-Motu

In the matter of determinationof generic preferenctial tariff for FY 2016-17 for biomass based plants under Regulation 8 of the CSERC (Terms and Condition for determination of generation tariff and related matters for electricity generated by plants based on renewable energy sources)Regulation 2012 and subsequent amendment thereof. 27/12/2017
Proceeding
Order passed on
07/02/2018


808 66 of 2017(T) Chhattisgarh State Power Distribution Company Limited

Petition for the approval of provisional true up FY 2016-17, determination of revised Annual Revenue Requirement (ARR) and tariff for FY 2018-19. 28/12/2017
Proceeding
Order passed on
26/03/2018


809 67 of 2017(T) Chhattisgarh State power Transmission Company Limited

Petition for provisional true up of Annual Revenue Requirement (ARR) of FY 2016-17 along with determination transmission tariff FY 218-19. 28/12/2017
Proceeding
order passed on
26/03/2018


810 68 of 2017(T) Chhattisgarh State Load Despatch Centre (SLDC)

Petition for the approval of SLDC's provisional true up of FY 2016-17 and under section 62 & 64 of the Electricity Act, 2003. 28/12/2017
Proceeding
Order passed on
26/03/2018


811 69 of 2017(T) Chhattisgarh State Power Generation Company Limited

Petition for provisional true up of Annual Revenue Requirement (ARR) of pre-existing conventional Thermal and Hydro Power for FY 2016-17. 29/12/2017
Proceeding
Order passed on
26/03/2018


812 01 of 2018(M) राजेन्‍द्र अग्रवाल प्रो. सी.एम.एम. इण्‍डस्‍टीज
V/s
कार्यपालन यंत्री (सं/सु.) छ.ग. रा.वि.वि.कं. मर्या., चांपा संभाग
विद्युत लोकपाल के आदेश दिनांक 14.02.2017 के अपालन के विरूद्ध आवेदन पत्र् अंतर्गत धारा 142 विद्युत अधिनियम, 2003. 02/01/2018
Proceeding
813 02 of 2018(M) राजेन्‍द्र अग्रवाल , प्रो. सी.एम.एम. इण्‍डस्‍टीज
V/s
कार्यपालन यंत्री (सं./सु.) छ.ग.रा.वि.वि.कं.मर्या., चांपा
विद्युत लोकपाल के आदेश दिनांक 27.04.2017 के अपालन के विरूद्ध आवेदन पत्र् अंतर्गत धारा 142 विद्युत अधिनियम, 2003. 02/01/2018
Proceeding
814 03 of 2018(M) अरविंद अग्रवाल, प्रो. अरविंद इण्‍डस्‍टीज
V/s
कार्यपालन यंत्री (सं./सु.) छ.ग.रा.वि.वि.कं.मर्या., चांपा
विद्युत लोकपाल के आदेश दिनांक 27.04.2017 के अपालन के विरूद्ध आवेदन पत्र् अंतर्गत धारा 142 विद्युत अधिनियम, 2003. 02/01/2018
Proceeding
815 04 of 2018(M) अंकुर अग्रवाल, प्रो. अंकुर इण्‍डस्‍टीज
V/s
कार्यपालन यंत्री (सं./सु.) छ.ग.रा.वि.वि.कं.मर्या., चांपा
विद्युत लोकपाल के आदेश दिनांक 27.04.2017 के अपालन के विरूद्ध आवेदन पत्र् अंतर्गत धारा 142 विद्युत अधिनियम, 2003. 02/01/2018
Proceeding
816 05 of 2018(M) Chhattisgarh State Power Distribution Company Limited

In the matter of adoption of tariff for purchase of Short Term TOD power varying from quantum 200 MW to 300 MW January 2018 to March 2018 and 400 MW RTC power during March's 2018 through competitive bidding process in accordance with guidelines issued by Govt. of India under section 63 of the Electricity Act, 2003. 02/01/2018
Proceeding
Order passed on
22/01/2018


817 06/2018 Suo - Motu

M/s. ACB India Ltd., ChaKabuda
Captive Status for the year 2016-17 08/01/2018
Proceeding
Order passed on
28/04/2018


818 07/2018 Suo-Motu

M/s. Spectrum Coal & Power Ltd., Korba
Captive Status for the year 2016-17 08/01/2018
Proceeding
Order passed on
28/04/2018


819 08/2018 Suo-Motu

M/s. NTPC Sail Power Company P. Ltd., Bhilai
Captive Status for the year 2016-17. 08/01/2018
Proceeding
Order passed on
04/05/2018


820 09/2018 Chhattisgarh State Power Distribution Co. Ltd.,Raipur

The petition for removal of difficulties and clarification in implementation of order dated 30.04.2016 passed in Suo-Motu P.No. 56 of 2015 for billing of PoC as per new methodology. 19/01/2018
Proceeding
821 10/2018 M/s. Chhattisgarh Mini Steel Plant Association
V/s
Chhattisgarh State Power Distribution Co. Ltd.
In the matter of applicability of terms and condition provided in tariff order FY 2017-18 in respect to calculation of load factor and subsequent rebate in HV-4 steel industries category. 27/01/2018
Proceeding
Order passed on
28/02/2018


822 11/2018 M/s. Sai Lilagar Power Generation Ltd.
V/s
1. Chhattisgarh State Power Trading Com Ltd. 2. Chhattisgarh State Power Distribution Com Ltd. M/s. KSK Mahanadi Power Co. Ltd.
U/s 86(1)(b) for approval of the amendment of Tariff and PPA on account of allocation of coal linkage under the SHAKTI Scheme of the Government of India. 27/01/2018
Proceeding
Order passed on
05/02/2018


823 12/218(M) M/s Parampujya Solar Energy Pvt. Ltd.
V/s
Chhattisgarh State Power Distribution Company Limited (CSPDCL)
Petition under section 86(i)(e) of the Electricity Act, 2003, in the matter of billing of consumption made in solar power projects under tariff category of HV-7. 08/02/2018
Proceeding
Order passed on
08/05/2018


824 13/2018(M) M/s Mahavir Energy & Coal Benefication Ltd.
V/s
Chhattisgarh State Power Distribution Company Limited
Petition for under section 86(i)(e) of the Electricity Act, 2003, with regard to payment of generic tariff. 16/02/2018
Proceeding
825 14/2018(M) M/s NMDC Iron & Steel Plant (A unit of NMDC Ltd.)
V/s
i. Managing Director, Chhattisgarh State Power Distribution Company Limited ii. Chief Engineer Chhattisgarh State Power Distribution Company Limited
Petition for rescheduling of the contract demand for supply of power in phased manner. 14/02/2018
Proceeding
826 15/2018(M) BalRam Sahu S/o S.R. Sahu Raigarh
V/s
K.C. Joshi (J.E.) Chhattisgarh State Power Distribution Company Limited
Petition under section 142 of the Electricity Act, 2003, for non compliance of Commissions rule and regulations. 16/02/2018
Proceeding
827 16/2018 बलराम साहू, रायगढ
V/s
कार्यपालन यंत्र, छत्‍तीसगढ राज्‍य विद्युत वितरण कं. लि., रायगढ सहायक यंत्री,
याचिका अतंर्गत धारा 7 सहपठित धारा 10, छ.ग. राज्‍य विद्युत नियामक आयोग (कार्य संचालन) विनियम, 2009. 22/02/2018
Proceeding
Order passed on
19/04/2018


828 17/2018 Jindal Steel and Power Limited

Petition under section 86)1)(B) of the Electricity Act, 2003 for approval of procurement of power through tariff based competitive bidding for the distribution business of JSPL 22/02/2018
Proceeding
829 18/2018 Lenco Amarkantak Power Limited
V/s
Chhattisgarh State Power Trading Co.Ltd.
Petition under section 86(1)(a) read with section 62 of the Electricity Act, 2003 for determination of tariff for supply of 35% power from 300 MW unit 2 coal based thermal power plant of M/s. Lanco Amarkantak Power to Chhattisgarh State Power Trading Co. Ltd. 23/02/2018
Proceeding
830 19/2018(M) M/s. Cement Corporation of India (CCI)
V/s
Chhattisgarh State Power Distribution Co. Ltd., Raipur
Review of order dated 08.11.2017 passed in P. No. 50/17(M), under section 94(i)(f) of the Electricity Act, 2003(M) 06/03/2018
Proceeding
831 20/2018(D) M/s. R.K.M. Powergen Pvt.
V/s
Chhattisgarh State Power Distribution Co. Ltd., Raipur
Petition U/s 86(i)(f) of the Electricity Act, 2003 06/03/2018
Proceeding
832 21/2018(M) लाल साय वर्मा, दुर्ग
V/s
स्‍टेट ऑफ छ.ग. व दो अन्‍य
याचिका अधिग्रहित भूमि के संबंध में अधिग्रहण के वर्ष 2012-13 के गाईड लाईन में निर्धारित दर के अनुसार गणना कर मुआवजा राशि दिलाये जाने बावत 13/03/2018
Proceeding
833 22/2018 M/s Vipul Vidhyut Pvt. Ltd.
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Petition U/s. 86(i)(f) of the Electricity Act, 2003, in the matter of additional power supplied during FY 2016-17 and 2017-18 26/03/2018
Proceeding
834 23/2018 M/s. API Ispat and Power Tech Pvt. Ltd. and
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Petition for modification of the agreement for supply unscheduled power signed between petitioner and respondent with affidavit. 26/03/2018
Proceeding
835 24/2018 Chhattisgarh State Power Distribution Co. Ltd.
V/s
1. NTPC 2. SAIL-BSP 3. CEI, Raipur
Miscellaneous petition for removal of difficulties in order dt. 05.12.2017 passed in suo-motu P.No. 13/2017(M) 27/03/2018
Proceeding
836 25/2018 श्रीमती रेश्‍मा गुलाबानी
V/s
याचिका पुनरीक्षण अभ्‍यावेदन अंतर्गत धारा 3 अनुाप्तियों के संकर्म नियम, 2006 27/03/2018
Proceeding
Order passed on
26/04/2018


837 26/2018 M/s. B.M. Industries
V/s
S.E. (City Circle-II) CSPDCL, Gudhiyari
In the matter of non-compliance of provisions and procedure laid in Supply Code, 2011 as amended under clause 11.15, 11.17 & 11.18 and section 126 of Electricity Act, 2003 for carrying provisional and Final Assessment and application to initiate proceedings under section 142 of Electricity Act, 2003 and section 33 of CSERC (Conduct of Business) Regulation, 2009. 02/04/2018
Proceeding
Order passed on
19/04/2018


838 27/2018 M/s. Khayati Pet Ind. Pvt. Ltd.
V/s
S.F. (City Circle-II), CSPDCL, Gudhiyar
In the matter of non-compliance of provisions and procedure laid in Supply Code, 2011 as amended under clause 11.15, 11.17 & 11.18 and section 126 of Electricity Act, 2003 for carrying provisional and Final Assessment and application to initiate proceedings under section 142 of Electricity Act, 2003 and section 33 of CSERC (Conduct of Business) Regulation, 2009. 02/04/2018
Proceeding
Order passed on
19/04/2018


839 28/2018 M/s. I.A. Hydro Energy Pvt. Ltd.
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Review of the order dated 06/03/2018 passed in Petition No. 39/2017(M) under section 94 of the Electricity Act, 2003(M) 10/04/2018
Proceeding
840 29/2018 Chhattisgarh Renewable Energy Development Authority
V/s
M/s. Jindal Steel & Power Ltd.
Petition under section 142 read with section 86(1)(k) of the Electricity Act, 2003 and in compliance of directions issued by the Commission vide letter dated 29.01.2018 10/04/2018
Proceeding
841 30/2018 Chhattisgarh Renewable Energy Development Authority
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Petition under section 142 read with section 86(1)(k) of the Electricity Act, 2003 and in compliance of directions issued by the Commission vide letter dated 29.01.2018 10/04/2018
Proceeding
842 31/2018(T) Chhattisgarh State Power Distribution Co. Ltd.

Petition for approval of revised capital cost, true up for FY 2015-16, provisional true up of FY 2011-17 and tariff determination for FY 2018-19 to 2020-21 for 2 X 500 MW Marwa Thermal Power Projects. 12/04/2018
Proceeding
843 32/2018(M) Chhattisgarh State Power Distribution Co. Ltd.

Review of the order dated 01.03.2018 passed in Petition No. 10 of 2016 (M) 10/04/2018
Proceeding
844 33/2018 M/s. Akash Ispat Pvt. Ltd.
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Review of the order dated 01.03.2018 passed in P. No. 56 of 2017 (M) 10/04/2018
Proceeding
845 34/2018 Chhattisgarh State Power Distribution Co. Ltd.

Petition for ex-post facto approval of dues settlement scheme "PROTSAHAN YOJNA-2017" for recovery of outstanding dues against Inactive Low Tension Consumers of the CSPDCL Raipur Under Section 62(5) of the Electricity Act, 2003 16/04/2018
Proceeding
846 35/2018(D) M/s. Tata Power Trading Co.Ltd.
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Petition U/s. 86(i)(f) of the Electricity Act, 2003 read four No. of LoAs dt. 29.09.2016 against unlawful deduction made from petitioner invoices. 19/04/2018
Proceeding
847 36/2018(M) Chhattisgarh state Power distribution Co.Ltd.

In the matter of approval of power supply agreement between CSPDCL and M/s. Solar Energy Corporation of India Ltd. (SECI) for purchase of 150 MW wind power on long-term basis from wind power projects set by SECI under guidelines for tariff based competitive bidding process notified by Ministry of Power (M) 23/04/2018
Proceeding
848 37/2018(M) Suo-Motu

In the matter of fixation of charges for grid connected solar projects haring capacity of 10KW for grid synchronization (M) 24/04/2018
Proceeding
849 38/2018 M/s D.B. Power Ltd.
V/s
Chhattisgarh State Power Distribution Co. Ltd.
Petition under section 86(1)(f) and 86(1)(k) read with section 2(30) of the Electricity Act, 2003 for separate dedicate transmission line and for quashing of wrongful imposition of various charges 18/05/2018
Proceeding
Contents provided by Chhattisgarh State Electricity Regulatory Commission
Site developed by- eWay Technologies & hosted by National Informatics Centre, Chhattisgarh State Unit.